Komori
Japan Airport Terminal (9706) · InitiativeAdvanced

Business Continuity Plan (BCP) for a Sharp Decline in Air Travel Demand

First written in FY2020. 5 of 6 entries say "Advanced", first in FY2021-Q1. Latest entry: FY2026.

6entries
7years
0from disclosures
Share on X
How it moved
ProgressHeldSoftenedWorseAdvancedFY2021-Q1 – FY20262020: 220202021: 120212022: 020222023: 120232024: 020242025: 120252026: 12026
Same theme, other companies
Business continuity arrangements for a sharp decline in aviation demandA theme 1 companies write about · 1 as a headwind · 0 as a tailwind

No other company in this theme has enough history to compare yet.

Full recordFilings, disclosures and news, newest first
  1. FY2026AdvancedAnnual report

    「Strengthening the Response to Tokyo International Airport A2-BCP, Establishing the BCP Framework and Conducting Regular Drills」

    For business continuity planning, the company positioned Tokyo International Airport A2-BCP, establishment of the framework, and regular drills as ongoing response measures.
  2. FY2025AdvancedAnnual report

    「Strengthening the Response to Tokyo International Airport A2-BCP, Establishing the BCP Framework and Conducting Regular Drills」

    To prepare for a sharp decline in demand, natural disasters and accidents, the company identified Tokyo International Airport A2-BCP, establishment of the framework, and regular drills as response measures.
  3. FY2023AdvancedAnnual report

    「Strengthening the Response to Tokyo International Airport A2-BCP, Establishing the BCP Framework and Conducting Regular Drills」

    For the Business Continuity Plan to prepare for a sharp decline in air travel demand, natural disasters and other events, the company identified Tokyo International Airport A2-BCP, establishment of the framework, and regular drills as response measures.
  4. FY2021AdvancedAnnual report

    「In March this year, as the impact of declining revenue continued, the company raised a total of ¥56.7 billion through a public offering and other measures to secure funds for capital investment aimed at enhancing Haneda Airport's functions with a view to the post-COVID era.」

    As part of its BCP and financial response to a sharp decline in air travel demand, the company raised a total of ¥56.7 billion through a public offering and other measures, securing capital investment funds and liquidity.
  5. FY2021-Q1AdvancedAnnual report

    「In addition to the ¥9 billion under its existing commitment line agreement, the company newly established a ¥20 billion short-term borrowing facility and is securing the funds needed to continue operations. It is also taking measures to avoid the risk of funding shortages caused by declining revenue, including deferring payments for the use of state-owned property and utilising employment adjustment subsidies.」

    As specific BCP measures for a sharp decline in air travel demand, the company worked to secure the funds needed to continue operations through a short-term borrowing facility, payment deferrals, and the use of employment adjustment subsidies.
  6. FY2020First statedAnnual report

    「Going forward, the company will consult with the Ministry of Land, Infrastructure, Transport and Tourism, airlines and other stakeholders on social distancing and contactless measures. It will also further enhance its Business Continuity Plan (BCP) for the risk of a sharp decline in air travel demand resulting from unforeseen events, including funding and staffing arrangements, and develop an internal structure capable of responding promptly.」

    The company first set out specific measures based on a sharp decline in air travel demand caused by unforeseen events, including securing funding, arranging personnel, enhancing the BCP, and establishing an internal structure capable of responding quickly.
Moved together

"Airport Labor-Saving and Upgrading Through Next-Generation Robots" moved the same way as this thread, in the same document, in 5 of its 6 moves.

544433★123456
  1. ★This thread
  2. 1Airport Labor-Saving and Upgrading Through Next-Generation Robots5×
  3. 2Expansion of business areas and diversification of revenue4×
  4. 3Energy Efficiency and Environmental Conservation at Passenger Terminals4×
  5. 4Optimizing Work-Life Balance and Improving Work Efficiency4×
  6. 5A passenger terminal offering world-leading quality3×
  7. 6Terminal Renovation and Operational Improvements3×

★ is this thread; numbers match the list above. The number on a line is how many documents both moved the same way in; lines between the other threads count the documents they moved together in too. Threads that move together often sit closer.

When this could move next
Japan Airport Terminal's next results are scheduled for 2026-11-06. Read the earnings preview
News
No news is linked to this thread yet. When an article touches it, it will appear here by date.