Komori
Tokyo Energy & Systems (1945) · InitiativeAdvanced

Maintenance and Repairs of Power Generation Facilities for a Stable Summer Electricity Supply

First written in FY2017-Q1. 16 of 33 entries say "Advanced", first in FY2018-Q1. Latest entry: 2026-08-06.

33entries
11years
2from disclosures
Share on X
How it moved
ProgressHeldSoftenedWorseRestatedFY2018-Q3 – FY2021-Q1AdvancedFY2022 – FY2024-Q3AdvancedFY2025 – 2026-08-062016: 220162017: 520172018: 420182019: 220192020: 420202021: 320212022: 320222023: 320232024: 220242025: 220252026: 32026
Same theme, other companies
Enhancing Power Plant Operations, Equipment Maintenance and Fuel ManagementA theme 5 companies write about · 0 as a headwind · 5 as a tailwind

1 other company's latest entry also says "Advanced".

Ridges = years it wrote progress, valleys = years it wrote worse. Most hopeful companies at the back. Drag to turn, scroll to zoom, right-drag to pan. On a phone, two fingers turn and pinch to zoom; one finger scrolls the page.
Full recordFilings, disclosures and news, newest first
  1. 2026-08-06AdvancedEarnings

    「In particular, in renewable energy-related markets, where commercialization of biomass power plants, grid-scale storage batteries and other projects is progressing through the use of long-term decarbonized power source auctions and other measures, as well as in the nuclear field, where safety upgrade work toward the restart of nuclear power plants is progressing across Japan, and the general industrial field, where capital investment for decarbonization and energy conservation remains firm, we are expanding our construction bases nationwide through 6 locally rooted branches and 3 regional offices, while also increasing the number of personnel stationed at customer facilities.」

    The company is expanding its order-taking and construction activities in nuclear power, general industry and renewable energy, while expanding construction bases and increasing on-site staffing at customer facilities.
  2. FY2026AdvancedAnnual report

    「Orders received in the fiscal year amounted to ¥106.593 billion, up 16.5% from the previous fiscal year, due to orders for safety-related work on nuclear facilities, electric furnace-related work at steel plants for decarbonization, replacement of aging waste treatment plants nationwide, electrical equipment work at public facilities, renewal work on publicly operated hydroelectric power facilities, O&M (operation and maintenance) and LTSA (long-term service agreement) work for biomass power plants, and on-site PPA facility and construction work in the solar field.」

    The range of orders expanded to include nuclear power, decarbonization, waste treatment plants, public facilities, hydroelectric power, biomass O&M and LTSA, and on-site PPAs, resulting in a 16.5% increase in orders received from the previous fiscal year.
  3. 2026-05-12AdvancedEarnings

    「In particular, we steadily increased orders in the nuclear power field, where safety upgrade work is progressing at nuclear power plants across Japan toward their restart, the general industrial field, where capital investment for decarbonization and energy conservation remains firm, and renewable energy-related markets, where commercialization is progressing through the use of long-term decarbonized power source auctions and PPAs (power purchase agreements), among others. As a result, the backlog of carried-over construction projects reached a record high.」

    Orders increased in the nuclear, general industrial and renewable energy fields, bringing the backlog of carried-over construction projects to a record high.
  4. FY2026-H1AdvancedAnnual report

    「Orders received in the six-month interim consolidated period amounted to ¥51.543 billion, up 36.3% year on year, due to orders for safety-related work on nuclear facilities, decommissioning-related work at Fukushima Daiichi Nuclear Power Station, new and expanded substation equipment construction, electric furnace-related work at steel plants for decarbonization, electrical equipment work at public facilities, on-site PPA facility work in the solar field, and renewal work on publicly operated hydroelectric power facilities.」

    The range of orders expanded to include nuclear power, decommissioning, substations, electric furnaces at steel plants, public facilities, on-site PPAs and publicly operated hydroelectric power, resulting in a 36.3% year-on-year increase in orders received.
  5. FY2025AdvancedAnnual report

    「Orders received in the fiscal year amounted to ¥91.466 billion, up 42.5% from the previous fiscal year, due to orders for factory equipment expansion and renewal, refinery maintenance and repair, air-conditioning and electrical work at public facilities, construction and renewal of waste treatment plants, renovation of publicly operated hydroelectric power facilities, new and expanded substation equipment construction driven by increased power demand from data centers, new decarbonization retrofit work at thermal power plants through synergies with the overseas subsidiary's parts manufacturing business, and preparations for restarting nuclear power plants.」

