ONE-WAYOngoing theme · still written in the latest filings
Improving Construction Productivity Through Structural Construction Methods, BIM, and Prefabrication
An ongoing effort to shorten construction periods, reduce labor requirements, and improve quality and performance by using construction technologies such as concrete-filled tube (CFT) and composite structures, BIM, steel formwork, and prefabricated concrete (PCa) units.
Companies9How many companies write about this.
Threads12One company can carry more than one thread here.
PeriodFY2016 →Still being written about.
Directionhelps12 helps · 0 hurts · 0 flat