Mastery and Advancement of CFT Construction Technology
First written in FY2024. 2 of 3 entries say "Advanced", first in FY2025. Latest entry: FY2026.
2 other companies' latest entry also says "Advanced".
- FY2026AdvancedAnnual report
「For the fiscal year ending March 2026, we worked on developing a seismic control component, a buckling-restrained brace, using a folding mechanism, evaluated its fatigue characteristics through performance verification tests and obtained a technical performance certificate from 日本ERI株式会社.」
For the seismic control component, conducted performance verification tests and progressed through to obtaining a technical performance certificate. - FY2025AdvancedAnnual report
「We have also obtained the construction technology rank established by the New Urban Housing Association.」
For CFT structures, in addition to acquiring quality control methods through various tests and full-scale construction experiments, obtained a construction technology rank. - FY2024First statedAnnual report
「While conducting various tests and full-scale construction experiments under the guidance of the New Urban Housing Association, we are studying and acquiring methods for controlling concrete quality and managing and verifying concrete injection and filling conditions, with the aim of obtaining the construction technology rank established by the association.」
For concrete-filled tube structures, progressing with various tests, full-scale construction experiments and acquisition of a construction technology rank.