Komori
Giken (6289) · FactAdvanced

Recognition of the advantages of the implant construction method and its expanding adoption in various regions

First written in FY2016-Q3. 38 of 43 entries say "Advanced", first in FY2016. Latest entry: 2026-10-09.

43entries
11years
8from disclosures
Share on X
How it moved
ProgressHeldSoftenedWorseAdvancedFY2018-Q2 – 2026-10-092016: 220162017: 420172018: 420182019: 420192020: 320202021: 420212022: 220222023: 420232024: 420242025: 220252026: 102026
Same theme, other companies
Wider adoption of the Implant construction methodA theme 1 companies write about · 0 as a headwind · 1 as a tailwind

No other company in this theme has enough history to compare yet.

Full recordFilings, disclosures and news, newest first
  1. FY2025AdvancedAnnual report

    「As a result, adoption progressed for levee, revetment and quay construction involving rivers, coasts and ports, as well as bridge and retaining-wall construction related to roads, and the number of projects using the method remained solid.」

    Applications for the Implant Method expanded from rivers, coasts and ports to bridge and retaining-wall construction, and the number of projects using it remained solid.
  2. FY2025-H1AdvancedAnnual report

    「As a result, in public works, the method was adopted for road restoration following the Noto Peninsula Earthquake and torrential rain disasters, renewal of river and port revetments, and six-laning of expressways, among other projects, and the number of projects using the method remained solid.」

    Road restoration following the Noto Peninsula Earthquake and torrential rain disasters, renewal of river and port revetments, and six-laning of expressways were added to the applications for the Implant Method, and the number of projects using it remained solid.
  3. FY2024AdvancedAnnual report

    「As a result, the number of adoption projects progressed steadily, including river improvement for flood, tsunami and storm-surge control, restoration of roads damaged by torrential rains, repairs to aging levees, development of military bases as part of defense-facility resilience measures, and quay-wall construction at base ports for offshore wind power generation.」

    The range of applications for the Implant Method expanded to river improvement, disaster-related road restoration, levee repairs, defense facilities, and quay construction at offshore wind power base ports.
  4. FY2024-Q3AdvancedAnnual report

    「In recovery work following the 2024 Noto Peninsula Earthquake, activities by the temporary office opened in Kanazawa, Ishikawa Prefecture, the Noto Reconstruction Support Office, led the group's subsidiary Giken Seisaku Co., Ltd. to win an order to construct an earth-retaining wall supporting the road as part of widening work to convert the Noto Satoyama Kaido to 2 lanes for emergency restoration. The work was completed using the Silent Piler F112 and the GRB System.」

    For recovery from the Noto Peninsula Earthquake, the company completed earth-retaining wall work for converting the Noto Satoyama Kaido to 2 lanes using the F112 and GRB System, adding a specific adoption and construction track record for the Implant Method.
  5. FY2024-Q2AdvancedAnnual report

    「In its domestic method-proposal activities, the company worked to expand the use of the Implant Method, focusing on disaster recovery and reconstruction, disaster-prevention and disaster-mitigation measures, and national resilience initiatives. As a result, the method was adopted for restoration of national roads damaged by typhoons, widening of national road bypasses, construction of tsunami and storm-surge seawalls, and improvement of fishing-port revetments, among other projects, and the number of adoption projects progressed steadily.」

    Track records were added for the Implant Method's adoption in restoration of national roads damaged by typhoons, widening of national road bypasses, tsunami and storm-surge seawalls, and fishing-port revetment improvements, with the number of adoption projects progressing steadily.
  6. FY2024-Q1AdvancedAnnual report

    「As a result, adoption progressed steadily for restoration of prefectural roads that collapsed during torrential rains, road retaining walls for new high-standard road construction, river revetment improvements, and bridge foundations.」

    Specific domestic applications of the Implant Method included restoration of prefectural roads that collapsed during torrential rains, road retaining walls for high-standard roads, river revetments, and bridge foundations.
  7. FY2023AdvancedAnnual report

    「As a result, adoption progressed steadily for restoration of national roads and diversion dikes damaged by torrential rains, construction of new tsunami and storm-surge seawalls, seismic reinforcement of river revetments, improvement of port revetments, road widening, and bridge scour countermeasures.」

    The Implant Method's applications expanded to disaster recovery, tsunami and storm-surge seawalls, river and port revetments, road widening, and bridge-related measures.
  8. FY2023-Q3AdvancedAnnual report