    In addition to maintenance and construction of conventional power plants, the range of orders expanded to include factories, refineries, public facilities, waste treatment plants, data centers, substations, thermal power decarbonization and preparations for restarting nuclear power plants, resulting in a 42.5% increase in orders received from the previous fiscal year.
  6. FY2025-H1Orders received increased, but revenue and profit decreasedAnnual report

    「Orders received in the six-month interim consolidated period amounted to ¥37.827 billion, up 36.1% year on year, due to orders for chemical plant expansion, refinery maintenance and repair, air-conditioning work at public facilities, on-site PPA facility work and BCP measures in the solar field, disaster recovery work following torrential rain, new decarbonization retrofit work at thermal power plants through synergies with the overseas subsidiary's parts manufacturing business, and preparations for restarting nuclear power plants. Meanwhile, revenue amounted to ¥30.541 billion, down 26.1% year on year, despite progress on solar power generation facility installation and new and expanded substation equipment construction, due to the completion of a cycle of safety-related work at nuclear power plants and construction work at thermal power plants, as well as the completion of work related to treated water at Fukushima Daiichi Nuclear Power Station.」

    Orders received increased 36.1% year on year, while revenue decreased 26.1% due to construction projects reaching completion or entering a lull.
  7. FY2024-Q3AdvancedAnnual report

    「Meanwhile, revenue amounted to ¥63.648 billion, up 11.3% year on year, due to progress on construction of biomass power plants, renovation work at hydroelectric power plants and decommissioning-related work at Fukushima Daiichi Nuclear Power Station, as well as electricity sales revenue from the Group's own biomass power plant, which began commercial operations in October 2022.」

    In power generation facility-related operations, progress was made on biomass construction, hydroelectric power plant renovation and decommissioning-related work at Fukushima Daiichi Nuclear Power Station, while electricity sales revenue from the Group's own biomass power plant also contributed, resulting in an 11.3% year-on-year increase in revenue.
  8. FY2024-Q2AdvancedAnnual report

    「Orders received in the six-month period ended 30 September amounted to ¥27.790 billion, up 9.6% year on year, due to orders for electrical equipment work at large public facilities, new substation construction, solar power and battery storage facility installation, and biomass fuel sales.」

    Orders received increased 9.6% year on year due to orders for large public facilities, substations, solar power and battery storage facilities, and biomass fuel sales.
  9. FY2024-Q1AdvancedAnnual report

    「Orders received in the three-month period ended 30 June amounted to ¥13.995 billion, up 27.9% year on year, due to orders for electrical equipment work at large public facilities, substation equipment work and safety-related work at nuclear power plants. Revenue amounted to ¥20.295 billion, up 6.8% year on year, due to progress on decommissioning-related work at Fukushima Daiichi Nuclear Power Station and maintenance and repair work on thermal power generation facilities, as well as electricity sales revenue from the Group's own biomass power plant, which began commercial operations in October last year.」

    Orders received increased 27.9% year on year due to orders for large public facilities, substations and nuclear safety measures, while revenue increased 6.8% due to Fukushima Daiichi Nuclear Power Station work, thermal power maintenance and repair, and electricity sales revenue from the biomass power plant.
  10. FY2023-Q3AdvancedAnnual report

    「Meanwhile, revenue amounted to ¥57.188 billion, up 15.3% year on year, due to progress on maintenance and repair work and large-scale construction work at thermal power plants, decommissioning-related work at Fukushima Daiichi Nuclear Power Station, and hydroelectric power plant and transmission and distribution facility construction.」

    Progress on thermal power maintenance and repair, large-scale construction, decommissioning at Fukushima Daiichi Nuclear Power Station, and hydroelectric and transmission and distribution facility construction resulted in a 15.3% year-on-year increase in revenue.
  11. FY2023-Q2AdvancedAnnual report

    「Meanwhile, revenue amounted to ¥37.771 billion, up 33.6% year on year, due to increases in maintenance and repair work on thermal power generation facilities, including work to restart idled thermal power plants to ensure stable electricity supply and demand, as well as progress on hydroelectric power plant and substation construction.」

