Expansion of EPC Business in Power Generation and Utility Facilities
First written in FY2021-Q3. 22 of 26 entries say "Advanced", first in FY2021. Latest entry: FY2026.
8 other companies' latest entry also says "Advanced".
- FY2026AdvancedAnnual report
「Revenue increased year on year because EPC and other work for the Shizuoka Kikukawa battery storage facility and the grid-scale battery storage facility of a partnership formed by a company organised by Tokyo Century Corporation progressed steadily during the fiscal year.」
Grid-scale battery storage EPC projects expanded to include the Shizuoka Kikugawa Battery Storage Facility and projects related to Tokyo Century. Engineering segment revenue was ¥22,197 million, orders received were ¥42,625 million, and the order backlog was ¥43,304 million. - FY2026-H1Increase in battery storage projectsAnnual report
「EPC for renewable-energy facilities progressed steadily, driven by an increase in battery-storage system projects.」
Reports an increase in battery-storage system projects within renewable-energy EPC. No new development-type EPC projects were undertaken during the interim consolidated accounting period, and no revenue was recorded. - FY2025SoftenedAnnual report
「As of the filing date, we have no new orders for high-quality solar-power development projects using the FIT scheme. Our group is working to expand EPC for battery-storage systems, behind-the-meter solar-power facilities and energy-conservation facilities.」
States that there are no new orders for high-quality FIT solar projects, while expanding EPC into battery-storage systems, behind-the-meter solar power and energy-conservation facilities. - FY2025-H1AdvancedAnnual report
「During the current interim consolidated accounting period, EPC projects involving energy-saving facilities such as cogeneration systems (*6), fuel-conversion facilities (*7) and utility facilities (*8) increased year on year amid growing demand for decarbonization, and EPC progress remained strong.」
The company reported an increase in EPC projects for energy-saving facilities and strong progress. Engineering segment revenue was ¥7,607 million, up 35.1% year on year, while the number of EPC projects for renewable energy facilities declined. - FY2024AdvancedAnnual report
「Of these EPC projects, construction of 2 EPC projects for cogeneration systems and captive power generation facilities (total generation capacity of approximately 6.0 MW), 2 utility facility EPC projects, and 27 EPC projects for industrial solar power generation systems (total generation capacity of approximately 42.0 MW) was completed during the current consolidated fiscal year.」
For the full year, the company disclosed completed EPC projects for cogeneration and captive power generation, utilities and industrial solar power, including the number of projects and capacity. Engineering segment orders received were ¥21,117 million, and the order backlog was ¥17,025 million. - FY2024-Q3AdvancedAnnual report
「Of these EPC projects, construction of 2 EPC projects for cogeneration systems and captive power generation facilities (total generation capacity of approximately 6.0 MW), 23 EPC projects for industrial solar power generation systems (total generation capacity of approximately 30.5 MW), and 1 utility facility EPC project was completed during the third quarter of the current cumulative consolidated period.」
The company disclosed the completion during the first 3 quarters of 2 cogeneration and captive power generation facility EPC projects totaling approximately 6.0 MW, 23 industrial solar EPC projects totaling approximately 30.5 MW, and 1 utility facility EPC project. - FY2024-Q2AdvancedAnnual report
「Of these EPC projects, construction of 9 EPC projects for industrial solar power generation systems in Japan (total generation capacity of approximately 11.9 MW) and 1 utility facility EPC project was completed during the second quarter of the current cumulative consolidated period.」
The company disclosed the completion of 9 industrial solar power generation system EPC projects totaling approximately 11.9 MW and 1 utility facility EPC project during the second quarter of the current cumulative consolidated period. - FY2024-Q1AdvancedAnnual report
「Of these EPC projects, construction of 6 EPC projects for industrial solar power generation systems in Japan (total generation capacity of approximately 10.2 MW) was completed during the first quarter of the current cumulative consolidated period.」
The company disclosed the completion of 6 industrial solar power generation system EPC projects totaling approximately 10.2 MW during the first quarter. - FY2023AdvancedAnnual report
「Of these EPC projects, construction of 2 cogeneration system EPC projects (total generation capacity of approximately 9.6 MW), 2 EPC projects for fuel-conversion facilities such as LPG satellite facilities and LNG vaporizers, 4 EPC projects for utility facilities such as boilers and substations, 1 EPC project for an energy management system, and 19 EPC projects for industrial solar power generation systems in Japan (total generation capacity of approximately 26.8 MW) was completed during the current consolidated fiscal year.」
The company disclosed completed EPC projects for cogeneration, fuel conversion, utilities, energy management and industrial solar power for the full year, including the number of projects and capacity. - FY2023-Q3AdvancedAnnual report
