Ef-On (9514) · RiskMaterialised

Risk to the stable operation of power-generation facilities

First written in FY2016. 16 of 30 entries say "Materialised", first in FY2017-Q1. Latest entry: FY2026.

30entries
11years
3from disclosures
Share on X
How it moved
ProgressHeldSoftenedWorseRestatedFY2017-Q2 – FY2018RestatedFY2019-Q3 – FY2020-Q2MaterialisedFY2021 – FY2023-Q1MaterialisedFY2025-H1 – FY20262016: 22017: 220172018: 320182019: 320192020: 220202021: 420212022: 420222023: 220232024: 220242025: 120252026: 52026
Same theme, other companies
Risk of Unplanned Outages Due to Failures or Damage to Power Generation FacilitiesA theme 5 companies write about · 5 as a headwind · 0 as a tailwind

Ef-On moved to the "Worse" side of this theme in 2020, 3 years before the typical company in this theme (2023).

1 other company's latest entry also says "Materialised".

Ridges = years it wrote progress, valleys = years it wrote worse. Most hopeful companies at the back. Drag to turn, scroll to zoom, right-drag to pan. On a phone, two fingers turn and pinch to zoom; one finger scrolls the page.
Full recordFilings, disclosures and news, newest first
  1. FY2026MaterialisedAnnual report

    「Although the エフオン日田 and エフオン壬生 Power Plants experienced outages in their grid interconnection lines due to lightning strikes, as well as unplanned outages for repairs to some auxiliary equipment,」

    Regarding the risk of stable operation of the power generation facilities, it states that transmission connection outages caused by lightning and unplanned outages due to auxiliary-equipment repairs actually occurred at Hita and Mibu power plants.
  2. FY2026-H1MaterialisedAnnual report

    「Apart from planned outages, unplanned outages occurred at Efon Hita Power Plant and Efon Mibu Power Plant due to lightning and repairs to certain auxiliary equipment.」

    Regarding the risk of stable operation of the power generation facilities, it states that unplanned outages actually occurred at Hita and Mibu power plants due to lightning and auxiliary-equipment repairs.
  3. FY2025-H1MaterialisedAnnual report

    「In the power generation business within the Green Energy Business, Efon Shingu Power Plant operated at reduced output due to insufficient fuel procurement and suspended operations for approximately 2 weeks in October for scheduled maintenance.」

    Regarding the risk of stable operation of the power generation facilities, output restrictions due to insufficient fuel procurement and an operating suspension of approximately 2 weeks actually occurred.
  4. FY2024-Q3MitigatedAnnual report

    「Except for scheduled voluntary inspections at EF-ON Shingu in January and EF-ON Mibu in March, operations progressed steadily without any major problems.」

    It states that the power generation business progressed without major equipment problems while periodic voluntary inspections were conducted.
  5. FY2024-Q2MitigatedAnnual report

    「In the power generation business within the Green Energy segment, there was no major trouble. The eF-On Shirakawa and eF-On Hita power plants carried out their annual inspections steadily as scheduled in November, while the other group power plants operated smoothly.」

    It states that no major problems occurred during the quarter, periodic inspections were carried out as scheduled, and the other power plants also operated smoothly.
  6. FY2024-Q1MaterialisedAnnual report

    「The eF-On Hita and eF-On Shingu power plants experienced transmission shutdowns caused by lightning strikes. In addition, the eF-On Shingu Power Plant experienced trouble with auxiliary boiler equipment, resulting in an unplanned shutdown of approximately 1 day.」

    Regarding the risk of stable operation of the power generation facilities, a transmission outage caused by lightning and an unplanned outage of approximately 1 day caused by a boiler auxiliary-equipment problem actually occurred.
  7. FY2023-Q2MitigatedAnnual report

    「In the group's power generation business, the eF-On Shirakawa and eF-On Hita power plants conducted periodic self-inspections in November, but operations otherwise proceeded steadily without any major trouble.」

    It states that Hita and Shirakawa underwent planned outages for periodic voluntary inspections, while operations remained solid without major problems during the rest of the period. Compared with the lightning and boiler auxiliary-equipment problems reported in the immediately preceding quarter, operating conditions improved during the period.
  8. FY2023-Q1MaterialisedAnnual report

