Phil Company (3267) · InitiativeDecline in contract ordersLatest Earnings (2026-10-13): "Other"

Aerial retail business utilizing unused space above parking lots

First written in FY2016. 48 of 55 entries say "Advanced", first in FY2017-Q1. Latest entry: 2026-10-13.

55entries
10years
16from disclosures
Share on X
How it moved
ProgressHeldSoftenedWorseAdvancedFY2017-Q1 – FY2019AdvancedFY2021-Q2 – FY2025-H12017: 320172018: 420182019: 420192020: 420202021: 420212022: 420222023: 220232024: 320242025: 220252026: 252026
Same theme, other companies
Development of an above-parking-lot retail businessA theme 1 companies write about · 0 as a headwind · 1 as a tailwind

No other company in this theme has enough history to compare yet.

Full recordFilings, disclosures and news, newest first
  1. 2026-10-13OtherEarnings

    「当第3四半期連結会計期間における受注件数は10件(前年同期は7件)、受注高は1,604,842千円(前年同期は800,342千円)となりました。内訳は空中店舗フィル・パークの受注件数が1件(前年同期は3件)、受注高が738,772千円(前年同期は430,540千円)、プレミアムガレージハウスの受注件数が9件(前年同期は4件)、受注高が866,070千円(前年同期は369,802千円)となっております。」

    第3四半期会計期間では受注が増加した一方、累計では空中店舗フィル・パークの受注減少とプレミアムガレージハウスの増加が併存しており、全体として明確な一方向の変化とはしなかった。
  2. 2026-10-07AdvancedOther Disclosures

    「本プロジェクトは、高い知名度とブランド力を誇る世田谷区成城エリアにおいて、土地の仕入れから企画・設計、施工にいたるまで一貫して手がけた開発物件です。」

    開発物件「フィル・パーク成城学園前」が2026年8月に完成し、フィル・パークの具体的な開発実績が追加された。
  3. 2026-10-06Advancedwww.nikkei.com

    「Phil Company,Inc. disclosed the completion of the contracted project “Phil Park Kyoto Karasuma Rokkaku” in a timely disclosure.」

    The completion of a contracted project was disclosed as a new achievement, marking concrete progress in the aerial retail-space business, which makes use of unused space above parking facilities.
  4. 2026-10-06AdvancedOther Disclosures

    「この度全フロアにおいて出店テナントが決定いたしました。」

    「フィル・パーク京都烏丸六角」が2026年8月28日に竣工し、3階建て全3区画の出店テナント決定まで進んだ。
  5. 2026-09-30AdvancedOther Disclosures

    「こうした立地特性を最大限に活かした空間設計が評価され、竣工を迎える前に 1・2 階に美容室、3 階にピラティススタジオの出店が決定いたしました。」

    フィル・パーク市川が竣工し、地域の生活動線に合わせた空間設計と、竣工前の複数テナント出店決定が具体化した。
  6. 2026-09-15Advancednews.yahoo.co.jp

    「“Phil Park Warabi Station East” in Warabi, Saitama Prefecture, has been completed.」

    A specific Phil Park facility using space above a parking facility has been completed, adding to the company’s execution track record.
  7. 2026-09-10AdvancedOther Disclosures

    「建物 1 階部分にコインパーキングを残し、その上部空間(空中階)に建物を構築する当社グループ独自のアプローチを採用することで、駐車場収益を維持しながら新たな商業空間を創出しています。」

    請負案件「フィル・パーク蕨駅前」が完成し、駐車場上部の空中店舗モデルを具体的な竣工実績として示した。
  8. 2026-09-08Advancedprtimes.jp

    「By adopting the Group’s proprietary approach of retaining a coin-operated parking lot on the first floor of the building and constructing a building in the space above it, or the aerial floors, we create new commercial space while maintaining parking revenue.」

    A specific new property under the aerial retail-space Phil Park business was completed, adding to the execution track record of creating commercial space while maintaining parking revenue.
  9. FY2026-H1Decline in contract ordersAnnual report

    「During the interim consolidated accounting period, the "contract-ordering scheme" received 17 orders (23 in the same period of the previous year), with an order value of ¥1,815.753 million (¥2,714.965 million in the same period of the previous year).」

    Total contract order count and order value were below the same period of the previous year. Aerial Retail Fill-Park declined to 4 orders worth ¥690.340 million, while Premium Garage House generated 13 orders worth ¥1,125.413 million, matching the previous year's order count and increasing in order value.
  10. FY2025Decline in Fill-Park orders alongside an increase in total ordersAnnual report

