Komori
TESS Holdings (5074) · InitiativeAdvanced

Conversion of FIT Solar Power to FIP and Co-Location of Battery Storage

First written in FY2024. 10 of 12 entries say "Advanced", first in FY2025. Latest entry: 2026-10-01.

12entries
3years
9from disclosures
Share on X
How it moved
ProgressHeldSoftenedWorseFirst statedFY2024AdvancedFY2025 – 2026-10-012024: 120242025: 120252026: 102026
Same theme, other companies
Conversion of FIT Solar Power to the FIP Scheme and Co-location of Battery StorageA theme 1 companies write about · 0 as a headwind · 1 as a tailwind

No other company in this theme has enough history to compare yet.

Full recordFilings, disclosures and news, newest first
  1. 2026-10-01AdvancedOther Disclosures

    「テス・エンジニアリング株式会社が、この度、太陽光発電事業を行う京セラTCLソーラー合同会社向けにFIP制度を活用した太陽光発電所に併設する「蓄電池」を納入いたしましたのでお知らせいたします。」

    FIT太陽光のFIP転換・蓄電池併設について、京セラTCLソーラー合同会社が運営する福岡・飯塚第一メガソーラー発電所へ容量約6.0MWhの蓄電池を納入し、2026年10月に運転を開始した。2030年の中期目標として累積施工容量150MWを掲げる取り組みの具体的な納入実績である。
  2. FY2026AdvancedAnnual report

    「Our FIP-converted renewable energy capacity (Note 2): 8.1MW 75MW 113MW」

    For the conversion of FIT solar power to FIP and the addition of battery storage, the company disclosed actual capacity of 8.1 MW for the fiscal year ending June 2026, with plans for 75 MW for the fiscal year ending June 2027 and 113 MW for the fiscal year ending June 2030.
  3. FY2025AdvancedAnnual report

    「Own renewable energy capacity converted to FIP (under construction) 8.3 MW (Actual) 0 MW 75 MW 113 MW」

    For the conversion of FIT solar power to FIP and the addition of battery storage, the company disclosed capacity under construction and actual capacity for the fiscal year ending June 2025 against plans through the fiscal year ending June 2030.
  4. FY2024First statedAnnual report

    「Conversion of FIT solar power to FIP, with co-located battery storage」

    The medium-term management plan identifies a business model that converts FIT solar power to the FIP scheme and adds battery storage as a priority business area. The company is targeting 75 MW of its own renewable energy capacity converted to FIP for the fiscal year ending June 2027 and 113 MW for the fiscal year ending June 2030.
Moved together

"Expansion of development, EPC and operations management for grid-scale battery storage facilities" moved the same way as this thread, in the same document, in 6 of its 12 moves.

665544★123456
  1. ★This thread
  2. 1Expansion of development, EPC and operations management for grid-scale battery storage facilities6×
  3. 2On-Site PPA Service Using Self-Consumption Solar Power Generation6×
  4. 3Ownership, Operation and Electricity Sales from Renewable Energy Power Plants5×
  5. 4Research and development into the stable procurement and low-cost mass production of biomass fuel5×
  6. 5Expansion of EPC Business in Power Generation and Utility Facilities4×
  7. 6Reallocating Personnel to Growth Fields and Strengthening Organizational and Leadership Capabilities4×

★ is this thread; numbers match the list above. The number on a line is how many documents both moved the same way in; lines between the other threads count the documents they moved together in too. Threads that move together often sit closer.

When this could move next
No upcoming earnings preview for TESS Holdings yet. It last moved in the Other Disclosures of 2026-10-01: "Advanced".
News
No news is linked to this thread yet. When an article touches it, it will appear here by date.
Conversion of FIT Solar Power to FIP and Co-Location of Battery Storage | TESS Holdings Co.,Ltd. (5074) | Komori