    Thermal power generation facility work, including work to restart idled thermal power plants, and progress on hydroelectric power plant and substation construction contributed to the increase in revenue, which rose 33.6% year on year.
  12. FY2023-Q1AdvancedAnnual report

    「Meanwhile, revenue amounted to ¥18.994 billion, up 75.8% year on year, due to an increase in large-scale construction work, including maintenance and repair work on thermal power generation facilities and transferred construction work.」

    Large-scale construction work, including maintenance and repair work on thermal power generation facilities and transferred construction work, increased, resulting in a 75.8% year-on-year increase in revenue.
  13. FY2022AdvancedAnnual report

    「Orders received in the fiscal year amounted to ¥117.055 billion, compared with ¥80.162 billion in the previous fiscal year, due to increases in decommissioning-related work at Fukushima Daiichi Nuclear Power Station and long-term operation and maintenance contracts for biomass power plants, as well as the transfer of construction work for thermal power generation facilities from Hitachi Plant Construction, Co., Ltd. This marked a new record high.」

    Orders received reached a record ¥117.055 billion, driven by an increase in power generation facility-related work and the transfer of the thermal power business.
  14. FY2022-Q2RestatedAnnual report

    「Specifically, the Group sought to secure and expand orders for inspection and maintenance work at thermal, nuclear and hydroelectric power plants; decommissioning-related work at Fukushima Daiichi Nuclear Power Station and reconstruction-related work in Fukushima; safety-related work at nuclear power plants; and construction work for thermal power generation facilities」

    Work involving power plant inspection and maintenance, decommissioning, reconstruction, safety measures and thermal power generation facilities is continuing.
  15. FY2022-Q1Decrease in scheduled inspection work on thermal power generation facilitiesAnnual report

    「Revenue amounted to ¥10.804 billion, compared with ¥12.622 billion in the same period of the previous year, as construction work for thermal power generation facilities increased, but cogeneration facility construction and scheduled inspection work on thermal power generation facilities decreased year on year.」

    Construction work for thermal power generation facilities increased, while scheduled inspection work on thermal power generation facilities decreased from the same period of the previous year.
  16. FY2021AdvancedAnnual report

    「Orders received in the fiscal year amounted to ¥80.162 billion, up 25.2% from the previous fiscal year, due to increases in construction work for large-scale thermal power generation facilities and long-term operation and maintenance contracts for biomass power plants, despite extensions to solar power generation facility plans caused by natural disasters.」

    Orders received increased 25.2% from the previous fiscal year, driven by increases in construction work for large-scale thermal power generation facilities and long-term operation and maintenance contracts for biomass power plants.
  17. FY2021-Q2AdvancedAnnual report

    「Orders received in the six-month period ended 30 September amounted to ¥26.871 billion, up 0.2% year on year, as the increase in scheduled inspection work on thermal power generation facilities and safety-related work at nuclear power plants outweighed decreases in cogeneration facility construction, thermal power generation facility construction and solar power generation facility construction.」

    Orders received overall increased 0.2% year on year, driven by an increase in scheduled inspection work on thermal power generation facilities.
  18. FY2021-Q1RestatedAnnual report

    「Against this backdrop, the Group sought to expand orders and sales and made every effort to generate profits through inspection and maintenance of thermal, nuclear and hydroelectric power plants; decommissioning-related work at Fukushima Daiichi Nuclear Power Station and reconstruction-related work in Fukushima; safety-related work at nuclear power plants; and work involving large-scale thermal power generation facilities, cogeneration facilities, telecommunications facilities and large-scale solar power generation facilities.」

    Work involving power plant inspection and maintenance, decommissioning, safety measures, large-scale thermal power, cogeneration, telecommunications and solar power generation facilities is continuing.
  19. FY2020Full-year decrease in orders due to postponement of inspection and maintenance workAnnual report

    「Orders received amounted to ¥64.012 billion, down 13.1% from the previous fiscal year, despite increased participation in hydroelectric power plant redevelopment projects and an increase in orders for cogeneration facility work, due to a decrease in construction work for thermal power generation facilities, postponement of inspection and maintenance work, and extensions to solar power generation facility plans caused by major typhoons.」

    Full-year orders received decreased 13.1% from the previous fiscal year due to a decrease in construction work for thermal power generation facilities and the postponement of inspection and maintenance work.
  20. FY2020-Q3Decrease in orders due to postponement of inspection and maintenance workAnnual report