    「The eF-On Hita and eF-On Mibu power plants experienced transmission shutdowns caused by lightning strikes. In addition, the eF-On Hita Power Plant experienced trouble with auxiliary boiler equipment, resulting in an unplanned shutdown of approximately 1.5 days.」

    It states that a transmission outage caused by lightning and an unplanned outage of approximately 1.5 days caused by a boiler auxiliary-equipment problem actually occurred.
  9. FY2022MaterialisedAnnual report

    「At Efon Hita Power Plant, poor circulation in the boiler silica-sand circulation system occurred in the first quarter, followed by a problem with the in-furnace steam piping in the second quarter, resulting in a substantial decrease in electricity transmitted over the year.」

    Regarding the risk of stable operation of the power generation facilities, multiple equipment problems occurred at Hita Power Plant, resulting in a substantial decrease in annual electricity transmission.
  10. FY2022-Q3MaterialisedAnnual report

    「An earthquake registering lower 6 on the Japanese seismic intensity scale, with its epicenter off the coast of Fukushima Prefecture, occurred on 16 March, causing an emergency shutdown at Efon Shirakawa Power Plant. There was no impact on the facilities, and operations were restored approximately 8 hours later.」

    Regarding the risk of stable operation of the power generation facilities, an emergency shutdown at Shirakawa Power Plant actually occurred due to an earthquake registering lower 6, and operations were restored approximately 8 hours later.
  11. FY2022-Q2MaterialisedAnnual report

    「An unplanned outage of approximately 4 days occurred due to a problem with the in-furnace steam piping at Efon Hita Power Plant.」

    Regarding the risk of stable operation of the power generation facilities, an unplanned outage of approximately 4 days actually occurred at Hita Power Plant due to a problem with the in-furnace steam piping.
  12. FY2022-Q1MaterialisedAnnual report

    「Although エフオン Hita temporarily experienced a decline in power transmission due to a problem with the silica sand circulation system inside the boiler」

    States that a problem with the silica sand circulation system inside the boiler occurred at Hita Power Plant, temporarily reducing the amount of power transmitted.
  13. FY2021MaterialisedAnnual report

    「In addition, エフオン Mibu experienced just under 1 week of unplanned downtime in the first quarter and approximately 4 days in the fourth quarter, but the overall impact on performance for the consolidated fiscal year was limited, and all power plants were able to maintain their planned operating levels.」

    States that new unplanned downtime actually occurred at Mibu Power Plant, including approximately 4 days in the fourth quarter, while all power plants maintained their planned operating levels.
  14. FY2021-Q3RestatedAnnual report

    「EF-ON Mibu conducted its first annual inspection and underwent a planned outage of approximately 2 weeks, while the other 3 power plants operated smoothly.」

    States that Mibu Power Plant underwent approximately 2 weeks of planned downtime for its first annual inspection, while the other 3 power plants operated smoothly.
  15. FY2021-Q2RestatedAnnual report

    「The eF-On Shirakawa and eF-On Hita power plants underwent their regular annual maintenance, resulting in shutdowns of approximately 2 weeks. Meanwhile, the eF-On Bungo-Ono and eF-On Mibu power plants maintained high operating rates smoothly.」

    States that although the relevant facility was shut down for approximately 2 weeks for scheduled maintenance, the maintenance was completed, and the other power plants continued to operate smoothly at high utilization rates.
  16. FY2021-Q1MaterialisedAnnual report

    「The Mibu Power Plant, which began operations in the second half of the previous fiscal year, experienced an unplanned outage lasting just under 1 week in September. However, its summer operations and fuel consumption proceeded smoothly and made a significant contribution to improved Group performance.」

    States that just under 1 week of unplanned downtime actually occurred at Mibu Power Plant in September.
  17. FY2020-Q2RestatedAnnual report

    「エフオン Shirakawa and エフオン Hita Power Plants underwent annual scheduled maintenance and were shut down for more than 2 weeks, but the work was completed without problems. During the rest of the period, all power plants continued to operate smoothly at high utilization rates.」

    States that scheduled maintenance at Shirakawa and Hita required shutdowns of more than 2 weeks but was completed without problems, while all power plants maintained high utilization rates during the rest of the period.
  18. FY2020-Q1RestatedAnnual report