    「As a result, adoption remained solid for seismic work on aging fishing ports and port access roads, scour countermeasures for bridges, construction of new tsunami and storm-surge seawalls, and full restoration of cut slopes that collapsed during torrential rains.」

    The Implant Method's applications expanded to seismic work on fishing ports and port access roads, bridge scour countermeasures, new tsunami and storm-surge seawalls, and slope restoration following torrential-rain disasters.
  9. FY2023-Q2AdvancedAnnual report

    「As a result, adoption increased steadily for seismic reinforcement of river revetments, improvement of port revetments, restoration of national roads and diversion dikes damaged by torrential rains, and construction of retaining walls for expressway widening.」

    The Implant Method's applications expanded to river revetments, port revetments, torrential-rain disaster recovery, and retaining walls for expressway widening, and the number of adoptions increased steadily.
  10. FY2023-Q1AdvancedAnnual report

    「As a result, adoption increased steadily for measures to prevent river levee settlement and seismic reinforcement of revetments in preparation for major earthquakes, seepage-control measures for river levees as part of basin-wide flood management, and national road widening projects.」

    The Implant Method's applications expanded to river levee settlement and seepage-control measures, seismic reinforcement of revetments, and national road widening projects, and the number of adoptions increased.
  11. FY2022AdvancedAnnual report

    「On National Route 219 in Kuma Village, Kumamoto Prefecture, and National Route 210 in Hita City, Oita Prefecture, where flooding caused road collapses, the group's subsidiary Giken Seisaku Co., Ltd. constructed resilient Implant structures for road retaining walls to prevent repeat disasters.」

    Adoption progressed for restoration of roads and bridges damaged by the July 2020 torrential rains and repeat-disaster prevention work. On National Routes 219 and 210, the company actually constructed road retaining walls using Implant structures. Applications also expanded to cut-off walls at private-sector plants and elsewhere.
  12. FY2022-Q2AdvancedAnnual report

    「In its domestic method-proposal activities, the company worked to expand the Implant Method's application range, focusing on disaster recovery and reconstruction, improvements to tsunami and storm-surge seawalls in preparation for earthquakes, tsunamis and storm surges, and coastal and river revetment improvements for seismic reinforcement and flood control as part of disaster prevention, disaster mitigation and national resilience initiatives. Applications also included road extension and improvement projects such as expressway renewal, port development involving the substantial deepening of quay walls, seismic reinforcement of irrigation ponds, liquefaction countermeasures at private-sector plants, and cut-off walls for flood control. As a result, adoption of the method increased steadily.」

    Applications expanded to tsunami and storm-surge seawalls, coastal and river revetments, irrigation ponds, liquefaction countermeasures at private-sector plants, and flood-control cut-off walls, and adoption of the method increased steadily.
  13. FY2021AdvancedAnnual report

    「In its domestic method-proposal activities, the company worked to expand the Implant Method's application range in road extension and improvement projects, including expressway renewal, port development projects involving the substantial deepening of quay walls, seismic reinforcement of irrigation ponds, and liquefaction countermeasures at private-sector plants, while focusing on disaster recovery and reconstruction, disaster prevention and mitigation for the future, and national resilience initiatives. Adoption of the method increased steadily.」

    Beyond conventional disaster-prevention and disaster-mitigation applications, adoption expanded to seismic reinforcement of irrigation ponds and liquefaction countermeasures at private-sector plants.
  14. FY2021-Q3AdvancedAnnual report

    「In its domestic method-proposal activities, the company worked to expand the Implant Method's application range in road extension and improvement projects, including expressway renewal, port development projects involving the substantial deepening of quay walls, and liquefaction countermeasures at private-sector plants, while focusing on disaster recovery and reconstruction, disaster prevention and mitigation for the future, and national resilience initiatives. Adoption of the method increased steadily.」

    The Implant Method's applications expanded beyond roads and ports to liquefaction countermeasures at private-sector plants, and the company stated that adoption increased steadily.
  15. FY2021-Q2AdvancedAnnual report

    「In its domestic method-promotion activities, the company worked to expand the Implant Method's application range in road extension and improvement projects, including expressway renewal, and port development projects involving the substantial deepening of quay walls, while focusing on disaster recovery and reconstruction, disaster prevention and mitigation for the future, and national resilience initiatives. Adoption of the method increased steadily.」

    The company stated that adoption of the Implant Method expanded beyond conventional disaster-prevention and disaster-mitigation projects to expressway renewal, extension and improvement projects and port development involving the substantial deepening of quay walls, with adoption increasing steadily.
  16. FY2021-Q1AdvancedAnnual report