    「During the consolidated fiscal year, the "contract-ordering scheme" received 54 contract orders (46 in the previous year), with an order value of ¥5,813.472 million (¥5,958.689 million in the previous year). The breakdown was 16 Aerial Retail Fill-Park contract orders (19 in the previous year), worth ¥2,889.675 million (¥3,991.894 million in the previous year), and 38 Premium Garage House contract orders (27 in the previous year), worth ¥2,923.796 million (¥1,966.795 million in the previous year). The order count reached a new record.」

    While total contract orders reached a record high, Aerial Retail Fill-Park was below the previous year in both order count and order value, while expanded orders for Premium Garage House drove the overall result.
  11. FY2025-H1AdvancedAnnual report

    「The breakdown was 10 Aerial Retail Fill-Park orders (7 in the same period of the previous year), with an order value of ¥1,831.005 million (¥1,085.149 million in the same period of the previous year).」

    First-half orders for Aerial Retail Fill-Park totaled 10, with an order value of ¥1,831.005 million, an increase in both count and value from the same period of the previous year.
  12. FY2024AdvancedAnnual report

    「During the consolidated fiscal year, the "contract-ordering scheme" received 46 contract orders (29 in the previous year), with an order value of ¥5,958.689 million (¥4,023.232 million in the previous year).」

    The contract-ordering scheme set new annual records for both order count and order value, comprising 19 Aerial Retail Fill-Park orders worth ¥3,991.894 million and 27 Premium Garage House orders worth ¥1,966.795 million.
  13. FY2024-Q2AdvancedAnnual report

    「During the second quarter consolidated accounting period, the "contract-ordering scheme" received 11 orders with an order value of ¥872.793 million, both record highs for a second quarter.」

    The contract-ordering scheme posted record highs for both order count and order value in the second quarter, bringing the cumulative totals to 21 orders and ¥1,963.432 million.
  14. FY2024-Q1AdvancedAnnual report

    「During the first quarter consolidated accounting period, the "contract-ordering scheme" received 10 contract orders with an order value of ¥1,090.639 million (¥677.786 million in the same period of the previous year), the highest first-quarter order count on record, while the order value exceeded ¥1 billion for the third consecutive quarter.」

    The contract-ordering scheme received 10 orders in the first quarter, with an order value of ¥1,090.639 million, setting a new record for a first-quarter order count. The order value exceeded ¥1 billion for the third consecutive quarter.
  15. FY2023AdvancedAnnual report

    「During the consolidated fiscal year, the "contract-ordering scheme" received 29 contract orders with an order value of ¥4,023.232 million (¥2,734.241 million in the previous year).」

    The contract-ordering scheme received 29 orders with an order value of ¥4,023.232 million, up 147.1% year on year and recovering to the ¥4 billion level for the first time since before the COVID-19 pandemic.
  16. FY2023-Q3AdvancedAnnual report

    「During the third quarter consolidated accounting period, the "contract-ordering scheme" received 9 contract orders with an order value of ¥1,117.648 million (¥602.125 million in the same period of the previous year), the highest third-quarter order value on record.」

    The contract-ordering scheme received 9 orders in the third quarter, with an order value of ¥1,117.648 million, setting a new record for a third quarter.
  17. FY2023-Q2AdvancedAnnual report

    「As the number of projects completed during the cumulative second quarter increased from the same period of the previous year, sales from higher-value construction contracts increased.」

    The number of projects completed during the cumulative second quarter increased from the same period of the previous year, leading to higher sales from construction contracts.
  18. FY2022-Q3AdvancedAnnual report

    「During the consolidated third quarter, 8 properties were completed and handed over under the “contract-ordering scheme,” with 5 orders received and order value of ¥602.125 million.」

    During the third quarter, 8 properties were completed and handed over under the contract-ordering scheme, and 5 orders with a value of ¥602.125 million were received. On a cumulative basis, 15 properties were completed and handed over, and 20 orders with a value of ¥1,936.881 million were received.
  19. FY2022-Q2AdvancedAnnual report

    「During the cumulative second quarter, 7 properties were completed and handed over under the “contract-ordering scheme.” There were no sales handovers under the “development-and-sale scheme.”」

    During the cumulative second quarter of the fiscal year ending November 2022, 7 properties were completed and handed over under the contract-ordering scheme. There were no sales handovers under the development-and-sale scheme.
  20. FY2022-Q1AdvancedAnnual report

    「During the cumulative first quarter, 3 properties were completed and handed over under the “contract-ordering scheme.” There were no properties sold and handed over under the “development-and-sale scheme.”」

    In FY2022-Q1, 3 properties were completed and handed over under the contract-ordering scheme, while there were no sales handovers under the development-and-sale scheme.
  21. FY2021AdvancedAnnual report

    「During the consolidated fiscal year, 16 properties were completed and handed over under the “contract-ordering scheme,” while 3 properties were sold and handed over under the “development-and-sale scheme.”」