    「During the first quarter of the current consolidated cumulative period, there were no occurrences of matters that could materially affect investors’ investment decisions among the matters relating to the business and financial position described in this quarterly report, nor were there any material changes to the “Business and Other Risks” described in the annual securities report for the previous fiscal year.」

    Concludes that there have been no material changes regarding the risk to stable operation of power generation equipment. The main text states that each power plant maintained an operating rate of nearly 100%.
  19. FY2019-Q3RestatedAnnual report

    「In October, the EF-ON Bungo-Ono power plant experienced an unplanned outage of 47 hours due to a failure of control-system equipment.」

    Continues to report the control-system equipment failure and 47 hours of unplanned downtime at Bungo-Ono Power Plant as actual operating results concerning the stable operation of power generation equipment.
  20. FY2019-Q2MaterialisedAnnual report

    「In October, the EF-ON Bungo-Ono power plant experienced an unplanned outage of 47 hours due to a failure of control-system equipment.」

    Regarding the risk to stable operation of power generation equipment, states that a control-system equipment failure and 47 hours of unplanned downtime actually occurred at Bungo-Ono Power Plant.
  21. FY2018RestatedAnnual report

    「However, if an unforeseen event occurs and the Group's facilities are damaged, the Group may be unable to generate the planned amount of electricity, potentially affecting its results.」

    Continues to disclose the risk to stable operation of woody biomass power generation equipment. Full-year results indicate that each power plant operated smoothly outside scheduled inspections.
  22. FY2018-Q3RestatedAnnual report

    「During the cumulative third quarter under review, there were no significant changes in the matters described in this quarterly report regarding the business and accounting conditions that could materially affect investors’ decisions, or in the “Business and Other Risks” described in the securities report for the previous fiscal year.」

    Concludes that there have been no material changes regarding the risk to stable operation of power generation equipment.
  23. FY2018-Q2RestatedAnnual report

    「At each power plant, the utilization rate of unused wood increased from the previous corresponding period, and the plants operated smoothly without problems, resulting in substantial increases in both revenue and operating profit.」

    States that the power plants operated smoothly without problems outside scheduled maintenance periods. No new equipment breakdowns were reported.
  24. FY2017-Q3RestatedAnnual report

    「Profit declined due in part to repair costs arising from minor breakdowns.」

    Continues to describe minor breakdowns at on-site captive power generation facilities and related repair costs. No new type of equipment breakdown has been indicated.
  25. FY2017-Q2RestatedAnnual report

    「Minor breakdowns at existing on-site captive power generation facilities resulted in repair costs and lower profit.」

    Minor equipment breakdowns and related repair costs continue to be reported, but no new type of equipment risk has been indicated since the previous quarter.
  26. FY2017-Q1MaterialisedAnnual report

    「Minor breakdowns at existing on-site captive power generation facilities resulted in repair costs and lower profit.」

    Minor breakdowns at on-site captive power generation facilities actually occurred, resulting in repair costs and lower segment profit.
  27. FY2016First statedAnnual report

    「However, if an unforeseen event occurs and the Group's facilities are damaged, the Group may be unable to generate the planned amount of electricity, potentially affecting its results.」

    Although the Company consults with manufacturers and maintenance providers and conducts maintenance and inspections, unforeseen damage remains a residual risk.
Moved together

"Advanced Operations, Equipment Maintenance and Fuel Management" moved the same way as this thread, in the same document, in 15 of its 30 moves.

151412999★123456
  1. ★This thread
  2. 1Advanced Operations, Equipment Maintenance and Fuel Management15×
  3. 2Substantial growth in consolidated revenue and earnings led by the power-generation business14×
  4. 3Risk of fluctuations in material and labor costs in maintenance cost estimates12×
  5. 4Response to Full Deregulation of Retail Electricity Sales and Electricity System Reform9×
  6. 5Revenue and operating profit growth in the green energy business9×
  7. 6Political instability in the United States and Europe and geopolitical risks in East Asia9×

★ is this thread; numbers match the list above. The number on a line is how many documents both moved the same way in; lines between the other threads count the documents they moved together in too. Threads that move together often sit closer.

When this could move next
No upcoming earnings preview for Ef-On yet. It last moved in the Earnings of 2026-08-12: "Materialised".