Japan Airport Terminal (9706) · InitiativeAdvanced

Terminal Renovation and Operational Improvements

First written in FY2016. 28 of 34 entries say "Advanced", first in FY2017-Q1. Latest entry: 2026-11-06.

34entries
11years
4from disclosures
Share on X
How it moved
ProgressHeldSoftenedWorseAdvancedFY2019-Q2 – 2026-11-062016: 320162017: 420172018: 320182019: 420192020: 220202021: 220212022: 320222023: 320232024: 320242025: 220252026: 52026
Same theme, other companies

No other company in this theme has enough history to compare yet.

Full recordFilings, disclosures and news, newest first
  1. FY2026AdvancedAnnual report

    「In terms of facilities, we continue to work toward creating a safe, comfortable and advanced airport by seismic-proofing facilities and transport equipment, replacing aging equipment, and improving the energy efficiency of air-conditioning and lighting systems. Construction of the north satellite of Terminal 1 is progressing smoothly toward completion around May 2026. At Terminal 2, we began extension work on the north satellite to add 2 fixed stands as part of efforts to improve on-time performance.」

    Advanced construction of the north satellite of Terminal 1 toward completion around May 2026 and began extension work on the north satellite of Terminal 2.
  2. 2026-05-08AdvancedRevisions to earnings forecasts

    「In terms of facilities, we continue working to create a safe, comfortable and advanced airport. We are proceeding with seismic reinforcement of facilities and baggage-handling equipment, renewal of aging equipment, and energy-saving measures for air-conditioning and lighting equipment. Construction of the North Satellite at Terminal 1 is also progressing smoothly toward completion around July this year.」

    Reported continued equipment renewal, seismic reinforcement and energy-saving measures, and progress toward completion of the North Satellite at Terminal 1 around July 2026.
  3. FY2026-H1AdvancedAnnual report

    「The domestic Terminal 1 basement-one food court was renovated and reopened as “Sora chika,” a new dining zone bringing together a diverse range of outlets, including new concepts supervised by renowned establishments and brands making their first appearance in the Kanto region. At Terminal 1, “Musashino Mori Coffee” also opened on the fourth floor, along with 3 popular ramen restaurants, including “Machida Shoten” on the third-floor south terrace, and」

    Renovated and reopened the Terminal 1 basement-one food court as “Sora chika” and opened multiple new outlets, advancing improvements to terminal facilities and commercial operations.
  4. FY2025AdvancedAnnual report

    「In March this year, we connected the north satellite of Terminal 2 to the main building, eliminating the need for bus transfers between the satellite and the main building. In addition, we fully introduced “iino,” a multi-passenger autonomous mobility service, for the first time in Japan as a service supporting movement associated with the terminal expansion. The installation of 3 new fixed boarding bridges serving 5 stands also enabled us to end the swing operation under which some stands on the south side of the terminal alternated between domestic and international flights by time of day, and to operate them exclusively for international flights.」

    Completed the connection between the north satellite of Terminal 2 and the main building, added 3 fixed boarding bridges serving 5 stands, fully introduced iino, and ended swing operations.
  5. FY2025-H1AdvancedAnnual report

    「In terms of facilities, we are working to create a safe, comfortable and advanced airport by replacing aging facilities and equipment, including moving walkways, carrying out energy-saving work such as converting lighting to LED, and installing gates to prevent reverse flow at arrival exits. We are also proceeding with the redevelopment of commercial areas.」

    Advanced specific facility and operational improvements, including replacement of aging facilities and equipment, conversion of lighting to LED, installation of gates to prevent reverse flow at arrival exits, and redevelopment of commercial areas.
  6. FY2024AdvancedAnnual report

    「In addition to sequentially carrying out renovation and seismic-resistance work to prepare for large-scale disasters, we steadily advanced investment plans for the future, including connection work between the north satellite of Terminal 2 and the main building and construction of the north satellite of Terminal 1.」

    Continued disaster-prevention and seismic-resistance measures while advancing connection work at Terminal 2 and construction of the north satellite of Terminal 1.
  7. FY2024-Q3AdvancedAnnual report

    「In addition to sequentially carrying out renovation and seismic-resistance work to prepare for large-scale disasters, as well as replacement work for transport equipment and other facilities, we steadily advanced investment plans for the future, including connection work between the north satellite of Terminal 2 and the main building and construction of the north satellite of Terminal 1.」

    Advanced disaster-prevention and seismic-resistance renovations and transport-equipment replacements, as well as connection work for the north satellite of Terminal 2 and construction of the north satellite of Terminal 1, as ongoing investment plans.
  8. FY2024-Q2AdvancedAnnual report

