Implementation of the Sixth Safety Five-Year Plan, “Group Safety Plan 2018”
First written in FY2016. 29 of 34 entries say "Advanced", first in FY2017-Q1. Latest entry: FY2026.
The whole theme swung hardest in 2024: 1 of 6 companies on the "Worse" side.
7 other companies' latest entry also says "Advanced".
- FY2026AdvancedAnnual report
「Work is under way to install platform screen doors at 330 stations and along 758 platforms on major conventional lines in the Tokyo metropolitan area. As of the end of fiscal 2025, installation had been completed at 162 stations and along 345 platforms, measured by line section.」
Platform screen door installation progressed from 140 stations and 288 platforms at the end of the previous fiscal year to 162 stations and 345 platforms. Additional safety measures were also introduced, including reviews of operating procedures in light of transportation disruptions, inspections and testing, and increased repair spending. - FY2026-H1AdvancedAnnual report
「As of the filing date of this semi-annual report, the following project was under way in the transportation business: Project: Transportation business — Platform screen door installation at Tokyo Station on the Shinkansen; ¥12,010 million; scheduled for completion by the end of fiscal 2029.」
For safety facility development, work began on installing platform screen doors at Tokyo Station on the Shinkansen. The total construction cost is ¥12.01 billion, with completion scheduled for the end of fiscal 2029. - FY2025AdvancedAnnual report
「Work is under way to install platform screen doors at 330 stations and along 758 platforms on major conventional lines in the Tokyo metropolitan area. As of the end of fiscal 2024, installation had been completed at 140 stations and along 288 platforms, measured by line section.」
Under the Eighth Five-Year Safety Plan, “Group Safety Plan 2028,” platform screen door installation had progressed to 140 stations and 288 platforms, measured by line section. - FY2024ReframedAnnual report
「As the final year of the Group Safety Plan 2023, the Group worked as one to advance and transform each employee’s “safety actions” and “safety management.”」
Following the final year of the Seventh Five-Year Safety Plan, the framework was updated to the Eighth Five-Year Safety Plan, “Group Safety Plan 2028,” formulated in November 2023. - FY2023AdvancedAnnual report
「By the end of fiscal 2022, platform screen doors had been installed at 99 stations and 197 tracks on a line-section basis, and installation at 12 stations and 24 tracks on a line-section basis was planned for fiscal 2023.」
Under the Group Safety Plan 2023, platform screen door installation progressed to 99 stations and 197 tracks on a line-section basis, and plans for additional installations in fiscal 2023 were also disclosed. - FY2023-Q3AdvancedAnnual report
「In addition, because the equipment development area for “ATACS Conversion Work on Major Tokyo Metropolitan Area Line Sections,” a transportation improvement project in the transportation business, was expanded, the planned total was changed to ¥61,091 million. During the first 3 quarters of the fiscal year, the company commenced the following project as a safety and reliable-transportation measure in the transportation business. Project Total construction cost (¥ million) Completion Transportation business Installation of Shinkansen bogie monitoring equipment 16,958 Fiscal 2026」
As safety and reliable-transportation measures, the company reported the expansion of the development area and increase in the planned total for ATACS conversion work, and the commencement of work to install Shinkansen bogie monitoring equipment. - FY2023-Q1RaisedAnnual report
「During the first quarter of the fiscal year, the planned total for “Platform Screen Door Installation on Major Tokyo Metropolitan Area Lines,” a safety and reliable-transportation measure in the transportation business, was changed to ¥190,011 million because the installation area was expanded.」
The planned total for platform screen door installation on major Tokyo metropolitan area lines was changed to ¥190,011 million following the expansion of the installation area. - FY2022AdvancedAnnual report
「By the end of fiscal 2021, platform screen doors had been installed at 92 stations and 183 tracks on a line-section basis, and installation at 7 stations and 14 tracks on a line-section basis was planned for fiscal 2022. In addition, “Smart Platform Screen Doors®,” which shorten construction periods and reduce costs, had been installed at 21 stations and 42 tracks by the end of fiscal 2021. The company aims to accelerate platform screen door deployment through continued proactive installation of “Smart Platform Screen Doors®.”」
Platform screen door installation progressed to 92 stations and 183 tracks on a line-section basis, while Smart Platform Screen Door installation reached 21 stations and 42 tracks. The company also disclosed plans for additional installations in fiscal 2022. - FY2022-Q3AdvancedAnnual report
「Under the Group Safety Plan 2023, the Group worked as one to advance and transform each employee’s “safety actions” and “safety management,” and to develop safety equipment using new technologies proactively. • Promoted platform screen door installation, completing work at 76 stations (87 stations on a line-section basis) by the end of December 2021」
Under the Seventh Five-Year Safety Plan, platform screen door installation progressed to 76 stations, or 87 on a line-section basis. - FY2022-Q2AdvancedAnnual report