    In FY2021, 16 properties were handed over under the contract-ordering scheme and 3 under the development-and-sale scheme.
  22. FY2021-Q3AdvancedAnnual report

    「During the cumulative third quarter, 7 properties were completed and handed over under the “contract-ordering scheme,” while 2 properties were sold and handed over under the “development-and-sale scheme.”」

    During the cumulative third quarter, 7 properties were completed and handed over under the contract-ordering scheme and 2 were sold and handed over under the development-and-sale scheme, building up handover results under both schemes.
  23. FY2021-Q2AdvancedAnnual report

    「During the cumulative second quarter, 3 properties were completed and handed over under the “contract-ordering scheme,” while 1 property was sold and handed over under the “development-and-sale scheme.”」

    During the cumulative second quarter, 3 properties were handed over under the contract-ordering scheme and 1 under the development-and-sale scheme, representing progress from zero handovers in the first quarter.
  24. FY2021-Q1Zero handovers in the first quarterAnnual report

    「During the cumulative first quarter, there were no properties completed and handed over under the “contract-ordering scheme” and no properties sold and handed over under the “development-and-sale scheme.”」

    During the first quarter, there were no handovers under either the contract-ordering scheme or the development-and-sale scheme, down from 1 contract-ordering handover in the same quarter of the previous year.
  25. FY2020AdvancedAnnual report

    「During the consolidated fiscal year, 28 properties, primarily projects ordered in the previous fiscal year, were completed. As the cumulative number of completed Phil Park properties increased, the Group was also able to continue attracting tenants steadily despite the COVID-19 pandemic.」

    A total of 28 properties, primarily projects ordered in the previous fiscal year, were completed. Completion and tenant attraction continued despite the COVID-19 pandemic.
  26. FY2020-Q3AdvancedAnnual report

    「During the cumulative third quarter, 21 properties, primarily projects ordered in the previous fiscal year, were completed. As the cumulative number of completed Phil Park properties increased, the Group also continued to attract tenants steadily despite the COVID-19 pandemic.」

    A total of 21 properties, primarily projects ordered in the previous fiscal year, were completed. Completed and handed-over properties under the contract-ordering scheme totalled 21 for the cumulative third quarter, while the cumulative number of sales handovers under the development-and-sale scheme was 0.
  27. FY2020-Q2Contract handovers continued while sales were deferredAnnual report

    「Under the “contract-ordering scheme,” properties were completed and handed over in line with the initial plan. During the cumulative second quarter, 8 properties were completed and handed over under the “contract-ordering scheme,” while 0 properties were sold and handed over under the “development-and-sale scheme.”」

    Under the contract-ordering scheme, a cumulative total of 8 properties were completed and handed over in line with the initial plan, while there were 0 sales handovers under the development-and-sale scheme.
  28. FY2020-Q1Decline in quarterly handover resultsAnnual report

    「During the cumulative first quarter, 1 property was completed and handed over under the “contract-ordering scheme,” while no property was sold and handed over under the “development-and-sale scheme.”」

    During the first quarter, 1 property was completed and handed over and 0 properties were sold and handed over, a decline from 3 contract-ordering properties and 1 development-and-sale property in the same quarter of the previous year.
  29. FY2019AdvancedAnnual report

    「The number of properties completed and handed over and the number of properties sold and handed over under the “contract-ordering scheme” and the “development-and-sale scheme” in each quarter of the consolidated fiscal year are as shown in the table below.」

    During the fiscal year ended November 2019, 24 properties were completed and handed over under the contract-ordering scheme, while under the development-and-sale scheme, 5 land-only properties and 6 land-and-building properties, for a total of 11 properties, were sold and handed over.
  30. FY2019-Q3AdvancedAnnual report

    「During the cumulative third quarter, 16 properties were completed and handed over under the “contract-ordering scheme,” while under the “development-and-sale scheme,” 2 land sales and 3 land-and-building sales were completed and handed over.」

    During the cumulative third quarter, 16 properties were completed and handed over under the contract-ordering scheme, while 2 land sales and 3 land-and-building sales were completed under the development-and-sale scheme.
  31. FY2019-Q2AdvancedAnnual report

    「During the cumulative second quarter, 7 properties were completed and handed over under the “contract-ordering scheme,” while under the “development-and-sale scheme,” 2 land sales and 2 land-and-building sales were completed and handed over.」

    During the cumulative second quarter, 7 properties were completed and handed over under the contract-ordering scheme, while 2 land sales and 2 land-and-building sales were completed under the development-and-sale scheme.
  32. FY2019-Q1AdvancedAnnual report

    「During the cumulative first quarter, 3 properties were completed and handed over under the “contract-ordering scheme,” while under the “development-and-sale scheme,” 1 land sale was completed and handed over.」

