Japan Airport Terminal (9706) · RiskMitigated

Terminal Damage Caused by Earthquakes, Fires, Terrorism and Other Events

First written in FY2016. 3 of 7 entries say "Mitigated", first in FY2019. Latest entry: FY2026.

7entries
11years
0from disclosures
Share on X
How it moved
ProgressHeldSoftenedWorseFirst statedFY2016 – FY2017MitigatedFY2019 – FY2023-Q2RestatedFY2023-Q32016: 120162017: 120172018: 020182019: 220192020: 020202021: 020212022: 120222023: 120232024: 020242025: 020252026: 12026
Same theme, other companies
Risk of facility damage and airport function disruptions caused by disastersA theme 2 companies write about · 2 as a headwind · 0 as a tailwind

0 other companies' latest entry also says "Mitigated".

Ridges = years it wrote progress, valleys = years it wrote worse. Most hopeful companies at the back. Drag to turn, scroll to zoom, right-drag to pan. On a phone, two fingers turn and pinch to zoom; one finger scrolls the page.
Full recordFilings, disclosures and news, newest first
  1. FY2026MitigatedAnnual report

    「In addition to steadily implementing our long-term repair plan, including seismic reinforcement and disaster-prevention measures for facilities and the duplication and dispersal of critical facilities, we have formulated an effective business continuity plan (BCP) and are verifying and updating it through the development and dissemination of disaster-response manuals, the implementation of various types of training including training for responding to aircraft accidents, and the securing of emergency stockpiles.」

    It continued to develop a coordinated response to the risk of terminal damage caused by natural disasters and accidents through seismic reinforcement, duplication and dispersal of critical facilities, a BCP, training and stockpiles.
  2. FY2023-Q3RestatedAnnual report

    「We are also carrying out renovation work in stages to prepare for major disasters, among other measures.」

    It stated that renovation work was continuing in response to the risk of terminal damage caused by large-scale disasters.
  3. FY2023-Q2MitigatedAnnual report

    「During the first six months of the current consolidated fiscal year, on the facilities front, we have been carrying out renovation work sequentially in preparation for large-scale disasters, as well as」

    It stated that renovation work was being carried out sequentially in response to the risk of terminal damage caused by large-scale disasters.
  4. FY2019MitigatedAnnual report

    「In addition, following the occurrence last year of natural disasters beyond expectations, which also had a serious impact on the safety of airport terminal functions, we installed flood barriers to prevent flooding of the terminal basement as a further measure beyond our previous initiatives.」

    After natural disasters affected terminal functions, it implemented the installation of flood barriers to prevent basement flooding.
  5. FY2019-Q3MaterialisedAnnual report

    「Following the occurrence last year of natural disasters beyond expectations, which also had a serious impact on the safety of airport terminal functions,」

    It stated that natural disasters beyond expectations had occurred and had seriously affected the safety of airport terminal functions.
  6. FY2017RestatedAnnual report

    「We devote every effort to disaster preparedness, crime prevention and accident prevention so that passengers can use these passenger terminal buildings safely and comfortably. However, if an earthquake, fire, terrorist act or other event causes personal injury or property damage at an airport or passenger terminal building, it could have a material impact on the operating results and financial condition of our group.」

    While advancing disaster preparedness, crime prevention and accident prevention, it continued to identify personal injury and property damage caused by earthquakes, fires and terrorism as risks.
  7. FY2016First statedAnnual report

    「We devote every effort to disaster preparedness, crime prevention and accident prevention so that passengers can use these passenger terminal buildings safely and comfortably. However, if an earthquake, fire, terrorist act or other event causes personal injury or property damage at an airport or passenger terminal building, it could have a material impact on the operating results and financial condition of our group.」

    While advancing disaster preparedness, crime prevention and accident prevention, it identified personal injury and property damage caused by earthquakes, fires and terrorism as risks.
Moved together

"A passenger terminal offering world-leading quality" moved the same way as this thread, in the same document, in 3 of its 7 moves.

333322★123456
  1. ★This thread
  2. 1A passenger terminal offering world-leading quality3×
  3. 2Terminal Renovation and Operational Improvements3×
  4. 3Expansion of business areas and diversification of revenue3×
  5. 4Capturing Spending by Foreign Visitors to Japan and Expanding the Tax-Free Business3×
  6. 539,000 additional annual takeoff and landing slots and partial internationalization of Domestic Terminal 22×
  7. 6Comprehensive Branding for Haneda Airport2×

★ is this thread; numbers match the list above. The number on a line is how many documents both moved the same way in; lines between the other threads count the documents they moved together in too. Threads that move together often sit closer.

When this could move next
Japan Airport Terminal's next results are scheduled for 2026-11-06. Read the earnings preview
News
No news is linked to this thread yet. When an article touches it, it will appear here by date.