「• Promoted platform screen door installation, completing work at 69 stations (80 stations on a line-section basis) by the end of September 2021 • Based on damage caused by the offshore Fukushima earthquake in February 2021, accelerated earthquake countermeasures for concrete electrification poles on Shinkansen viaducts」
Based on the Seventh Five-Year Safety Plan, “Group Safety Plan 2023,” the company advanced platform screen door installation and accelerated countermeasures for electrification poles in response to the offshore Fukushima earthquake. - FY2022-Q1AdvancedAnnual report
「Under the Group Safety Plan 2023, the Group worked as one to advance and transform each employee’s “safety actions” and “safety management,” and to develop safety equipment using new technologies proactively. • Promoted platform screen door installation, completing work at 66 stations (77 stations on a line-section basis) by the end of the first quarter of the fiscal year」
Under the Seventh Five-Year Safety Plan, platform screen door installation progressed to 66 stations, or 77 on a line-section basis. The company also developed specific measures for earthquakes and landslides. - FY2021AdvancedAnnual report
「• Promoted platform screen door installation, completing work at 61 stations (72 stations on a line-section basis) by the end of the consolidated fiscal year • Based on damage caused by river flooding and other events resulting from Typhoon Hagibis in 2019, introduced the Rolling Stock Evacuation Decision Support System, which supports decisions on evacuating rolling stock, at all 78 locations • Conducted running tests from September 2020 through January 2021 on the Hachiko Line for a new train control system using GNSS (Global Navigation Satellite System) and a mobile radio communications network, targeting introduction in fiscal 2024」
Platform screen door installation progressed to 61 stations, or 72 on a line-section basis, and the Rolling Stock Evacuation Decision Support System was introduced at all 78 locations. Running tests of the new train control system were also completed. - FY2021-Q3AdvancedAnnual report
「• Promoted platform screen door installation, completing work at 56 stations (67 stations on a line-section basis) by the end of the third quarter of the fiscal year • Introduced the Rolling Stock Evacuation Decision Support System, which supports decisions on evacuating rolling stock, at all 78 locations • Conducted running tests from September 2020 on the Hachiko Line for a new train control system using GNSS and a mobile radio communications network, targeting introduction in fiscal 2024 • Introduced an AI-based sudden-gust detection method in November 2020 into train operating restrictions using Doppler radar on sections of the Uetsu and Rikuu-West lines」
As initiatives under the “Group Safety Plan 2023,” the company advanced platform screen door installation, introduced the Rolling Stock Evacuation Decision Support System at all 78 locations, conducted running tests of a new train control system, and introduced an AI-based sudden-gust detection method. - FY2021-Q2AdvancedAnnual report
「• Promoted platform screen door installation, completing work at 51 stations (62 stations on a line-section basis) by the end of the second quarter of the fiscal year • Conducted operational trials of explosives-detection dogs in August 2020 at Tokyo, Ueno and Omiya stations as part of baggage inspections to enhance security • Based on damage caused by river flooding and other events resulting from Typhoon Hagibis in 2019, began operating the Rolling Stock Evacuation Decision Support System, which supports decisions on evacuating rolling stock」
Platform screen door installation progressed from 61 to 62 stations on a line-section basis from the previous quarter. The company implemented specific safety equipment and security measures, including operational trials of explosives-detection dogs and the launch of a new rolling stock evacuation decision support system. - FY2021-Q1AdvancedAnnual report
「Promoted platform screen door installation, completing work at 51 stations (61 stations on a line-section basis) by the end of the first quarter of the fiscal year.」
Completed platform screen door installations increased from 48 stations at the end of the previous fiscal year (57 on a line-section basis) to 51 (61 on the same basis). - FY2020AdvancedAnnual report
「• Completed deployment of simulators capable of training with actual video footage at all train crew workplaces by the end of March 2020 • Promoted further seismic reinforcement covering expanded target areas and facilities, based on the assumption of a major earthquake directly beneath the Tokyo metropolitan area and other events • Promoted platform screen door installation, completing work at 48 stations (57 stations on a line-section basis) by the end of the consolidated fiscal year」
Based on the safety plan, the company completed deployment of simulators at all train crew workplaces, and platform screen door installation progressed to 48 stations, or 57 on a line-section basis. - FY2020-Q3AdvancedAnnual report
「To reduce railway passenger accidents and other incidents on platforms, the company promoted platform screen door installation and completed work at 43 stations (51 stations on a line-section basis) by the end of the third quarter of the fiscal year.」
