GRB System Standardization and Package Rollout with Silent Piling Machines

First written in FY2016-Q3. 19 of 24 entries say "Advanced", first in FY2016. Latest entry: 2026-10-09.

24entries
11years
5from disclosures
Share on X
How it moved
ProgressHeldSoftenedWorseRestatedFY2017 – FY2018AdvancedFY2021 – 2026-10-092016: 220162017: 120172018: 120182019: 020192020: 320202021: 320212022: 320222023: 420232024: 120242025: 020252026: 62026
Same theme, other companies
Standardization and overseas expansion of the GRB SystemA theme 1 companies write about · 0 as a headwind · 1 as a tailwind

No other company in this theme has enough history to compare yet.

Full recordFilings, disclosures and news, newest first
  1. FY2026-H1AdvancedAnnual report

    「In Italy, we also sold a large specialised machine to a GTOSS member. The customer is carrying out embankment reinforcement works using the same model sold previously and the GRB System, which is being adopted for the first time in Italy, and made the purchase in anticipation of future business expansion.」

    In Italy, embankment reinforcement works using the GRB System, adopted for the first time in the country, progressed and led to the sale of a large specialised machine to a GTOSS member.
  2. FY2024-Q3AdvancedAnnual report

    「Following this phase, our construction method is expected to be selected as one of the standard methods for this project, which plans to rehabilitate 200 km, and made generally available to local specialist contractors and others. Our group has high expectations that standardisation of the method will create a substantial market for Gyro Pilers and other equipment, increasing demand for machinery sales and rentals to new users.」

    For the Amsterdam project, an agreement was signed on the framework for the commercialisation phase. Our construction methods, including the GRB System, were selected as one of the standard methods, advancing the project to the stage where a market for machinery sales and rentals is expected to develop.
  3. FY2023AdvancedAnnual report

    「The press-in phase of demonstration construction by G-Kracht B.V., a joint venture funded by group company Giken Europe B.V. (head office: the Netherlands), was completed in March, and all phases, including subsequent work, were completed in July.」

    Demonstration construction in Amsterdam using the electric GRB System and other methods was completed, reaching the stage of transition to the next commercialisation phase.
  4. FY2023-Q3AdvancedAnnual report

    「In the “New Technology Development Project for the Rehabilitation of the Canal Seawalls at a World Heritage Site,” the press-in phase of demonstration construction by G-Kracht B.V., a joint venture funded by group company Giken Europe B.V. (head office: the Netherlands), was completed in March.」

    For the Amsterdam project, demonstration construction using the GRB System and other methods progressed through completion of the press-in phase, and discussions advanced toward the next commercialisation phase.
  5. FY2023-Q2AdvancedAnnual report

    「The electric GRB System was deployed at the site in January. Work is progressing using “space-saving construction,” avoiding the felling of roadside trees, and the method has received high praise from the client for preserving the environment and visual appearance.」

    For the Amsterdam project, the electric GRB System was deployed at the site, and the client praised the preservation of the environment and visual appearance through space-saving construction.
  6. FY2023-Q1AdvancedAnnual report

    「Press-in construction using the electric Gyro Piler, which contributes to carbon neutrality, and the GRB System is progressing smoothly, with 271 steel pipe piles to be driven over a 208 m section by next spring.」

    For the Amsterdam project, the press-in phase of pilot construction using the GRB System began, covering a 208 m section and 271 piles.
  7. FY2022AdvancedAnnual report

    「Press-in construction using the electric Gyro Piler, which contributes to carbon neutrality, and the GRB System is scheduled to begin in November.」

    Following the signing of a contract with Amsterdam for demonstration construction involving the GRB System, the planned start of pilot construction using electric machinery became more concrete.
  8. FY2022-Q2AdvancedAnnual report

    「The newly developed electric GRB System for this project arrived at the site at the end of January, and preparations for pilot construction are under way.」

    The electric GRB System for the Amsterdam project arrived at the site, and the project progressed to the preparation stage for pilot construction.
  9. FY2022-Q1AdvancedAnnual report

    「For the new technology development project involving Amsterdam’s canal-seawall rehabilitation in the Netherlands, demonstration testing in Japan of the electric GRB System, conducted ahead of the pilot construction scheduled to begin in January 2022, was completed and preparations for shipment to the site were in place.」

    For the Amsterdam project, demonstration testing of the electric GRB System was completed and preparations for shipment to the site were in place.
  10. FY2021AdvancedAnnual report

    「Ahead of the pilot construction scheduled to begin in January 2022, detailed design and various monitoring plans are being developed locally, while demonstration testing of the newly developed electric GRB System is under way in Japan.」

    For the GRB System, detailed design and monitoring plans for the Amsterdam pilot construction and demonstration testing of the electric GRB System are progressing.
  11. FY2021-Q2SoftenedAnnual report

