Development and Adoption of Implant-Type Seawalls in Coastal Areas

First written in FY2016-Q3. 27 of 34 entries say "Advanced", first in FY2016. Latest entry: 2026-09-11.

34entries
11years
6from disclosures
Share on X
How it moved
ProgressHeldSoftenedWorseAdvancedFY2020-Q2 – 2026-09-112016: 220162017: 420172018: 320182019: 420192020: 320202021: 320212022: 320222023: 420232024: 120242025: 020252026: 72026
Same theme, other companies
Wider use of Implant seawalls for coastal seawalls and revetmentsA theme 1 companies write about · 0 as a headwind · 1 as a tailwind

No other company in this theme has enough history to compare yet.

Full recordFilings, disclosures and news, newest first
  1. 2026-09-11Advancedsingaporeshimbun.com

    「技研製作所、タイの護岸整備事業で「インプラント工法™」継続採用🔒」

    タイの護岸整備事業でインプラント工法が継続採用されたと報じられ、海外の沿岸防災用途での適用実績が示された。
  2. FY2024-Q2AdvancedAnnual report

    「As a result, the method was adopted for restoration of national highways damaged by typhoons, widening of national highway bypasses, seawall construction and fishing-port revetment improvements, among other projects, and the number of projects using it remained solid.」

    For coastal and disaster-prevention applications, adoption for seawall construction and fishing-port revetment improvements was reported, expanding the specific applications beyond the previous coastal and river revetment uses.
  3. FY2023AdvancedAnnual report

    「While adoption of the method remained solid, construction progressed smoothly on coastal levee renovation in Kochi Prefecture as a countermeasure against Nankai Trough megathrust earthquakes, revetment renovation in Tokyo as an earthquake and storm-surge countermeasure, revetment reinforcement in the Hijikawa River basin in Ehime Prefecture, which was affected by the July 2018 torrential rains in western Japan, and fishing-port revetment reinforcement in Hokkaido, among other projects.」

    The text provides specific progress on levee and revetment projects in Kochi, Tokyo, Ehime and Hokkaido for coastal and river disaster-prevention applications.
  4. FY2023-Q3AdvancedAnnual report

    「The number of projects using the method remained solid, including seismic-resilience works for aging fishing ports and port access roads, scour protection for bridges, new seawall construction, and permanent restoration of cut slopes that collapsed in torrential rain disasters.」

    In addition to coastal disaster-prevention applications such as seawalls, application expanded to fishing ports and port access roads, bridges, and slope restoration following torrential rain disasters.
  5. FY2023-Q2AdvancedAnnual report

    「As a result, adoption increased steadily for seismic reinforcement of river revetments, improvement of port revetments, restoration of national roads and diversion dikes damaged by torrential rains, and construction of retaining walls for expressway widening.」

    Adoption of Implant structures expanded in disaster prevention and mitigation applications, including coastal and river revetment renovation, disaster restoration, and retaining walls for expressway widening.
  6. FY2023-Q1AdvancedAnnual report

    「Among the projects undertaken by group company 株式会社技研施工, a large-scale project to construct a resilient coastal levee using an Implant structure in Ofunato, Iwate Prefecture, as part of restoration following the Great East Japan Earthquake, with a total length of 750 m, was completed in November 2022 after approximately 4 years and 1 month from the start of construction in October 2018.」

    The 750 m coastal levee project using an Implant structure in Ofunato, Iwate Prefecture, was completed after approximately 4 years and 1 month of construction.
  7. FY2022AdvancedAnnual report

    「In addition to infrastructure development such as seawalls for earthquake, tsunami and storm-surge countermeasures, river revetment renovation for flood control, expressway construction and port facility improvements, the method was also adopted for water barriers protecting private-sector factories from flooding as a pre-disaster measure. The scope of application expanded, and adoption increased steadily.」

    The scope of application expanded beyond coastal seawall development to river revetments, expressways, port facilities and water barriers at private-sector factories, and adoption of Implant structures continued to increase.
  8. FY2022-Q2AdvancedAnnual report

    「Focusing primarily on disaster prevention and mitigation and national resilience measures for the future, including renovation of seawalls to prepare for earthquakes, tsunamis and storm surges, and seismic retrofitting and flood-control improvements to coastal and river revetments」

    The scope of proposals has expanded beyond coastal seawall renovation to seismic retrofitting and flood-control measures for coastal and river revetments.
  9. FY2022-Q1AdvancedAnnual report

