Research and development into the stable procurement and low-cost mass production of biomass fuel

First written in FY2021. 12 of 22 entries say "Advanced", first in FY2022-Q2. Latest entry: FY2026.

22entries
6years
10from disclosures
Share on X
How it moved
ProgressHeldSoftenedWorseRestatedFY2022-Q3 – FY2023-Q2ReframedFY2024-Q2 – FY2024-Q3AdvancedFY2025 – FY20262021: 120212022: 320222023: 420232024: 220242025: 120252026: 112026
Same theme, other companies
Stable Procurement and Commercialization of EFB FuelA theme 1 companies write about · 0 as a headwind · 1 as a tailwind

No other company in this theme has enough history to compare yet.

Full recordFilings, disclosures and news, newest first
  1. FY2026AdvancedAnnual report

    「In July 2026, a plant demonstrating EFB pellet manufacturing was completed in the Seima-kei Industrial Park in North Sumatra, Indonesia, and we will pursue large-scale commercialisation through the demonstration.」

    The EFB pellet demonstration plant was completed in July 2026, marking a transition from research and development to the next stage of pursuing large-scale commercialization through demonstration production.
  2. FY2025AdvancedAnnual report

    「In February 2025, we began construction of an EFB pellet manufacturing plant in North Sumatra, Indonesia, as a new operating base. Going forward, we will relocate our base to North Sumatra, Indonesia, advance production and sales at the plant, and continue research and development toward mass production.」

    The company began construction of a manufacturing plant in North Sumatra toward the commercial production of EFB fuel and moved into the phase of advancing production, sales and research and development at the site.
  3. FY2024-Q3ReframedAnnual report

    「Going forward, we plan to establish a new base on the Indonesian island of Java and continue our R&D. R&D in Batam, Indonesia, will be scaled back and continued for the time being.」

    The plan to end R&D in Batam in March 2024 was changed to a plan to scale it back and continue it for the time being, while also establishing a new base on Java.
  4. FY2024-Q2ReframedAnnual report

    「The Group is conducting R&D on production in Batam, Indonesia, with the aim of commercialising biomass fuel made from palm. Going forward, it plans to establish a new base on the Indonesian island of Java and continue its R&D. R&D in Batam is scheduled to end in March 2024.」

    The plan for R&D aimed at commercialising palm-derived biomass fuel was changed to end research in Batam in March 2024, establish a new base on Java and continue the research there.
  5. FY2024-Q1RestatedAnnual report

    「We are considering operating the project with a view to reducing costs through the use of EFB fuel currently under development.」

    In addition to conventional PKS procurement, the company describes fuel-related initiatives aimed at reducing costs through the use of EFB fuel currently under development.
  6. FY2023RestatedAnnual report

    「The planned acquisition of the site for the biomass fuel manufacturing plant has been changed to a planned lease. The equipment specifications have been changed accordingly.」

    For the fuel manufacturing base in North Sumatra, Indonesia, the company continues to pursue the plan after changing from acquisition to leasing.
  7. FY2023-Q3ReframedAnnual report

    「The planned acquisition of the site for the biomass fuel manufacturing plant has been changed to a planned lease. The equipment specifications have been changed accordingly.」

    For the site of a biomass fuel manufacturing plant in North Sumatra, Indonesia, the plan was changed from acquisition to leasing, and the equipment specifications were also changed.
  8. FY2023-Q2RestatedAnnual report

    「There has been no change in the plan from the end of the previous consolidated fiscal year.」

    For the site of a biomass fuel manufacturing plant in North Sumatra, Indonesia, the company maintains a plan for planned investment of ¥197 million, commencement in December 2022 and completion in December 2026.
  9. FY2023-Q1RestatedAnnual report

    「There has been no change in the plan from the end of the previous consolidated fiscal year.」

    For the site of a biomass fuel manufacturing plant in North Sumatra, Indonesia, the company has not changed the plan for planned investment of ¥197 million, commencement in December 2022 and completion in December 2026.
  10. FY2022-Q3RestatedAnnual report

    「There has been no change in the plan from the end of the previous consolidated fiscal year.」

    For the site of a biomass fuel manufacturing plant in North Sumatra, Indonesia, the company states that there has been no change to the plan for an investment of ¥197 million, commencing in December 2022 and scheduled for completion in December 2026.
  11. FY2022-Q2AdvancedAnnual report

    「North Sumatra, Indonesia Site for biomass fuel manufacturing plant 197 0 Proceeds from the disposal of treasury shares December 2022 December 2026」

    For the site of a biomass fuel manufacturing plant in North Sumatra, Indonesia, the company states a planned investment of ¥197 million and an equipment plan scheduled to commence in December 2022 and be completed in December 2026.
  12. FY2021First statedAnnual report

    「The company is conducting R&D into the production of woody biomass fuel for low-cost, stable mass production.」

    Through its Indonesian subsidiary, the company is advancing R&D into biomass fuel production and securing stable sources of supply.
Moved together

"Expansion of Biomass Fuel Supply Volumes" moved the same way as this thread, in the same document, in 10 of its 22 moves.

1065555★123456
  1. ★This thread
  2. 1Expansion of Biomass Fuel Supply Volumes10×
  3. 2Ownership, Operation and Electricity Sales from Renewable Energy Power Plants6×
  4. 3Expansion of development, EPC and operations management for grid-scale battery storage facilities5×
  5. 4Conversion of FIT Solar Power to FIP and Co-Location of Battery Storage5×
  6. 5Expansion of EPC Business in Power Generation and Utility Facilities5×
  7. 6On-Site PPA Service Using Self-Consumption Solar Power Generation5×

★ is this thread; numbers match the list above. The number on a line is how many documents both moved the same way in; lines between the other threads count the documents they moved together in too. Threads that move together often sit closer.

When this could move next
No upcoming earnings preview for TESS Holdings yet. It last moved in the Other Disclosures of 2026-09-18: "Advanced".
News
No news is linked to this thread yet. When an article touches it, it will appear here by date.
Research and development into the stable procurement and low-cost mass production of biomass fuel | TESS Holdings Co.,Ltd. (5074) | Komori