Expansion of Renewable Energy Deployment
First written in FY2016. 4 of 10 entries say "Raised", first in FY2022. Latest entry: FY2026.
0 other companies' latest entry also says "Raised".
- FY2026RaisedAnnual report
「For renewable energy power sources, the Company has set a target of increasing capacity by at least 3,000 MW by fiscal 2035, based on development scale.」
The target was expanded in both timeframe and development scale, from increasing capacity by at least 300 MW by fiscal 2030 to increasing it by at least 3,000 MW by fiscal 2035. - 2026-05-26RaisedGeneral Meetings of Shareholders
「For renewable energy power sources, we have set a target of increasing capacity by at least 3 million kW by FY2035, based on development scale.」
The company presented an expanded numerical target in terms of both timing and scale, replacing the previous target of newly developing at least 300,000 kW by 2030. - FY2026-H1AdvancedAnnual report
「Following its establishment on 10 September 2025, Ishikariwan Shinko Offshore Wind Power (GK) has been classified as an equity-method affiliate from the current interim consolidated accounting period.」
Ishikariwan Shinko Offshore Wind Power (GK) was established on 10 September 2025 and classified as an equity-method affiliate from the current interim period. The business structure for renewable energy development, including offshore wind power, has taken concrete shape. - FY2024RaisedAnnual report
「To expand the introduction of renewable energy power sources, we will first seek to achieve ahead of schedule the management vision target of increasing capacity by at least 300 MW by fiscal 2030, and will continue to build capacity aggressively thereafter.」
For the existing target of increasing capacity by at least 300 MW by fiscal 2030, the Company has expanded its policy to seek early achievement and make further additions after reaching the target. - FY2023RestatedAnnual report
「In fiscal 2023, we will conduct wind condition surveys throughout Hokkaido and consider commercialization of wind power projects, while pursuing development surveys jointly with other companies in Kyogoku Town for the expansion of geothermal power generation following the Mori Power Plant.」
The policy of expanding renewable energy remains in place, with specific measures including wind condition surveys and consideration of wind power commercialization in fiscal 2023, and geothermal development surveys in Kyogoku Town. - FY2022RaisedAnnual report
「In the Hokuden Group Management Vision 2030, the Hokuden Group has set a target of newly developing at least 300 MW of renewable energy power sources by 2030. It established a dedicated organization for renewable energy development in May 2022 and will accelerate initiatives to develop wind, geothermal and biomass power sources.」
The Company specified a numerical target of newly developing at least 300 MW of renewable energy by 2030 and the establishment of a dedicated organization. - FY2019AdvancedAnnual report
「With the Shimokawa biomass power plant scheduled to begin operations in May this year, we will actively develop renewable energy power generation businesses in Japan and overseas, while working to maximize the amount of renewable energy connected to the power grid and maintain power quality in Hokkaido.」
Specific progress is being made in renewable energy power generation and expansion of grid connection capacity, including the start of operations at the Shimokawa biomass power plant. - FY2018RestatedAnnual report
「Renewable energy accounted for approximately 25% of our electricity volume, including electricity received under the feed-in tariff scheme, in fiscal 2016. We will continue to install grid-side batteries, expand wind power generation through demonstration tests with TEPCO Power Grid, Inc. using interregional transmission lines, increase the output of hydropower plants, and participate in biomass power generation projects.」
Alongside the actual renewable energy ratio, the Company is continuing initiatives involving battery storage, wind power demonstrations, hydropower output expansion and participation in biomass projects. - FY2017RestatedAnnual report
「For renewable energy, a local resource, we will pursue various demonstration tests to achieve both greater utilization and the maintenance of power quality, while the Group as a whole will work on output expansion and new development, primarily in hydropower, which has a limited impact on the power grid.」
The policy of continuing demonstration tests for renewable energy and output expansion and new development centered on hydropower remains in place. - FY2016First statedAnnual report
「To further expand the introduction of renewable energy, a local resource, we will steadily pursue initiatives including the use of untapped hydropower energy, demonstration tests to expand wind power generation using the Hokkaido-Honshu interconnection facilities, a large-scale battery storage demonstration project, and research and development related to livestock biomass power generation.」
Multiple introduction and demonstration initiatives are cited, including hydropower, wind power, large-scale battery storage, livestock biomass and small-scale woody biomass.