    During the first quarter, 3 properties were completed and handed over under the contract-ordering scheme, and 1 land sale was completed under the development-and-sale scheme.
  33. FY2018AdvancedAnnual report

    「Both the “contract-ordering scheme (services for existing landowners)” and the “development-and-sale scheme (services for real estate investors)” steadily delivered results, and all project properties scheduled for completion and handover during the consolidated fiscal year were completed and handed over.」

    All project properties scheduled for the year were completed and handed over under both schemes. Under the contract-ordering scheme, 24 properties were completed and handed over, while under the development-and-sale scheme, 2 land sales and 4 land-and-building sales were completed.
  34. FY2018-Q3AdvancedAnnual report

    「Against this backdrop, the Group’s aerial retail facility business, Phil Park, which has primarily enabled the use of “underutilised” space above car parks as commercial facilities and created unique value, steadily delivered results under both the “contract-ordering scheme (services for existing landowners)” and the “development-and-sale scheme (services for real estate investors),” supported by greater recognition and credibility following its listing on the Tokyo Stock Exchange Mothers market and capital and business alliances with various companies. All project properties scheduled for completion and handover during the cumulative third quarter were also completed and handed over. During the cumulative third quarter, 12 properties were completed and handed over under the contract-ordering scheme, while under the development-and-sale scheme, 1 land sale and 2 land-and-building sales were completed.」

    Under both the contract-ordering scheme and the development-and-sale scheme, all project properties scheduled for the cumulative third quarter were completed and handed over, producing 12 contract orders, 1 land sale and 2 land-and-building sales.
  35. FY2018-Q2AdvancedAnnual report

    「All project properties scheduled for completion and handover during the cumulative second quarter were completed and handed over.」

    All project properties scheduled for completion and handover during the cumulative second quarter were handed over.
  36. FY2018-Q1AdvancedAnnual report

    「Against this backdrop, the Group’s aerial retail facility business, Phil Park, which has enabled the use of “underutilised” space above car parks and created unique value, steadily delivered results under both the “contract-ordering scheme (services for existing landowners)” and the “development-and-sale scheme (services for general and institutional investors),” supported by greater recognition and credibility following its listing on the Tokyo Stock Exchange Mothers market and capital and business alliances with various companies. All project properties scheduled for completion and handover during the cumulative first quarter were also completed and handed over.」

    All project properties scheduled for completion and handover during the cumulative first quarter were handed over, demonstrating tangible results under both schemes.
  37. FY2017AdvancedAnnual report

    「All project properties scheduled for completion and handover during the consolidated fiscal year were completed and handed over.」

    All project properties scheduled for the consolidated fiscal year were completed and handed over. The number of newly completed and handed-over properties during the year was 29, including Property No. 100.
  38. FY2017-Q3AdvancedAnnual report

    「All project properties scheduled for completion and handover during the cumulative third quarter were completed and handed over.」

    All project properties scheduled for completion and handover during the cumulative third quarter were handed over, indicating progress in line with the plan.
  39. FY2017-Q1AdvancedAnnual report

    「Against this backdrop, the Group’s aerial retail facility business, Phil Park, which has enabled the use of “underutilised” space above car parks and created unique value, completed and handed over all project properties scheduled for completion and handover during the cumulative first quarter. Progress was on track against the earnings forecast announced on 13 January 2017.」

    All project properties scheduled for completion and handover in the first quarter were completed and handed over, indicating steady progress against the earnings forecast.
  40. FY2016First statedAnnual report

    「By using the “underutilised” space above car parks as retail space, we created a new “standard and value” of “car park + aerial retail facility (building).”」

    It describes its distinctive business of converting space above car parks into retail facilities as a new value that challenges conventional assumptions.
Moved together

"Accelerated expansion of the virtual storefront business leveraging its first-mover advantage" moved the same way as this thread, in the same document, in 28 of its 55 moves.

282320191816★123456
  1. ★This thread
  2. 1Accelerated expansion of the virtual storefront business leveraging its first-mover advantage28×
  3. 2New business model spanning land acquisition through the development and sale of upper-floor retail properties23×
  4. 3Diversifying tenant leasing through SPACE ON DEMAND20×
  5. 4Transition from minimum staffing to a staffing model with a buffer19×
  6. 5Increase in Orders and Order Backlog18×
  7. 6Creating Related Services and New Added Value16×

★ is this thread; numbers match the list above. The number on a line is how many documents both moved the same way in; lines between the other threads count the documents they moved together in too. Threads that move together often sit closer.

When this could move next
No upcoming earnings preview for Phil Company yet. It last moved in the Earnings of 2026-10-13: "Other".