    「In terms of facilities, we reopened the Terminal 2 international facilities in July after they had been closed because of the COVID-19 pandemic, in cooperation with the national government and airlines to respond to the rapid increase in international passenger traffic. We also proceeded with improvements to the in-terminal Wi-Fi communications environment and sequentially carried out renovation work to prepare for large-scale disasters and replacement work for aging transport equipment and other facilities.」

    Implemented specific facility and operational improvements, including reopening the Terminal 2 international facilities, improving in-terminal Wi-Fi, renovating facilities for disaster preparedness, and replacing transport equipment.
  9. FY2024-Q1AdvancedAnnual report

    「In terms of facilities and services, we worked with the national government and airlines to prepare for the reopening on 19 July of the Terminal 2 international facilities, which had been closed because of the COVID-19 pandemic, in response to the rapid recovery in international passenger traffic. In response to the end of the “Sign Phone” public telephone box service for people with hearing impairments, we also began a new pilot program for the “Telephone Relay Service,” the first of its kind at a domestic airport. In addition, we added “International Flights” as a new function for registering My Flights on the official Haneda Airport app, “Haneda Airport,” and worked to improve convenience for passengers with diverse needs and enhance the value of their time at the airport. We also steadily advanced our investment plans for the future by beginning connection work between the north satellite of Terminal 2 and the main building and proceeding with contractor selection for construction of the north satellite of Terminal 1.」

    Implemented specific facility, service and operational improvements, including preparations to reopen the Terminal 2 international facilities, a pilot program for the Telephone Relay Service, an international-flight function in the official app, and the start of satellite connection work.
  10. FY2023-Q3AdvancedAnnual report

    「In addition to sequentially carrying out renovation work to prepare for large-scale disasters, we steadily advanced our investment plans for the future, including beginning connection work between the north satellite of Terminal 2 and the main building. We also added new functions to the official Haneda Airport app to guide passengers through boarding based on the latest flight information and suggest ways to spend time at the airport according to their purpose of visit. In addition, we began offering the Haneda Airport Escort Service, previously introduced first on international flights, at domestic terminal facilities to provide services addressing diverse needs.」

    Began connection work between the north satellite of Terminal 2 and the main building, and implemented specific facility and operational improvements by adding new functions to the official app and launching the Haneda Airport Escort Service for domestic flights.
  11. FY2023-Q2AdvancedAnnual report

    「During the cumulative second-quarter period, we carried out renovation work sequentially to prepare for large-scale disasters and installed private work boxes suitable for remote work at various locations throughout the terminals. We also worked to improve passenger convenience in line with changing times by expanding the mobile battery-sharing service “ChargeSPOT.” Meanwhile, we cooperated with the Ministry of Economy, Trade and Industry’s request to conserve electricity by switching off some terminal lighting and controlling air-conditioning operations amid tight electricity supply and demand during the summer. In addition, we selected a contractor for connection work between the north satellite of Terminal 2 and the main building and are steadily advancing our investment plans for the future.」

    Implemented specific facility and operational improvements, including measures for large-scale disasters, private work boxes, expansion of ChargeSPOT, lighting and air-conditioning controls, and contractor selection for connection work to the north satellite of Terminal 2.
  12. FY2023-Q1AdvancedAnnual report

    「In terms of facilities, we are working to improve passenger convenience from the perspective of the new normal, including by installing private work boxes suitable for remote work at various locations, while cooperating with the Ministry of Economy, Trade and Industry’s request to conserve electricity by switching off some terminal lighting and controlling air-conditioning operations amid tight electricity supply and demand. We are also steadily advancing our investment plans for the future, including proceeding with the selection of a contractor for connection work between the north satellite of Terminal 2 and the main building.」

    Advanced the installation of private work boxes, lighting and air-conditioning controls, and contractor selection for connection work between the north satellite of Terminal 2 and the main building.
  13. FY2022-Q3AdvancedAnnual report

    「In terms of facilities, we are carrying out renovation work on specified ceilings with safety considerations in mind, as well as improvements to public wireless LAN facilities that will enhance services for customers, in stages.」

    Reported that improvement work on public wireless LAN facilities was being carried out sequentially as part of terminal operations and facility improvements.
  14. FY2021AdvancedAnnual report

    「Our company Ota-ku, Tokyo Facility management and operations Passenger Terminal 1 North Satellite (new construction) 20,000 ※1 185 Internal funds and borrowings November 2021 March 2024 ※2  Our company Ota-ku, Tokyo Facility management and operations Passenger Terminal 2 (expansion) 30,000 ※1 47 Internal funds and borrowings November 2021 March 2024 ※3」