Completed platform screen door installations increased from 39 stations at the end of the previous quarter (45 on a line-section basis) to 43 (51 on the same basis). The company also advanced the introduction and use of a real-footage simulator, modifications for automatic detection of door cocks, and demonstration testing of explosives-detection dogs. - FY2020-Q2AdvancedAnnual report
「To reduce railway passenger accidents and other incidents on platforms, the company promoted platform screen door installation and completed work at 39 stations (45 stations on a line-section basis) by the end of the second quarter of the fiscal year.」
Completed platform screen door installations increased from 37 stations at the end of the previous quarter (43 on a line-section basis) to 39 (45 on the same basis). The company also began training using a real-footage simulator and measures to prevent doors from opening on the Tohoku Shinkansen. - FY2020-Q1AdvancedAnnual report
「To steadily reduce railway passenger accidents and other incidents on platforms, the company promoted platform screen door installation and completed work at 37 stations (43 stations on a line-section basis) by the end of the first quarter of the fiscal year.」
The number of stations where platform screen door installation had been completed increased from 36 at the end of the previous fiscal year (41 on a line-section basis) to 37 (43 on the same basis). - FY2019RestatedAnnual report
「In November 2018, the company formulated the Seventh Five-Year Safety Plan, “Group Safety Plan 2023.” The plan adopted “Evolution” and “Transformation” as its subtitle.」
The Seventh Five-Year Safety Plan, “Group Safety Plan 2023,” continues to serve as the framework for safety initiatives. - FY2019-Q3ReframedAnnual report
「Specifically, the company formulated the Seventh Five-Year Safety Plan, “Group Safety Plan 2023,” in November 2018 and, in its railway business, the Group worked as one to advance and transform each employee’s “safety actions” and “safety management,” and to develop safety equipment using new technologies proactively.」
The company moved from the Sixth Five-Year Safety Plan to the stage of formulating the Seventh Five-Year Safety Plan, “Group Safety Plan 2023,” in November 2018. Initiatives including safety training, seismic reinforcement, platform screen doors and security facilities also continued. - FY2019-Q2AdvancedAnnual report
「Based on the “Group Safety Plan 2018,” advanced work toward formulating the next Group Five-Year Safety Plan」
In addition to initiatives based on the current safety plan, the company moved toward examining the formulation of the next five-year plan. Seismic reinforcement, platform screen doors, security cameras, and security and self-defense equipment also continued to be developed. - FY2019-Q1AdvancedAnnual report
「To steadily reduce railway passenger accidents and other incidents on platforms, installation work progressed under the policy of installing platform screen doors at all 330 major conventional-line stations in the Tokyo metropolitan area by around the end of fiscal 2032. The company also advanced further seismic reinforcement covering expanded target areas and facilities, based on the assumption of a major earthquake directly beneath the Tokyo metropolitan area and other events. In addition, preparations progressed to expand the installation of security cameras inside Shinkansen and Tokyo metropolitan area conventional-line rolling stock, allowing passengers to use the railway with greater peace of mind.」
The company advanced platform screen door installation work at 330 stations, seismic reinforcement covering expanded target areas and facilities, and preparations to expand the installation of security cameras inside trains. - FY2018AdvancedAnnual report
「For platform screen doors, installation work progressed under the policy of installing them at all 330 major conventional-line stations in the Tokyo metropolitan area by around the end of fiscal 2032, and use began at 5 stations, including Ueno Station on the Keihin-Tohoku Line. In addition, a “Smart Platform Screen Door” was installed at Machida Station on the Yokohama Line, and testing continued toward practical implementation, with the aim of shortening construction periods and reducing costs.」
The company stated its policy of installing platform screen doors at 330 major conventional-line stations in the Tokyo metropolitan area by around the end of fiscal 2032, and began using them at 5 stations, including stations on the Keihin-Tohoku Line. Testing toward the practical implementation of Smart Platform Screen Doors also continued. - FY2018-Q3AdvancedAnnual report
「The company also advanced rail replacement work on the Tohoku Shinkansen, which had been in operation for 35 years. For platform screen doors, installation work progressed under the policy of installing them at all stations on the Yamanote Line and at all stations between Omiya and Sakuragicho on the Keihin-Tohoku and Negishi lines, and use began at 3 stations, including Ueno Station on the Keihin-Tohoku Line. In addition, a “Smart Platform Screen Door” was installed at Machida Station on the Yokohama Line, and testing continued toward practical implementation, with the aim of shortening construction periods and reducing costs. The company also promoted measures to prevent level-crossing accidents and expanded the line sections equipped with GPS-based train approach warning systems to improve the safety of maintenance workers. In addition, train operating restrictions in response to sudden gusts of wind using Doppler radar began in December 2017 on sections of the Uetsu and Rikuu-West lines.」