    「For Amsterdam’s canal-seawall rehabilitation project, detailed design of the seawall structure and machine development are under way ahead of demonstration construction from 2022.」

    Detailed design and machine development are under way for Amsterdam’s canal-seawall rehabilitation project, while the planned start of demonstration construction has been updated from the previous September 2021 to 2022.
  12. FY2021-Q1AdvancedAnnual report

    「For major projects, preparations progressed for the Amsterdam city canal-seawall rehabilitation project in the Netherlands, including the design of the seawall structure, machine development and establishment of the project framework, ahead of demonstration construction from September 2021.」

    For Amsterdam’s canal-seawall rehabilitation project, including the GRB System, design, machine development and establishment of the project framework progressed ahead of demonstration construction in September 2021.
  13. FY2020-Q3AdvancedAnnual report

    「Our Gyropress Construction Method and GRB System received the highest evaluation, and we entered into a cooperation agreement with the city. Going forward, 3 companies will conduct technical development and pilot construction, after which, subject to review, seawall rehabilitation works will initially be carried out for 4 years from January 2023, extendable to 8 years, covering up to approximately 1 km per year with an annual budget of approximately ¥2 billion.」

    The GRB System received the highest evaluation in the review of the Amsterdam city canal-seawall rehabilitation project, leading to a cooperation agreement and progress toward pilot construction and the work plan.
  14. FY2020-Q2ReframedAnnual report

    「In particular, the GRB System, which reduces labour requirements and shortens construction periods without requiring temporary works, is positioned as an essential construction system for resolving unsuccessful and failed tenders caused by labour shortages and enabling efficient public investment.」

    In addition to its previous positioning as a standard construction system and package for wider adoption, the GRB System is now also positioned as an essential system supporting public investment amid labour shortages.
  15. FY2020-Q1AdvancedAnnual report

    「In product development, the new Clamp Crane CB2-10, a pile lifting device and one of the main components of the GRB System, a temporary-works-free construction system that completes the entire press-in piling process on top of the piles, was completed in September and sales were launched.」

    The Clamp Crane CB2-10, a main component of the GRB System, was completed and sales were launched.
  16. FY2018RestatedAnnual report

    「Our group has worked from an early stage to improve construction efficiency by enhancing the Silent Piler press-in machines, and to improve productivity by systematising and prefabricating construction methods, including the GRB System.」

    The company continues to improve productivity through the systematisation and prefabrication of construction methods, including the GRB System.
  17. FY2017RestatedAnnual report

    「As Japan’s working-age population is expected to decline, improving productivity has become an unavoidable issue in the construction sector as well. Our group has worked from an early stage to improve construction efficiency by enhancing the Silent Piler press-in machines, and to improve productivity by systematising and prefabricating construction methods, including the GRB System.」

    The company describes improved productivity through the continued systematisation and prefabrication of construction methods, including the GRB System.
  18. FY2016AdvancedAnnual report

    「We will position this “GRB System” as the standard construction system for the Implant Construction Method and promote its wider adoption through package rollout in combination with the Silent Piler press-in machine.」

    The company continues to position the GRB System as its standard construction system, and has added the concrete development of the Myanmar government’s decision to introduce the Silent Piler F111 and the GRB System.
  19. FY2016-Q3First statedAnnual report

    「We will position this “GRB System” as the standard construction system for the Implant Construction Method and promote its wider adoption through package rollout in combination with the Silent Piler press-in machine.」

    The policy is to make the GRB System, which addresses work on water, in confined spaces and near railways, the standard construction system and promote its adoption in combination with press-in machines.
Moved together

"Global Expansion Through Packaging of the Implant Construction Method" moved the same way as this thread, in the same document, in 17 of its 24 moves.

171412121110★123456
  1. ★This thread
  2. 1Global Expansion Through Packaging of the Implant Construction Method17×
  3. 2Recognition of the advantages of the implant construction method and its expanding adoption in various regions14×
  4. 3Expansion of the Press-Fit Market Through Broader Applications and Coverage Areas12×
  5. 4Development and Adoption of Implant-Type Seawalls in Coastal Areas12×
  6. 5Development of Equipment and Construction Methods for Diverse Construction Conditions, Pile Materials and Large-Diameter Piles11×
  7. 6Strengthening Overseas Product Adoption, Sales and Maintenance Capabilities through U.S. and European Operations10×

★ is this thread; numbers match the list above. The number on a line is how many documents both moved the same way in; lines between the other threads count the documents they moved together in too. Threads that move together often sit closer.

When this could move next
Giken's next results are scheduled for 2026-10-09. Read the earnings preview It last moved in the Other Disclosures of 2026-10-09: "Advanced".