    「Orders received in the nine-month period ended 31 December amounted to ¥38.085 billion, down 26.7% year on year, due to a decrease in construction work for thermal power generation facilities and the postponement of inspection and maintenance work.」

    Orders received decreased 26.7% year on year due to a decrease in construction work for thermal power generation facilities and the postponement of inspection and maintenance work.
  21. FY2019RestatedAnnual report

    「Specifically, the Group sought to expand orders and sales and made every effort to generate profits through inspection and maintenance of thermal, nuclear and hydroelectric power plants; decommissioning-related work at Fukushima Daiichi Nuclear Power Station and reconstruction-related work in Fukushima; safety-related work at nuclear power plants; and work involving large-scale thermal power generation facilities, cogeneration facilities, telecommunications facilities and large-scale solar power generation facilities.」

    Work involving power plant inspection and maintenance, decommissioning, safety measures, large-scale thermal power, cogeneration, telecommunications and solar power generation facilities is continuing.
  22. FY2019-Q3RestatedAnnual report

    「Against this backdrop, the Group sought to expand its business and made every effort to generate profits through inspection and maintenance of thermal, nuclear and hydroelectric power plants, decommissioning-related work at Fukushima Daiichi Nuclear Power Station and reconstruction-related work in Fukushima, safety-related work at nuclear power plants, and work involving large-scale thermal power generation facilities, cogeneration facilities and large-scale solar power generation facilities.」

    The Group is continuing inspection and maintenance of power plants and pursuing expansion and profit generation in work involving decommissioning, safety measures, large-scale thermal power, cogeneration and solar power generation facilities.
  23. FY2019-Q2RestatedAnnual report

    「Specifically, the Group sought to expand its business and made every effort to generate profits through inspection and maintenance of thermal, nuclear and hydroelectric power plants, decommissioning-related work at Fukushima Daiichi Nuclear Power Station and reconstruction-related work in Fukushima, safety-related work at nuclear power plants, and work involving large-scale thermal power generation facilities, cogeneration and large-scale solar power generation facilities.」

    While continuing inspection and maintenance of thermal, nuclear and hydroelectric power plants, the Group is expanding into large-scale thermal power generation facilities, cogeneration and large-scale solar power generation facilities.
  24. FY2019-Q1RestatedAnnual report

    「Against this backdrop, the Group made every effort to secure and expand orders and sales and generate profits from inspection and maintenance work and repair work at thermal, nuclear and hydroelectric power plants; decommissioning-related work at Fukushima Daiichi Nuclear Power Station and reconstruction-related work in Fukushima; safety-related work at nuclear power plants; power generation facility-related work and cogeneration-related work at petrochemical plants; and installation work for large-scale solar power generation facilities.」

    Work related to power generation facilities, including inspection and repair of thermal, nuclear and hydroelectric power plants, is continuing.
  25. FY2018RestatedAnnual report

    「Against this backdrop, in its existing business areas, the Group is working to expand and transform its business by adding replacement of aging thermal power plants, safety-related work at nuclear power plants and decommissioning-related work at Fukushima Daiichi Nuclear Power Station to its conventional maintenance of power facilities, while pursuing new customers.」

    The policy is to continue maintaining conventional power facilities while pursuing replacement of aging thermal power plants, nuclear safety measures and decommissioning-related work at Fukushima Daiichi Nuclear Power Station.
  26. FY2018-Q3RestatedAnnual report

    「Against this backdrop, the Group made every effort to carry out inspection and maintenance work and repair work at thermal, nuclear and hydroelectric power plants; work related to the decommissioning of Fukushima Daiichi Nuclear Power Station and the reconstruction of Fukushima; safety-related work at nuclear power plants; power generation facility-related work and cogeneration-related work at petrochemical plants; and installation work for large-scale solar power generation facilities.」

    Work related to power generation facilities, including inspection and repair work at thermal, nuclear and hydroelectric power plants, is continuing.
  27. FY2018-Q2AdvancedAnnual report

    「Orders received increased by ¥9.132 billion year on year to ¥37.375 billion, as orders increased for decommissioning-related work at Fukushima Daiichi Nuclear Power Station in the Nuclear segment and inspection and maintenance work at thermal power plants in the Energy and Industrial segment.」