    Outlined a facilities plan for a new north satellite at Terminal 1 and an expansion of Terminal 2, with total investments of ¥20 billion and ¥30 billion, work beginning in November 2021 and completion scheduled for March 2024.
  15. FY2021-Q3AdvancedAnnual report

    「To provide sufficient universal-design service facilities, we are pursuing various initiatives, including installing a "calm-down/cool-down space" in the secure area beyond the baggage inspection point for use by people with disabilities when they need to regain their composure.」

    As a specific universal-design measure, the company installed a "calm-down/cool-down space" in the secure area.
  16. FY2020AdvancedAnnual report

    「As part of the Ministry of Land, Infrastructure, Transport and Tourism's initiative to strengthen the functions of airports in the Tokyo metropolitan area, international flight slots increased by approximately 1.4 times on 29 March this year, and we completed the international terminal expansion and development project to accommodate the increase in slots.」

    The company completed the terminal expansion and development project to accommodate the approximately 1.4-fold increase in international flight slots.
  17. FY2020-Q3AdvancedAnnual report

    「As part of this effort, office space on the north side of Terminal 2 was expanded in October last year and leasing to airlines began. In December, two boarding gates in the expanded area of the international terminal began operating ahead of schedule, and the expanded departure and arrivals lobbies opened. In addition, the security-screening process was improved to enhance convenience in response to the increase in international passengers.」

    The company expanded and began leasing office space on the north side of Terminal 2, began operating two boarding gates and expanded lobby areas at the international terminal, and improved the security-screening process.
  18. FY2020-Q2AdvancedAnnual report

    「As part of this effort, additional office space on the north side of Terminal 2 was completed in October this year and will be leased to airlines from the second half of the fiscal year. In addition, renovation work on the first-floor arrivals lobby and basement level 1 of Terminal 1, which had been under way since October last year as part of efforts to further improve the in-terminal environment, was completed on 30 September, including the consolidation of arrivals exits and the development of a bus waiting area.」

    The company completed the expansion of office space at Terminal 2 and renovation work on the arrivals lobby and other areas of Terminal 1.
  19. FY2020-Q1AdvancedAnnual report

    「As part of this effort, development of passenger terminals associated with strengthening Haneda Airport's international-flight functions is proceeding as planned toward the start of operations in March 2020. In addition, renovation work at Terminal 1 is under way with the aim of completion by the end of September this year to further improve the in-terminal environment, and some facilities, including consolidated arrivals exits, information counters and toilets, opened by June.」

    As part of the Terminal 1 renovation, consolidated arrivals exits, information counters, toilets and other facilities opened by June.
  20. FY2019AdvancedAnnual report

    「In addition, renovation work has been under way at Terminal 1 since October last year to improve the in-terminal environment, while the expansion of the P4 car park in March this year increased its capacity, further improving passenger convenience.」

    The company continued renovation work at Terminal 1 and increased parking capacity through the expansion of the P4 car park.
  21. FY2019-Q3AdvancedAnnual report

    「On 19 December last year, we grand-opened "THE HANEDA HOUSE," a new commercial facility occupying the fifth floor of Haneda Airport Domestic Terminal 1 with 14 stores. By bringing together facilities offering experiential activities, we are developing an area that proposes new ways to spend time at Haneda Airport.」

    The company grand-opened the 14-store "THE HANEDA HOUSE" at Terminal 1, giving concrete form to commercial and operational improvements.
  22. FY2019-Q2AdvancedAnnual report

    「We are developing passenger terminals in preparation for the further expansion of international services at Haneda Airport. As part of this effort, we began operating the north-side boarding station at Domestic Terminal 2 for domestic passengers in May this year. We plan to begin operating the north-side satellite at Terminal 2 in December this year. Construction on the remaining expansion areas is also proceeding as planned toward the start of operations in March 2020. In addition, renovation work began at Terminal 1 in October this year to improve passenger convenience and the in-terminal environment.」

    The company began operating the north-side boarding station at Terminal 2, presented plans to begin operating the north-side satellite, and reported expansion work scheduled for completion in March 2020 and the start of renovation work at Terminal 1.
  23. FY2019-Q1RestatedAnnual report

    「Going forward, we will continue to identify the diverse needs of airport users and work to improve convenience, comfort and functionality, including measures for accessibility and responses to wayfinding requirements arising from the integrated operation of domestic and international passenger terminals.」

    The company specified accessibility measures and responses to wayfinding requirements arising from the integrated operation of domestic and international terminals as targets for facility and operational improvements.
  24. FY2018-Q3RestatedAnnual report

    「In addition to ensuring world-class safety as Japan's gateway, we will pursue comprehensive branding for Haneda Airport, including consecutive awards in SKYTRAX's airport ratings, while promoting regional revitalisation projects and introducing cutting-edge technologies. We will also expand our business scope by collaborating with companies in other industries and expanding beyond Haneda Airport, while working to firmly strengthen Haneda Airport's foundation through facility renovations and operational improvements to raise customer satisfaction and expand revenue at its domestic passenger terminals.」