    「In its domestic method-promotion activities, the company worked to expand the Implant Method's application range, focusing on national resilience initiatives such as disaster recovery and reconstruction, advance disaster-prevention and disaster-mitigation measures, and measures to address aging social infrastructure. Adoption increased for coastal levee and quay-wall improvements and expressway renewal projects.」

    Domestic adoption of the Implant Method expanded to coastal levees, quay walls and expressway renewal projects, and an increase in adoption was reported.
  17. FY2020-Q3AdvancedAnnual report

    「In its domestic method-promotion activities, the company worked to expand the Implant Method's application range, focusing on national resilience initiatives such as disaster recovery and reconstruction, advance disaster-prevention and disaster-mitigation measures for the future, and measures to address aging social infrastructure. Adoption of the method increased steadily.」

    The company stated that it was expanding the Implant Method's application range, primarily through domestic national-resilience projects, and that adoption was increasing steadily.
  18. FY2020-Q2AdvancedAnnual report

    「As a result, adoption of the Implant Method remained solid, and projects including coastal levee reinforcement and quay-wall improvements to accommodate cruise ships progressed.」

    The company added adoption track records for coastal levee reinforcement and quay-wall improvements to accommodate cruise ships.
  19. FY2020-Q1AdvancedAnnual report

    「The Implant Method's application range has continued to expand, encompassing measures for major earthquakes, advance measures against typhoons and torrential rains, disaster-prevention projects involving rivers and roads, the construction and widening of expressways, quay-wall improvements for cruise ships, and landslide prevention work related to Shinkansen projects. Since the Great East Japan Earthquake, it has accumulated a track record of 940 domestic projects. The press-in method, which offers advantages over other construction methods, has also been adopted for disaster recovery projects in Kanagawa Prefecture, Tokyo and elsewhere.」

    The Implant Method's applications expanded beyond disaster-prevention projects to expressways, quay walls and Shinkansen-related projects, and the company stated that it had accumulated a track record of 940 domestic projects.
  20. FY2019AdvancedAnnual report

    「During the period, adoption of the Implant Method expanded across disaster-prevention projects, including measures for major earthquakes, advance measures against typhoons and torrential rains, and disaster recovery work on rivers and roads, as well as the construction and widening of expressways, quay-wall improvements for cruise ships, and landslide prevention work related to Shinkansen projects, which generate sustained economic benefits. Its application range is expanding beyond disaster prevention measures alone.」

    The Implant Method's applications expanded from disaster-prevention projects to expressways, ports and landslide prevention work related to Shinkansen projects, among others.
  21. FY2019-Q3AdvancedAnnual report

    「Adoption of the Implant Method has expanded to expressway extension and improvement projects and port quay-wall deepening and improvement projects, while sales of Silent Pilers, primarily general-purpose models, remained strong.」

    The Implant Method's applications expanded to expressway and port improvement projects, and strong sales of Silent Pilers, mainly general-purpose models, were also reported.
  22. FY2019-Q2AdvancedAnnual report

    「The Hard-Ground Clear Construction Method, which enables press-in construction on hard ground such as cobble-containing gravel layers, has been adopted at multiple sites, including the Takahashi, Oda and Yoshii rivers.」

    The company added a track record of adopting Implant Method-related technologies at multiple flood-control sites in areas affected by the torrential rains in western Japan.
  23. FY2019-Q1AdvancedAnnual report

    「In the current environment, adoption of the Implant Method has been expanding, including Implant Levees along the coasts of Wakayama and Shizuoka prefectures and river levee projects in the Tokyo metropolitan area, Osaka Prefecture and elsewhere.」

    The company described the expansion of the Implant Method's adoption areas to the coasts of Wakayama and Shizuoka prefectures, the Tokyo metropolitan area, Osaka Prefecture and elsewhere.
  24. FY2018AdvancedAnnual report

    「Based on the track record of implementing Implant Levees in the coastal areas of Tohoku affected by the Great East Japan Earthquake and along the coast of Kochi Prefecture in response to a major Nankai Trough earthquake, adoption of the method has expanded to the Kinki region and elsewhere. In Kyushu, the first Landslide Prevention Method using the Implant Method was adopted, further expanding its application range.」

    The company stated that adoption had expanded to the Kinki region and elsewhere on the strength of the Implant Levee track record, and that the method had been adopted for the first time for landslide prevention.
  25. FY2018-Q3AdvancedAnnual report

    「In December last year, the advantages of the company's construction method were recognized and it was adopted for the first time in subway restoration and subway station rebuilding projects in Manhattan, New York City, following hurricane damage in the United States.」

