Damages Claims and Reduced Order Opportunities Resulting from Accidents and Industrial Accidents

First written in FY2016. 6 of 11 entries say "Materialised", first in FY2023-Q1. Latest entry: FY2026.

11entries
11years
4from disclosures
Share on X
How it moved
ProgressHeldSoftenedWorseRestatedFY2016 – FY2019MaterialisedFY2023-Q1 – FY20262016: 120162017: 120172018: 020182019: 120192020: 020202021: 120212022: 220222023: 020232024: 020242025: 020252026: 52026
Same theme, other companies
Risk of Loss of Customer Confidence and Orders Due to Construction AccidentsA theme 25 companies write about · 27 as a headwind · 0 as a tailwind

Toa moved to the "Worse" side of this theme in 2022.

The whole theme swung hardest in 2025: 2 of 9 companies on the "Worse" side.

1 other company's latest entry also says "Materialised".

Ridges = years it wrote progress, valleys = years it wrote worse. Most hopeful companies at the back. Drag to turn, scroll to zoom, right-drag to pan. On a phone, two fingers turn and pinch to zoom; one finger scrolls the page.
Showing 14 of the 25 companies compared. The sentences above are computed from all 25.
Full recordFilings, disclosures and news, newest first
  1. FY2026MaterialisedAnnual report

    「On 7 April 2026, a serious accident occurred at the “Demolition Work for Public Use of Raw Material A and B Berths in the Ogishima Leading Area,” which the Company is currently constructing.」

    提出日までに重大事故が実際に発生し、事故対応および工事再開に要する外注費等について工事損失引当金繰入額を計上した。関係者との協議の進捗等により、翌年度以降に見積りを見直す可能性も記載している。
  2. FY2023-Q1MaterialisedAnnual report

    「2022年7月11日に当社施工中の建築工事(北海道恵庭市)において、コンクリート打設中の2階の床が崩落する事故が発生いたしました。 復旧費用等の発生が見込まれますが、発生原因を含めて現在調査中であり、合理的に見積ることは困難な状況であります。」

    提出日までに、北海道恵庭市の施工中建築工事で2階床が崩落する事故が実際に発生した。復旧費用等が見込まれるが、原因調査中で合理的な見積りは困難としている。
  3. FY2022RestatedAnnual report

    「当社グループは、安全衛生管理計画書の周知・徹底及び安全教育、安全パトロールの強化により、事故や労働災害の防止に努めております。」

    安全衛生管理計画書、安全教育、安全パトロールによる事故・労働災害防止策を再確認している。
  4. FY2021MitigatedAnnual report

    「当社グループは、安全衛生管理計画書の周知・徹底及び安全教育、安全パトロールの強化により、事故や労働災害の防止に努めております。」

    事故・労働災害リスクに対し、安全衛生管理計画書、安全教育、安全パトロールの強化を対応策として明示している。
  5. FY2019RestatedAnnual report

    「Although we take every possible measure to prevent accidents during construction, accidents or industrial accidents may occur due to unforeseen factors. In such cases, the Group’s performance may be affected by damages claims, suspension of bidding eligibility and other factors that reduce order opportunities.」

    事故・労働災害の発生から損害賠償、指名停止、受注機会減少に至るリスクを再掲している。
  6. FY2017RestatedAnnual report

    「Although we take every possible measure to prevent accidents during construction, accidents or industrial accidents may occur due to unforeseen factors. In such cases, the Group’s performance may be affected by damages claims, suspension of bidding eligibility and other factors that reduce order opportunities.」

    事故・労働災害から損害賠償、指名停止、受注機会減少に至る影響経路を再掲している。
  7. FY2016First statedAnnual report

    「Although we take every possible measure to prevent accidents during construction, accidents or industrial accidents may occur due to unforeseen factors. In such cases, the Group’s performance may be affected by damages claims, suspension of bidding eligibility and other factors that reduce order opportunities.」

    The Company describes the potential chain from accidents and industrial accidents to damages claims, suspension of bidding eligibility and fewer order opportunities.
Moved together

"Declines in the Fair Value of Owned Real Estate and Securities and Impairment Losses" moved the same way as this thread, in the same document, in 4 of its 11 moves.

433222★123456
  1. ★This thread
  2. 1Declines in the Fair Value of Owned Real Estate and Securities and Impairment Losses4×
  3. 2Creating a Sustainable Society and Future through the TOA2030 Long-Term Vision3×
  4. 3Risk of Fluctuations in Revenue from Completed Construction Due to Uncertainty in Estimating Total Project Costs3×
  5. 4Maintaining Business Scale, Improving Profitability and Customer Focus2×
  6. 5Deteriorating Project Profitability Due to Rising Construction Material Prices and Labor Shortages2×
  7. 6Assessing the Rationality of Cross-Shareholdings Based on the Cost of Capital2×

★ is this thread; numbers match the list above. The number on a line is how many documents both moved the same way in; lines between the other threads count the documents they moved together in too. Threads that move together often sit closer.

When this could move next
No upcoming earnings preview for Toa yet. It last moved in the General Meetings of Shareholders of 2026-05-28: "Materialised".
News
No news is linked to this thread yet. When an article touches it, it will appear here by date.