    「As part of efforts to move away from the principle of using earthen embankments, construction of an Implant Levee within the body of a river levee is progressing on the Kokubungawa earthquake and storm-surge countermeasure project in Kochi Prefecture. The plan is to monitor the behavior of the levee body, corrosion of the steel sheet piles and deformation over the long term in order to demonstrate the performance of the Implant Levee.」

    On the Kokubungawa project in Kochi Prefecture, construction of an Implant Levee within the river levee body has taken shape, with a plan to measure behavior, corrosion and deformation over the long term and demonstrate its performance.
  10. FY2021-Q3AdvancedAnnual report

    「In its domestic method-proposal activities, the company worked to expand the Implant Method's application range in road extension and improvement projects, including expressway renewal, port development projects involving the substantial deepening of quay walls, and liquefaction countermeasures at private-sector plants, while focusing on disaster recovery and reconstruction, disaster prevention and mitigation for the future, and national resilience initiatives. Adoption of the method increased steadily.」

    For disaster prevention and mitigation in coastal areas, application expanded beyond coastal levees to port development projects involving quay deepening, and adoption increased.
  11. FY2021-Q2AdvancedAnnual report

    「In its domestic method-promotion activities, the company worked to expand the Implant Method's application range in road extension and improvement projects, including expressway renewal, and port development projects involving the substantial deepening of quay walls, while focusing on disaster recovery and reconstruction, disaster prevention and mitigation for the future, and national resilience initiatives. Adoption of the method increased steadily.」

    For disaster prevention and mitigation applications in coastal areas, the scope of application expanded beyond coastal levees to port development, including deepening of quays, and expressway renewal, and adoption increased.
  12. FY2021-Q1AdvancedAnnual report

    「In its domestic method-promotion activities, the company worked to expand the Implant Method's application range, focusing on national resilience initiatives such as disaster recovery and reconstruction, advance disaster-prevention and disaster-mitigation measures, and measures to address aging social infrastructure. Adoption increased for coastal levee and quay-wall improvements and expressway renewal projects.」

    In addition to coastal levees and quay development, adoption increased for expressway renewal projects.
  13. FY2020-Q3AdvancedAnnual report

    「In domestic construction, although the start of some projects was delayed after the state of emergency was lifted, work generally progressed smoothly without any suspension. Projects included coastal levee construction in Iwate and Kochi prefectures, disaster restoration works following last year's typhoon damage, landslide-control works for the Kyushu Shinkansen, and expressway improvement works.」

    Specific domestic construction results progressed, including coastal levees in Iwate and Kochi prefectures, restoration following typhoon damage, landslide-control works for the Kyushu Shinkansen, and expressway improvements.
  14. FY2020-Q2AdvancedAnnual report

    「As a result, adoption of the Implant Method remained solid, and projects including coastal levee reinforcement and quay-wall improvements to accommodate cruise ships progressed.」

    For disaster-prevention works in coastal areas, specific construction results expanded to include coastal levee reinforcement and quay development to accommodate cruise ships.
  15. FY2020-Q1RestatedAnnual report

    「As in the previous fiscal year, adoption of our construction methods in disaster restoration and disaster prevention and mitigation projects remained solid. Levee and other projects continued in Iwate Prefecture, which was affected by the Great East Japan Earthquake, and in Kochi and Wakayama prefectures, where damage from a Nankai Trough megathrust earthquake is anticipated.」

    Levee projects continued in Iwate, Kochi and Wakayama prefectures, among others, and the company reiterated that adoption for disaster prevention and mitigation applications remained solid.
  16. FY2019RestatedAnnual report

    「As in the previous fiscal year, adoption of our construction methods in disaster restoration and disaster prevention and mitigation projects remained solid. Levee and other projects were carried out in Iwate and Miyagi prefectures, which were affected by the Great East Japan Earthquake, and in Kochi and Wakayama prefectures, where damage from a Nankai Trough megathrust earthquake is anticipated.」

    Levee projects continued in Iwate, Miyagi, Kochi and Wakayama prefectures, among others, and the company explained that adoption for disaster prevention and mitigation applications remained solid.
  17. FY2019-Q3RestatedAnnual report