    The Implant Method was adopted for the first time in subway restoration and station rebuilding projects in Manhattan, adding a specific track record of expansion in its geographic and application scope.
  26. FY2018-Q2AdvancedAnnual report

    「The Implant Method has also been adopted for landslide prevention work in mountainous areas and port improvement projects to accommodate large vessels such as cruise ships. Its advantages have been recognized, and its application range is expanding beyond disaster-prevention and disaster-mitigation projects.」

    The company stated that the Implant Method had also been adopted for landslide prevention and port improvement to accommodate large vessels, expanding its application range beyond disaster-prevention and disaster-mitigation projects.
  27. FY2018-Q1RestatedAnnual report

    「Against this backdrop, the Implant Method promoted by the group is increasingly being adopted throughout Japan as an advanced technology recognized for protecting lives and property from natural disasters and other such events.」

    The company has continued to explain that the Implant Method is recognized as a disaster-prevention technology and is increasingly being adopted throughout Japan.
  28. FY2017RestatedAnnual report

    「Against this backdrop, the Implant Method promoted by the group is increasingly being adopted throughout Japan as an advanced technology recognized for protecting lives and property from natural disasters and other such events.」

    The company has continued to explain that the Implant Method is recognized as a disaster-prevention technology and is increasingly being adopted throughout Japan.
  29. FY2017-Q3RestatedAnnual report

    「Against this backdrop, the Implant Method promoted by the group is increasingly being adopted in various locations as an advanced technology recognized for protecting lives and property from natural disasters.」

    The company has continued to explain that the Implant Method is recognized as a disaster-prevention technology and is increasingly being adopted in various locations.
  30. FY2017-Q2AdvancedAnnual report

    「For Nankai Trough earthquake countermeasures, the company has completed more than 10 km of coastal levee improvement work in Kochi Prefecture. Based on this track record, adoption for strengthening river levees is progressing in Tokushima Prefecture, Osaka Prefecture and elsewhere. The advantages of the Implant Method have steadily gained recognition, and the method has entered the nationwide adoption phase.」

    The company stated that its construction track record in Kochi Prefecture had exceeded 10 km, that adoption had expanded to Tokushima Prefecture, Osaka Prefecture and elsewhere on the strength of this track record, and that it had entered the nationwide adoption phase.
  31. FY2017-Q1RestatedAnnual report

    「The Implant Method has advantages based on the Five Principles of Construction, including the ability to rapidly build resilient structures integrated with the earth, and is increasingly being adopted in various locations as a technology recognized for protecting lives and property from natural disasters.」

    The company has continued to explain that the advantages of the Implant Method are being recognized and that its adoption is expanding in various locations.
  32. FY2016AdvancedAnnual report

    「The Implant Method promoted by the group is increasingly being adopted in various locations as a technology for protecting lives and property from natural disasters by quickly providing resilient structures integrated with the earth, with its advantages being recognized.」

    The advantages of the Implant Method have been recognized, and its adoption has expanded to coastal areas and river revetment projects in Japan.
  33. FY2016-Q3First statedAnnual report

    「The Implant Method promoted by the group is increasingly being adopted in various locations as a technology whose advantages are recognized for protecting lives and property by quickly providing resilient structures integrated with the earth.」

    The company described recognition of the Implant Method's advantages and its expanding adoption as part of its business performance and current position.
Moved together

"Global Expansion Through Packaging of the Implant Construction Method" moved the same way as this thread, in the same document, in 30 of its 43 moves.

302323211514★123456
  1. ★This thread
  2. 1Global Expansion Through Packaging of the Implant Construction Method30×
  3. 2Expansion of the Press-Fit Market Through Broader Applications and Coverage Areas23×
  4. 3Development and Adoption of Implant-Type Seawalls in Coastal Areas23×
  5. 4Development of Equipment and Construction Methods for Diverse Construction Conditions, Pile Materials and Large-Diameter Piles21×
  6. 5Increase in Capital and Capital Reserve Through Exercise of Stock Acquisition Rights15×
  7. 6GRB System Standardization and Package Rollout with Silent Piling Machines14×

★ is this thread; numbers match the list above. The number on a line is how many documents both moved the same way in; lines between the other threads count the documents they moved together in too. Threads that move together often sit closer.

When this could move next
Giken's next results are scheduled for 2026-10-09. Read the earnings preview It last moved in the Other Disclosures of 2026-10-09: "Advanced".
Recognition of the advantages of the implant construction method and its expanding adoption in various regions | GIKEN LTD. (6289) | Komori