Reducing energy consumption and CO2 emissions through gas reuse equipment
First written in FY2023-Q2. 5 of 6 entries say "Advanced", first in FY2023. Latest entry: FY2026.
This thread is not in a theme yet. When the same subject shows up in other companies' filings, you can compare them here.
- FY2026AdvancedAnnual report
「CO₂ emissions intensity CO₂ emissions per unit of revenue Target to be set during the current fiscal year ― During the fiscal year under review, we worked to establish an emissions measurement system and refine our data collection.」
In addition to introducing solar power generation, the company has set CO₂ emissions per unit of revenue as a KPI and is working to establish an emissions measurement system and data collection processes ahead of setting a target during the current fiscal year. - FY2025AdvancedAnnual report
「Operations of the solar power generation system installed on the roof of the Saitama Plant began in July 2023, and installation of a similar system at the Wakayama Plant was completed in March 2025.」
Regarding solar power generation, the company states that, following the start of operations at the Saitama Plant, installation at the Wakayama Plant was completed in March 2025. - FY2024AdvancedAnnual report
「From July of the previous fiscal year (FY69), we completed the installation of a solar power generation system on the roof of the Saitama Plant and began operations. In the current fiscal year (FY70), we are also considering installing a similar solar power generation system at the Wakayama Plant.」
The solar power generation system at the Saitama Plant has been installed and brought into operation, and the company is considering the next phase, installation at the Wakayama Plant. - FY2024-Q1AdvancedAnnual report
「Furthermore, in June 2023, the company began operating a solar power generation system at its Saitama Plant to improve energy efficiency and reduce CO2 emissions.」
The solar power generation system at the Saitama Plant began operating in June 2023, moving energy-saving and CO2 reduction measures from the planning stage into actual operation. - FY2023AdvancedAnnual report
「The company is proceeding with the installation of a solar power generation system on the roof of its Saitama Plant, targeting full operation around August 2023. This is expected to reduce CO2 emissions and provide insulation that will help suppress temperature increases inside the plant. The estimated annual reduction in CO2 emissions is 31.65 t/year.」
In addition to gas reuse equipment, the company is proceeding with the installation of a solar power generation system on the roof of its Saitama Plant, targeting full operation around August 2023 and estimated annual CO2 reductions of 31.65 t. - FY2023-Q2First statedAnnual report
「To mitigate the impact of further increases in raw material costs and electricity charges, we implemented necessary measures, including reducing energy consumption and CO2 emissions through the introduction of gas reuse equipment, reviewing material procurement methods and strengthening production management.」
It explicitly states for the first time that, in response to higher raw material costs and electricity charges, the company introduced gas reuse equipment to reduce energy consumption and CO2 emissions.