Platform screen doors began operation at 3 stations, including Ueno Station on the Keihin-Tohoku Line, and the company advanced testing of Smart Platform Screen Doors, expanded the line sections equipped with GPS warning systems, and began wind-related operating restrictions based on Doppler radar. - FY2018-Q2AdvancedAnnual report
「Specifically, based on the assumption of a major earthquake directly beneath the Tokyo metropolitan area and other events, the company steadily advanced seismic reinforcement measures and other initiatives totaling ¥300 billion, with fiscal 2012 through fiscal 2016 designated as the priority development period, completing approximately 80% of the total planned work. For platform screen doors, installation work progressed under the policy of installing them at all stations on the Yamanote Line and at all stations between Omiya and Sakuragicho on the Keihin-Tohoku and Negishi lines, and use began at Saitama-Shintoshin Station on the Keihin-Tohoku Line.」
In addition to confirming that approximately 80% of the seismic reinforcement work had been completed, the company began using platform screen doors at Saitama-Shintoshin Station on the Keihin-Tohoku Line. - FY2018-Q1AdvancedAnnual report
「With respect to safety, the company steadily implemented measures under the Sixth Five-Year Safety Plan, “Group Safety Plan 2018.” As further seismic reinforcement measures based on the assumption of a major earthquake directly beneath the Tokyo metropolitan area and other events, it considered expanding the areas covered by existing measures and examining new measures, taking into account the risk of damage to each facility and the impact on each line section. For platform screen doors, installation work progressed under the policy of installing them at all stations on the Yamanote Line and at all stations between Omiya and Sakuragicho on the Keihin-Tohoku and Negishi lines. The company also promoted measures to prevent level-crossing accidents and expanded the line sections equipped with GPS-based train approach warning systems to improve the safety of maintenance workers.」
Based on the safety plan, the company expanded the areas covered by seismic reinforcement, examined new measures, advanced platform screen door installation, and expanded the line sections equipped with GPS-based train approach warning systems. - FY2017AdvancedAnnual report
「The company steadily advanced seismic reinforcement measures and other initiatives totaling ¥300 billion, completing 80% of the total planned work by the end of the consolidated fiscal year as scheduled. Platform screen doors also began operation at Shinagawa Station on the Yamanote Line and Akabane Station on the Keihin-Tohoku Line.」
The seismic reinforcement plan reached 80% completion of the total planned work, and the number of stations where platform screen doors began operation also increased. - FY2017-Q3AdvancedAnnual report
「For platform screen doors, use began at Shinagawa Station on the Yamanote Line in August 2016, and the company decided to install them at all 37 stations between Omiya and Sakuragicho on the Keihin-Tohoku and Negishi lines. Installation work progressed at 7 of these stations, including Yurakucho Station. In addition, a new type of platform screen door was introduced on a trial basis at Machida Station on the Yokohama Line in December 2016 to shorten construction periods and reduce costs.」
The company designated all 37 stations on the Keihin-Tohoku and Negishi lines for installation, advanced construction at 7 stations, and introduced a new type of platform screen door on a trial basis. - FY2017-Q2AdvancedAnnual report
「For platform screen doors, use began at Shinagawa Station on the Yamanote Line in August 2016, while installation work began at 6 stations, including Akabane Station, on the Keihin-Tohoku Line.」
Platform screen doors began operation at Shinagawa Station on the Yamanote Line, and the number of stations covered by installation work expanded to 6, including Akabane Station. - FY2017-Q1AdvancedAnnual report
「With respect to safety, the company steadily implemented measures under the Sixth Five-Year Safety Plan, “Group Safety Plan 2018.” For platform screen doors, on the Yamanote Line, preparations were advanced for their introduction at Shinagawa Station in August 2016, while installation work began at 4 stations, including Akabane Station, on the Keihin-Tohoku Line. In addition to promoting measures to prevent level-crossing accidents, the company began using GPS-based train approach warning systems in April 2016 on the Hachiko and Iiyama lines to improve the safety of maintenance workers.」
In addition to implementing the safety plan, the company reported concrete progress, including the start of construction at 4 stations for platform screen doors and the launch of GPS-based train approach warning systems. - FY2016First statedAnnual report
「Based on the assumption of a major earthquake directly beneath the Tokyo metropolitan area and other events, the company steadily advanced seismic reinforcement measures and other initiatives totaling ¥300 billion, with fiscal 2012 through fiscal 2016 designated as the priority development period. By the end of the consolidated fiscal year, approximately 70% of the total planned work had been completed.」
The company implemented seismic reinforcement, platform screen doors, level-crossing measures and train approach warning systems.