On-Site PPA Service Using Self-Consumption Solar Power Generation
First written in FY2021-Q3. 18 of 24 entries say "Advanced", first in FY2022-Q1. Latest entry: FY2026.
7 other companies' latest entry also says "Advanced".
- FY2026AdvancedAnnual report
「As of the end of the consolidated fiscal year, we were providing electricity supply services using an on-site PPA model based on self-consumption solar power generation systems to 60 customers, with total generation capacity of approximately 70.0 MW.」
The number of on-site PPA customers increased from 51 and approximately 57.8 MW to 60 and approximately 70.0 MW. - FY2026-H1AdvancedAnnual report
「During the interim consolidated accounting period, in addition to acquiring all of the anonymous partnership equity interests in a silent partnership whose operator is 合同会社福岡みやこソーラーパワー, which operates the Fukuoka Miyako Mega Solar Power Plant (location: Miyako Town, Kyoto District, Fukuoka Prefecture; generation capacity: approximately 67.0 MW), and making it a consolidated subsidiary in the previous consolidated fiscal year, and commencing commercial operation of the Saga Imari Biomass Power Plant (location: Imari City, Saga Prefecture; generation capacity: 46.0 MW), electricity supply services under the on-site PPA model increased by approximately 19.9 MW year on year, to 17 customers,」
The number of on-site PPA customers increased from 37 and 42.9 MW at the end of the same period of the previous year to 54 and 62.8 MW. The filing disclosed a year-on-year increase of 17 customers and approximately 19.9 MW in supply services. - FY2025AdvancedAnnual report
「As of the end of the consolidated fiscal year, we provided electricity-supply services under an on-site PPA model using behind-the-meter solar-power generation systems to 51 supply sites, with total generation capacity of approximately 57.8 MW.」
On-site PPA supply sites increased from 29, totaling approximately 35.2 MW, at the end of the previous consolidated fiscal year to 51, totaling approximately 57.8 MW. - FY2025-H1AdvancedAnnual report
「As 8 new electricity supply services, with approximately 7.7 MW of capacity, were launched under the on-site PPA model during the interim consolidated accounting period, the figures were as shown in the table below.」
During the interim consolidated accounting period, 8 new on-site PPAs totaling approximately 7.7 MW were launched, bringing the total to 37 customers and approximately 42.9 MW. - FY2024AdvancedAnnual report
「As of 30 June 2024, our group was providing electricity supply services to 29 customers, with total generation capacity of approximately 35.2 MW.」
The number of on-site PPA customers expanded to 29, with approximately 35.2 MW of capacity. The filing also states that the company plans to use the benefits of outage power supply and no upfront investment to lead to further energy-saving proposals for customers. - FY2024-Q3AdvancedAnnual report
「In addition, without using either the FIT or FIP scheme, we newly launched electricity supply services under an on-site PPA model as follows.」
During the nine-month cumulative period, 6 on-site PPA services were launched, and the filing disclosed the start of new supply totaling 11.0 MW to customers including DMG MORI and THK, as well as Nanchiku. - FY2023AdvancedAnnual report
「As of the end of the consolidated fiscal year, we were providing electricity supply services using an on-site PPA model (Note 15) based on self-consumption solar power generation systems capable of supplying the required power even during power outages to 16 customers, with total generation capacity of approximately 18.5 MW.」
The number of on-site PPA services expanded to 16, with approximately 18.5 MW of capacity, and 8 new services were launched during the consolidated fiscal year. - FY2023-Q3AdvancedAnnual report
「In addition, we have newly launched 7 electricity supply services under an on-site PPA model without using the FIT scheme.」
During the nine-month cumulative period, 7 new electricity supply services were launched through on-site PPAs without using the FIT scheme. - FY2023-Q2RestatedAnnual report
「In addition, no new electricity supply services have been launched under an on-site PPA model without using the FIT scheme.」
No new on-site PPA electricity supply services were launched during the six months ended [the second quarter]. - FY2023-Q1RestatedAnnual report
「In addition, no new electricity supply services have been launched under an on-site PPA model without using the FIT scheme.」
The filing states that no new on-site PPA electricity supply services were launched during the quarter. - FY2022-Q3RestatedAnnual report
「We have launched 4 electricity supply services using an on-site PPA model based on self-consumption solar power generation systems capable of supplying the required power even during power outages, without using the FIT scheme.」
The filing states that 4 services supplying power during outages were launched during the cumulative period. - FY2022-Q2RestatedAnnual report
「The company began providing electricity supply services at 1 site using an on-site PPA model based on a self-consumption solar power system capable of supplying the necessary electricity even during power outages, without using the FIT scheme.」
The company continues to provide on-site PPA services using self-consumption solar power systems equipped to supply electricity during power outages. The cumulative total for on-site PPAs is stated as 4 sites and approximately 3.5 MW. - FY2022-Q1AdvancedAnnual report
「The company began providing electricity supply services at 1 site using an on-site PPA model based on a self-consumption solar power system capable of supplying the necessary electricity even during power outages, without using the FIT scheme.」
The company newly began providing electricity supply services through an on-site PPA at 1 site, bringing the cumulative total to 4 sites and approximately 3.5 MW. - FY2021RestatedAnnual report
「During the current fiscal year, the Group began providing electricity supply services to 3 customers using an on-site PPA model based on self-consumption solar power plants equipped to supply the necessary electricity even during power outages.」
The annual report also confirms that on-site PPAs equipped to supply electricity during power outages began at 3 sites. - FY2021-Q3First statedAnnual report
「Beginning in March 2021, we launched electricity-supply services for 3 customers using an on-site PPA model based on behind-the-meter solar-power generation systems capable of supplying the necessary electricity even during power outages, and recorded the related revenue.」