    Orders received in the plant engineering business increased by ¥9.132 billion year on year, including an increase in inspection and maintenance work at thermal power plants.
  28. FY2018-Q1AdvancedAnnual report

    「Orders received increased by ¥11.353 billion year on year to ¥22.850 billion, as orders increased for safety-related work at Kashiwazaki-Kariwa Nuclear Power Station in the Nuclear segment and inspection and maintenance work at thermal power plants in the Energy and Industrial segment.」

    Orders received in the plant engineering business increased by ¥11.353 billion year on year, driven by an increase in inspection and maintenance work at thermal power plants.
  29. FY2017RestatedAnnual report

    「Specifically, inspection and maintenance work and repair work at thermal, nuclear and hydroelectric power plants to ensure stable electricity supply, and equipment maintenance and inspection work on the contaminated-water treatment and circulating-cooling systems at Fukushima Daiichi Nuclear Power Station during decommissioning」

    Inspection and repair of thermal, nuclear and hydroelectric power plants, as well as equipment maintenance and inspection at Fukushima Daiichi Nuclear Power Station, are continuing to ensure stable electricity supply.
  30. FY2017-Q3RestatedAnnual report

    「Scheduled inspection and maintenance work and repair work at thermal, nuclear and hydroelectric power plants」

    Inspection and repair work on power generation facilities is continuing.
  31. FY2017-Q3RestatedAnnual report

    「Against this backdrop, the Group made every effort to carry out inspection and maintenance work and repair work at thermal, nuclear and hydroelectric power plants; work related to the contaminated-water treatment and circulating-cooling systems at Fukushima Daiichi Nuclear Power Station; safety-related work at Kashiwazaki-Kariwa Nuclear Power Station and Shika Nuclear Power Station; construction and renovation of substations; power generation facility-related work at petrochemical plants; and installation work for large-scale solar power generation facilities.」

    Maintenance and repair of power generation facilities, including inspection and repair work at thermal, nuclear and hydroelectric power plants, is continuing.
  32. FY2017-Q2RestatedAnnual report

    「Specifically, the Group made every effort to carry out scheduled inspection and maintenance work and various repair work at thermal, nuclear and hydroelectric power plants; work related to the contaminated-water treatment and circulating-cooling systems at Fukushima Daiichi Nuclear Power Station; safety-related work at Kashiwazaki-Kariwa Nuclear Power Station and Shika Nuclear Power Station; construction and renovation of substations; power generation facility-related work at chemical plants; and installation work for large-scale solar power generation facilities.」

    Scheduled inspections and repairs at thermal, nuclear and hydroelectric power plants continue.
  33. FY2017-Q1First statedAnnual report

    「In the first quarter, the Group made every effort to carry out various maintenance inspections and repair work on power generation facilities to ensure stable electricity supply in summer, decommissioning-related and safety-related work at nuclear power plants, and work related to renewable energy. Specifically, this included scheduled inspection and maintenance work and various repair work at thermal, nuclear and hydroelectric power plants」

    Scheduled inspections and repair work are being carried out at thermal, nuclear and hydroelectric power plants to ensure stable supply during summer.
Moved together

"Decommissioning and safety-related work at nuclear power plants" moved the same way as this thread, in the same document, in 13 of its 32 moves.

131211977★123456
  1. ★This thread
  2. 1Decommissioning and safety-related work at nuclear power plants13×
  3. 2Expansion of Renewable Energy-Related Construction12×
  4. 3Facilities Construction Segment’s Fall from Profit to Loss11×
  5. 4Construction of New and Renovated Substations9×
  6. 5Rigorous Cost Management and Reduction of Various Expenses7×
  7. 6Providing high-value-added services through consultative sales and a one-stop approach7×

★ is this thread; numbers match the list above. The number on a line is how many documents both moved the same way in; lines between the other threads count the documents they moved together in too. Threads that move together often sit closer.

When this could move next
No upcoming earnings preview for Tokyo Energy & Systems yet. It last moved in the Earnings of 2026-08-06: "Advanced".
News
No news is linked to this thread yet. When an article touches it, it will appear here by date.
Maintenance and Repairs of Power Generation Facilities for a Stable Summer Electricity Supply | TOKYO ENERGY & SYSTEMS INC. (1945) | Komori