    「As in the previous fiscal year, adoption of our construction methods in disaster restoration and disaster prevention and mitigation projects remained solid. Levee and other projects continued in Iwate Prefecture, which was affected by the Great East Japan Earthquake, and Kochi Prefecture, where damage from a Nankai Trough megathrust earthquake is anticipated.」

    Levee projects continued in Iwate and Kochi prefectures, and the company reiterated that adoption in disaster prevention and mitigation projects remained solid.
  18. FY2019-Q2AdvancedAnnual report

    「As in the previous fiscal year, adoption of our construction methods in disaster prevention and mitigation projects remained solid. We carried out levee projects in Iwate Prefecture, which was affected by the Great East Japan Earthquake, Kochi Prefecture, where damage from a Nankai Trough megathrust earthquake is anticipated, and Wakayama Prefecture, among others.」

    In addition to Iwate and Kochi prefectures, levee projects were carried out in Wakayama Prefecture, expanding the regions adopting the method for coastal and disaster-prevention applications.
  19. FY2019-Q1AdvancedAnnual report

    「In the current environment, adoption of the Implant Method has been expanding, including Implant Levees along the coasts of Wakayama and Shizuoka prefectures and river levee projects in the Tokyo metropolitan area, Osaka Prefecture and elsewhere.」

    Implant Levees were adopted in coastal areas of Wakayama and Shizuoka prefectures, and application expanded to river levee projects in the Tokyo metropolitan area and Osaka Prefecture.
  20. FY2018AdvancedAnnual report

    「As in the previous fiscal year, adoption of our construction methods in disaster prevention and disaster mitigation projects remained solid. In Hokkaido, where a sales office was opened in June, inquiries continued for projects including restoration works following the torrential rain disaster in Hokkaido in August 2016, and some were completed during the fiscal year under review.」

    Adoption of the Implant Method for disaster prevention and mitigation applications continued, with inquiries and completed projects added through disaster restoration works in Hokkaido.
  21. FY2018-Q2AdvancedAnnual report

    「Most of the Implant Levee projects ordered by the company for coastal levee improvement works in Kochi Prefecture as a countermeasure against Nankai Trough earthquakes have been completed. The company is now proceeding with proposals for construction methods and order-seeking activities for new seismic-resilience projects.」

    Most of the Implant Levee projects ordered in Kochi Prefecture have been completed, and the company has shifted to proposing construction methods and seeking orders for the next seismic-resilience projects.
  22. FY2018-Q1RestatedAnnual report

    「Based on the track record of coastal levee improvement works in Kochi Prefecture as a countermeasure against Nankai Trough earthquakes, and new seawall construction and height-raising works in Iwate and Miyagi prefectures as part of post-earthquake restoration, adoption of Implant Levees, which are resilient against earthquakes and tsunamis, is expanding nationwide.」

    The company continues to explain that adoption of Implant Levees is expanding nationwide, supported by its track record in Kochi, Iwate and Miyagi prefectures.
  23. FY2017RestatedAnnual report

    「Orders for Implant Levees, which are resilient against earthquakes and tsunamis, remained at a high level. Based on the track record of coastal levee improvement works in Kochi Prefecture undertaken as a countermeasure against Nankai Trough earthquakes, adoption for river levee reinforcement and other applications has expanded in Osaka, Tokushima and other areas. The Implant Method, including Implant Levees, has entered the nationwide adoption phase.」

    The company continues to report strong orders for Implant Levees, expanding adoption in Osaka, Tokushima and other areas, and entry into the nationwide adoption phase.
  24. FY2017-Q3RestatedAnnual report

    「In the press-in construction business, orders for Implant Levees, which are resilient against earthquakes and tsunamis, remained at a high level. In Iwate and Miyagi prefectures, where reconstruction projects are progressing, adoption is increasing for new seawall construction and height-raising works as a method that reduces labor requirements and manpower through systemized machinery. Based on the track record of coastal levee improvement works in Kochi Prefecture as a countermeasure against Nankai Trough earthquakes, adoption for river levee reinforcement and other applications has expanded in Osaka, Tokushima and other areas. The advantages of the Implant Method are steadily gaining acceptance, and the method has entered the nationwide adoption phase.」

    The company continues to report strong orders for Implant Levees, increased adoption for seawall projects in Iwate and Miyagi prefectures, and expanding adoption in Osaka, Tokushima and other areas.
  25. FY2017-Q2AdvancedAnnual report

