Komori
Other Disclosures3267Phil Company,Inc.Construction and Materials

Notice of Completion of the Contracted Project "Fill Park Warabi Station Front"

In Warabi City, Saitama Prefecture, “Phil Park Warabi Station Front,” a commercial facility built above an existing coin-operated parking lot while retaining the parking lot, has been completed. Tenants scheduled to open in all units have also been finalized.

Worth reading
58In focus
0–100. This measures how worthwhile something is to read, not how good or bad the company is.
Direction
Improvement
Direction inferred from the company’s description.
Scale
859
m² (site area)
Wording
Conditional
How definitive the wording is.

Announced details

Phil Park Warabi Station Front
Applicable field (uses covered by this announcement)

Commercial tenants including restaurants, retail stores, educational facilities and clinics

Launch dateEach tenant will announce the opening date for its store or facility (the specific timing is not disclosed).
What the company reported numerically
Usage history

Tenants scheduled to open in all units have been finalized

Relationship between the counterparty and the company
Phil Company,Inc.3267
Relationship with the Company

The group’s proposal was adopted in response to the landowner’s wishes. The specific landowner and contractual relationship are not disclosed.

Location (as indicated in this announcement)

2-1-15 Tsukagoshi, Warabi City, Saitama Prefecture

Steel-frame construction, 3 above-ground floors, site area of 859 m², with a coin-operated parking lot on the first floor

In this announcement the company addresses none of Contract Value / Offering price / Impact on Business Performance.

Announced details
ItemDetails
Names of Products / Services CoveredPhil Park Warabi Station Front
Relationship with the CompanyThe group’s proposal was adopted in response to the landowner’s wishes. The specific landowner and contractual relationship are not disclosed.
Launch dateEach tenant will announce the opening date for its store or facility (the specific timing is not disclosed).
Applicable areaCommercial tenants including restaurants, retail stores, educational facilities and clinics
Location2-1-15 Tsukagoshi, Warabi City, Saitama Prefecture
Location scaleSteel-frame construction, 3 above-ground floors, site area of 859 m², with a coin-operated parking lot on the first floor
Usage historyTenants scheduled to open in all units have been finalized
Items this document does not state (11)
CounterpartyCounterparty overviewContract ValueOffering priceContract DateAward/certification nameAwarding / certifying bodyRegistration number and expiry dateQuantitative EffectsImpact on Business PerformanceSource

These are items the company does not state in this document. We do not leave them blank, nor fill them in from other sources or by inference.

The reasons the company gives

The company's own explanation, not something inferred from the numbers.

The project was adopted in response to the landowner’s desire to make effective use of the land and revitalize the area while maintaining revenue from the existing coin-operated parking lot.

How to read this page

This is not the documentKomori reads the disclosure the company filed and writes this summary. Figures are as stated by the company and are not audited.
Weight is not a verdictIt measures how much this changes what the company had already told the market. It is not a view on the shares.
Corrections happenIf the company reissues this disclosure, the page is rebuilt from the corrected version and the revision number moves up.
Notice of Completion of the Contracted Project "Fill Park Warabi Station Front" | Phil Company,Inc. (3267) timely disclosure | Komori