    The company continued to present measures to improve customer satisfaction and revenue through facility renovations, operational improvements and greater efficiency.
  25. FY2018-Q2AdvancedAnnual report

    「Following the two lounges reopened in April this year, we reopened the third paid lounge, "POWER LOUNGE NORTH," at Haneda Airport Domestic Terminal 1 on 25 September, and renovated the shopping website "HANEDA Shopping" and the duty-free pre-order website "JAPAN DUTY FREE," among others.」

    The company presented specific facility and operational improvements through the reopening of "POWER LOUNGE NORTH" and the renovation of the shopping and duty-free pre-order websites.
  26. FY2018-Q1AdvancedAnnual report

    「Regarding expansion and revenue diversification by leveraging Haneda Airport's strengths, we reopened the paid lounges at Haneda Airport Domestic Terminals 1 and 2 in April this year under the name "POWER LOUNGE," among other initiatives.」

    The company demonstrated specific progress in facility renovations by reopening the paid lounges at Domestic Terminals 1 and 2 as "POWER LOUNGE."
  27. FY2017AdvancedAnnual report

    「Under buildings, we recorded construction to renew the central monitoring system at Haneda Airport Domestic Terminal 2, construct the North Pier lounge, and renovate the north-side passenger toilets at Haneda Airport Domestic Terminal 1 as additions for the current fiscal year. Under machinery and equipment, we recorded construction to make the passenger boarding bridges at Terminal 1 step-free.」

    The company presented specific renovation and renewal projects involving the terminal's central monitoring system, lounges, toilets and passenger boarding bridges as capital expenditure for the current fiscal year.
  28. FY2017-Q3RestatedAnnual report

    「In addition to ensuring world-class safety as Japan's gateway, we will pursue comprehensive branding for Haneda Airport, including consecutive awards in SKYTRAX's airport ratings, while promoting regional revitalisation projects and introducing cutting-edge technologies. We will also expand our business scope by collaborating with companies in other industries and expanding beyond Haneda Airport, while working to firmly strengthen Haneda Airport's foundation through facility renovations and operational improvements to raise customer satisfaction and expand revenue at its domestic passenger terminals.」

    The company continued to present measures to improve customer satisfaction and revenue through facility renovations, operational improvements and greater efficiency.
  29. FY2017-Q2RestatedAnnual report

    「We will expand our business scope by collaborating with companies in other industries and expanding beyond Haneda Airport, while also working to firmly strengthen Haneda Airport's foundation through facility renovations and operational improvements to raise customer satisfaction and expand revenue at its domestic passenger terminals.」

    The company continued to present measures to improve customer satisfaction and revenue through facility renovations, operational improvements and greater efficiency.
  30. FY2017-Q1AdvancedAnnual report

    「At Haneda Airport Domestic Terminal 1, we sought to improve convenience, comfort and functionality by enhancing the environment for receiving customers from Japan and abroad, including opening a multipurpose restroom equipped with fitting rooms, a nursing room and a children's toilet.」

    The company demonstrated specific progress in improving the customer environment through the opening of a multipurpose restroom.
  31. FY2016First statedAnnual report

    「We will also work to firmly strengthen Haneda Airport's foundation by renovating facilities and improving operations to raise customer satisfaction and expand revenue at Haneda Airport's domestic passenger terminals, while improving efficiency.」

    The company presented measures to improve customer satisfaction and revenue through facility renovations and operational improvements.
Moved together

"Expansion of business areas and diversification of revenue" moved the same way as this thread, in the same document, in 26 of its 34 moves.

261816151412★123456
  1. ★This thread
  2. 1Expansion of business areas and diversification of revenue26×
  3. 239,000 additional annual takeoff and landing slots and partial internationalization of Domestic Terminal 218×
  4. 3Capturing Spending by Foreign Visitors to Japan and Expanding the Tax-Free Business16×
  5. 4Energy Efficiency and Environmental Conservation at Passenger Terminals15×
  6. 5Comprehensive Branding for Haneda Airport14×
  7. 6A passenger terminal offering world-leading quality12×

★ is this thread; numbers match the list above. The number on a line is how many documents both moved the same way in; lines between the other threads count the documents they moved together in too. Threads that move together often sit closer.

When this could move next
Japan Airport Terminal's next results are scheduled for 2026-11-06. Read the earnings preview It last moved in the Revisions to earnings forecasts of 2026-11-06: "Advanced".
News
No news is linked to this thread yet. When an article touches it, it will appear here by date.