    「In Iwate and Miyagi prefectures, where post-earthquake restoration works are progressing, adoption is increasing for new seawall construction and height-raising works as methods that reduce labor requirements and manpower through systemized machinery. As a countermeasure against Nankai Trough earthquakes, more than 10 km of coastal levee improvement works have been carried out in Kochi Prefecture. Based on this track record, adoption for river levee reinforcement is progressing in Tokushima and Osaka prefectures, among others. The advantages of the Implant Method are steadily gaining acceptance, and the method has entered the nationwide adoption phase.」

    Adoption for seawall projects has increased in Iwate and Miyagi prefectures. More than 10 km has been constructed in Kochi Prefecture, and adoption has expanded to Tokushima and Osaka prefectures, among others.
  26. FY2017-Q1AdvancedAnnual report

    「In addition to the conventional method of continuously pressing steel sheet piles and steel pipe piles into the ground to construct strong levee bodies, adoption is expanding for construction methods based on our proprietary technologies, including the Skip Rock Method, which enables rational wall construction at an early stage through staggered installation of steel pipe piles, and the Combi Gyro Method, which offers excellent water-tightness and rigidity with economic advantages. Construction results are steadily increasing in Iwate and Tokushima prefectures, as well as at Kochi Coast.」

    Adoption of the Skip Rock Method and Combi Gyro Method for Implant Levees is expanding, with construction results increasing in Kochi, Iwate and Tokushima prefectures, among others.
  27. FY2016AdvancedAnnual report

    「Development of the Implant Levee at Kochi Coast, undertaken since 2012 as a countermeasure against Nankai Trough earthquakes, has entered its fourth year, and work in the Nangoku section is continuing. As larger-diameter piles are increasingly used in levee and retaining-wall construction designed to withstand substantial external forces, the GRV2540 Gyro Piler, which can handle large-diameter steel pipe piles with a diameter of 2 m, began operating in March at a river improvement project in Sapporo, Hokkaido. Its track record is expanding, including adoption at a road retaining-wall project in Akiruno, Tokyo, together with the CB5-2 Clamp Crane, which handles large-diameter piles.」

    Development at Kochi Coast continued into its fourth year, and equipment for large-diameter piles with a diameter of 2 m was adopted for a project in Tokyo following its adoption in Hokkaido.
  28. FY2016-Q3First statedAnnual report

    「Development of Implant Levees is steadily progressing in coastal areas across Japan. In Shiogama, Miyagi Prefecture, the Combi Gyro Method (patent pending), which uses a combination of Hat-shaped Steel Sheet Piles 900 and steel pipe piles to construct an economical wall structure with excellent water-tightness and rigidity, was adopted for the first time in seawall restoration works. In Ofunato and Kamaishi, Iwate Prefecture, the Skip Rock Method, which enables rational wall construction at an early stage through staggered installation of steel pipe piles, was adopted for seawall redevelopment works, expanding its track record. Development of Implant Levees at Kochi Coast as a countermeasure against Nankai Trough earthquakes, which began in 2012, has entered its fourth year, and extension works in the Nangoku section remain scheduled.」

    The text describes the adoption of multiple construction methods, expansion of their track records, and planned extension works for coastal seawalls and disaster-prevention measures.
Moved together

"Recognition of the advantages of the implant construction method and its expanding adoption in various regions" moved the same way as this thread, in the same document, in 23 of its 34 moves.

232114131211★123456
  1. ★This thread
  2. 1Recognition of the advantages of the implant construction method and its expanding adoption in various regions23×
  3. 2Global Expansion Through Packaging of the Implant Construction Method21×
  4. 3Expansion of the Press-Fit Market Through Broader Applications and Coverage Areas14×
  5. 4Development of Equipment and Construction Methods for Diverse Construction Conditions, Pile Materials and Large-Diameter Piles13×
  6. 5GRB System Standardization and Package Rollout with Silent Piling Machines12×
  7. 6Increase in Capital and Capital Reserve Through Exercise of Stock Acquisition Rights11×

★ is this thread; numbers match the list above. The number on a line is how many documents both moved the same way in; lines between the other threads count the documents they moved together in too. Threads that move together often sit closer.

When this could move next
Giken's next results are scheduled for 2026-10-09. Read the earnings preview It last moved in the Other Disclosures of 2026-09-10: "Advanced".
Development and Adoption of Implant-Type Seawalls in Coastal Areas | GIKEN LTD. (6289) | Komori