Komori
Besterra (1433) · InitiativeReframedLatest Earnings presentation (2026-03-12): "Advanced"

Visualization of Equipment Information and Processes Using Perfect 3D and 3D Dismantling

First written in FY2017. 5 of 9 entries say "Advanced", first in FY2018. Latest entry: 2026-03-12.

9entries
10years
2from disclosures
Share on X
How it moved
ProgressHeldSoftenedWorseAdvancedFY2018 – FY2021-Q1RestatedFY20212017: 120172018: 120182019: 120192020: 220202021: 120212022: 020222023: 020232024: 020242025: 120252026: 2
Same theme, other companies
3D Plant Dismantling Services for Visualizing Equipment and Work ProcessesA theme 1 companies write about · 0 as a headwind · 1 as a tailwind

No other company in this theme has enough history to compare yet.

Full recordFilings, disclosures and news, newest first
  1. FY2026-H1ReframedAnnual report

    「The company’s intention to concentrate its business resources on its core plant-dismantling market aligned with 水道機工’s need to secure design personnel. The company therefore determined that transferring the businesses of ヒロエンジ and 3DV would contribute to business expansion by both 水道機工 and the company, and entered into a memorandum of basic agreement for the transfer of all shares.」

    The company also entered into a memorandum of basic agreement to transfer all shares of 3Dビジュアル株式会社, which operates the 3D scanning and modeling business and other related businesses. Its strategy has been reorganized from expanding peripheral 3D businesses to focusing on its core plant-dismantling business.
  2. FY2021RestatedAnnual report

    「By converting paper records from the time of construction, more than 30 years ago, into state-of-the-art 3D data, we will provide dismantling work with visualized processes.」

    The company continues to pursue a policy of providing 3D dismantling services through preliminary surveys and process visualization using 3D data.
  3. FY2021-Q1AdvancedAnnual report

    「During the cumulative first quarter, the company acquired the 3D scanning and modeling business from 株式会社インターアクション through a business transfer by its newly established subsidiary, 3Dビジュアル株式会社, and began full-scale business operations.」

    The 3D business has made concrete progress, with the newly established subsidiary acquiring the 3D scanning and modeling business and beginning full-scale operations.
  4. FY2020AdvancedAnnual report

    「To strengthen preliminary surveys and other activities in the plant-dismantling business, we launched a 3D measurement service in January 2015 using 3D CAD software compatible with BIM (Building Information Modeling), and strengthened the business by establishing 3Dビジュアル株式会社 as a new subsidiary in December 2019.」

    The measures to strengthen the 3D measurement service have progressed through the establishment of 3Dビジュアル株式会社 as a new subsidiary in December 2019 and the strengthening of preliminary surveys and the 3D business using 3D CAD.
  5. FY2019AdvancedAnnual report

    「By introducing measurement technology and simulation systems of the highest standard, we will provide our distinctive 3D measurement services for dismantling work.」

    In the 3D business, the company is making its service offering more concrete by introducing measurement technologies and simulation systems for layout simulations, shape comparisons, walkthrough videos, BIM/CIM compatibility and 3D printing.
  6. FY2018AdvancedAnnual report

    「Enhancement of 3D dismantling simulations; improved estimate accuracy through advance 3D data measurement; introduction of remote support, displaying head-office data on PCs and tablets at dismantling sites and enabling remote support from 3D engineers」

    The initiative has progressed from the conventional concept of visualizing 3D information and work processes to concrete measures, including improving estimate accuracy through 3D dismantling simulations and introducing remote support at worksites.
  7. FY2017First statedAnnual report

    「We will provide comprehensive 3D information on plants, including point-cloud data, using aerial laser scanning, MMS (a mobile mapping system), terrestrial laser scanning, port-area sonar and other technologies. Using state-of-the-art 3D measurement equipment with this 3D information, we will provide the status of individual equipment through BIM data and other formats. We will also use systematized data to visualize work processes and provide “3D dismantling,” a visualized dismantling service that shows areas where heavy machinery may interfere and locations requiring environmental measures, while reducing communication errors through information sharing between worksites and headquarters.」

    The company is planning a service that combines multiple measurement technologies, point-cloud data, BIM data and process management to visualize equipment conditions, interference points, locations requiring environmental measures and worksite information.
Moved together

"Addressing the Shortage of Skilled Construction Workers Through Human Resources Services" moved the same way as this thread, in the same document, in 5 of its 9 moves.

554444★123456
  1. ★This thread
  2. 1Addressing the Shortage of Skilled Construction Workers Through Human Resources Services5×
  3. 2Proposal and Commercialization of Patented Construction Methods and Development of New Robots through Industry-Academic Collaboration5×
  4. 3Securing Profitability on Individual Projects and Controlling Selling, General and Administrative Expenses4×
  5. 4Securing Talent and Accelerating Readiness through a Five-Day Workweek and Training Programs4×
  6. 5Strengthening Sales Capabilities Through More Prime Contractor Projects and Expanded Sales Bases4×
  7. 6Expansion of Business Scale, Human Resources and Technology Platforms through M&A and Alliances4×

★ is this thread; numbers match the list above. The number on a line is how many documents both moved the same way in; lines between the other threads count the documents they moved together in too. Threads that move together often sit closer.

When this could move next
No upcoming earnings preview for Besterra yet. It last moved in the Earnings presentation of 2026-03-12: "Advanced".
News
No news is linked to this thread yet. When an article touches it, it will appear here by date.
Visualization of Equipment Information and Processes Using Perfect 3D and 3D Dismantling | BESTERRA CO.,LTD (1433) | Komori