「Of these EPC projects, construction of 2 cogeneration system EPC projects (total generation capacity of approximately 9.6 MW), 2 EPC projects for fuel-conversion facilities such as LPG satellite facilities and LNG vaporizers, 3 EPC projects for utility facilities such as boilers and substations, 1 EPC project for an energy management system, and 16 EPC projects for industrial solar power generation systems in Japan (total generation capacity of approximately 24.4 MW) was completed during the third quarter of the current cumulative consolidated period.」
The company disclosed completed EPC projects for cogeneration, fuel conversion, utilities, energy management and industrial solar power during the first 3 quarters, including the number of projects and capacity. - FY2023-Q2AdvancedAnnual report
「Of these EPC projects, construction of 2 cogeneration system EPC projects (total generation capacity of approximately 9.6 MW), 2 EPC projects for fuel-conversion facilities such as LPG satellite facilities and LNG vaporizers, 3 EPC projects for utility facilities such as boilers and substations, 1 EPC project for an energy management system, and 5 EPC projects for industrial solar power generation systems in Japan (total generation capacity of approximately 4.2 MW) was completed during the second quarter of the current cumulative consolidated period.」
The company disclosed completed EPC projects for cogeneration, fuel conversion, utilities, energy management and industrial solar power during the first half, including the number of projects and capacity. - FY2023-Q1AdvancedAnnual report
「Of these EPC projects, construction of 2 EPC projects for fuel-conversion facilities such as LPG satellite facilities and LNG vaporizers, 2 EPC projects for utility facilities such as boilers and substations, and 3 EPC projects for industrial solar power generation systems in Japan (total generation capacity of approximately 3.2 MW) was completed during the first quarter of the current cumulative consolidated period.」
The company disclosed the completion of 2 fuel-conversion facility EPC projects, 2 utility facility EPC projects, and 3 industrial solar EPC projects totaling approximately 3.2 MW. - FY2022-Q3AdvancedAnnual report
「Of these EPC projects, construction of 5 EPC projects for cogeneration systems and captive power generation facilities (generation capacity of approximately 13.7 MW), 1 EPC project for fuel-conversion facilities including LNG satellite facilities, 2 EPC projects related to customer utility facilities, and 9 EPC projects for industrial solar power generation systems in Japan (total generation capacity of approximately 14.3 MW) was completed during the third quarter of the current cumulative consolidated period.」
The company disclosed completed EPC projects for cogeneration and captive power generation, LNG fuel conversion, utilities and industrial solar power during the first 3 quarters, including the number of projects and capacity. - FY2022-Q2AdvancedAnnual report
「Of these EPC projects, construction of 1 cogeneration system EPC project (generation capacity of approximately 9.8 MW), 1 EPC project related to the renewal of an existing customer utility facility, and 7 EPC projects for industrial solar power generation systems in Japan (total generation capacity of approximately 13.7 MW) was completed during the second quarter of the current cumulative consolidated period.」
Construction of 1 cogeneration EPC project of approximately 9.8 MW, 1 existing utility facility renewal EPC project, and 7 industrial solar EPC projects totaling approximately 13.7 MW was completed during the first half. - FY2022-Q1AdvancedAnnual report
「Of these EPC projects, construction of 1 EPC project related to the renewal of an existing customer utility facility and 5 EPC projects for industrial solar power generation systems in Japan (total generation capacity of approximately 7.9 MW) was completed during the first quarter of the current cumulative consolidated period.」
Construction of 1 existing utility facility EPC project and 5 industrial solar EPC projects, totaling approximately 7.9 MW, was completed during the quarter. - FY2021AdvancedAnnual report
「Revenue was recognized from 11 EPC projects for cogeneration systems and captive power generation facilities (total generation capacity of approximately 19.2 MW), 2 EPC projects for fuel-conversion facilities including LNG satellite facilities, 4 EPC projects related to the renewal of customers’ existing utility facilities such as air-conditioning systems, boilers and substations, 10 EPC projects for industrial solar power generation systems in Japan (total generation capacity of approximately 11.1 MW), and 1 EPC project for a biomass power generation system (generation capacity of approximately 1.0 MW).」
The disclosure gives the number and capacity of projects, including biomass power generation system EPC projects, in addition to the company’s conventional power generation and utility EPC projects. - FY2021-Q3First statedAnnual report
「We recorded revenue from 9 EPC projects for cogeneration systems and private power-generation facilities, with total generation capacity of approximately 17.6 MW; 1 EPC project for fuel-switching facilities, including LNG satellite facilities; 3 EPC projects involving the replacement of customers’ existing utility facilities, including air-conditioning systems, boilers and substations; and 7 EPC projects for industrial solar-power systems in Japan, with total generation capacity of approximately 6.3 MW.」
Discloses the number of EPC projects and capacity for several types of power-generation, fuel-switching and utility facilities.