Mtg (7806) · InitiativeAdvanced

Expansion of Headquarters Facilities and Workforce to Support Rapid Growth

First written in FY2018-Q3. 3 of 7 entries say "Advanced", first in FY2018. Latest entry: FY2025.

7entries
8years
0from disclosures
Share on X
How it moved
ProgressHeldSoftenedWorseAdvancedFY2018SoftenedFY2020RestatedFY2022SoftenedFY2023AdvancedFY2024 – FY20252018: 220182019: 020192020: 120202021: 020212022: 120222023: 120232024: 020242025: 22025
Same theme, other companies
Expansion investment in manufacturing, research and new headquarters facilitiesA theme 2 companies write about · 0 as a headwind · 2 as a tailwind

1 other company's latest entry also says "Advanced".

Ridges = years it wrote progress, valleys = years it wrote worse. Most hopeful companies at the back. Drag to turn, scroll to zoom, right-drag to pan. On a phone, two fingers turn and pinch to zoom; one finger scrolls the page.
Full recordFilings, disclosures and news, newest first
  1. FY2025AdvancedAnnual report

    「Construction of the new headquarters building began in March 2025, and completion is envisaged for January 2027. However, as the timing remains unconfirmed, it is undecided.」

    The previously undecided plan for a new headquarters building and R&D centre began construction in March 2025, with completion envisaged for January 2027. Meanwhile, total planned investment became undecided.
  2. FY2024AdvancedAnnual report

    「Headquarters (Atsuta-ku, Nagoya, Aichi Prefecture) / Each business / R&D centres for brands and products and headquarters / 22,594 / 11,894 / Internal funds / Borrowings / Scheduled for January 2027 / 14,905.74」

    The previously undecided plan for a new headquarters building and R&D centre was made more concrete, with total planned investment of ¥22,594 million, ¥11,894 million already paid, a total floor area of 14,905.74 m² and completion scheduled for January 2027.
  3. FY2023SoftenedAnnual report

    「Construction of the new headquarters building is envisaged to begin during the fiscal years ending September 2025 through September 2026, but the timing remains undecided.」

    The plans for a new headquarters building, R&D centre and creative lab remain in place, but the anticipated construction start period has been pushed back from the fiscal years ending September 2024 through September 2026 to the fiscal years ending September 2025 through September 2026, and the timing remains undecided.
  4. FY2022RestatedAnnual report

    「Construction of the new headquarters building can begin after soil contamination surveys, remediation and monitoring are completed, and is envisaged for the fiscal years ending September 2024 through September 2026. However, the timing remains undecided.」

    The plans for a new headquarters building, R&D centre and creative lab remain in place, but the relocation timing and total investment remain undecided.
  5. FY2020SoftenedAnnual report

    「The relocation is expected to take place during the fiscal years ending September 2024 through September 2026, after the lease term for the land acquired for construction of the new headquarters building expires on 31 October 2019 and soil contamination surveys, remediation and monitoring are completed. However, the timing remains undecided.」

    The plans for a new headquarters building, R&D centre and creative lab remain in place, but the construction timing was left undecided despite being envisaged for the fiscal years ending September 2024 through September 2026.
  6. FY2018AdvancedAnnual report

    「During the 23rd consolidated fiscal year, the Group’s total capital expenditure was ¥5,232 million. The principal components were the additional acquisition of land for the new headquarters building, amounting to ¥3,728 million, to accommodate the increase in employees and expansion in scale accompanying rapid business growth, and the acquisition of moulds for ¥377 million.」

    In addition to the additional acquisition of land for the new headquarters building, disclosed the capital expenditure for the year and the new headquarters plan envisaged for the fiscal years ending September 2022 through September 2024. The number of employees also increased by 331.
  7. FY2018-Q3First statedAnnual report

    「To accommodate the increase in employees and expansion in scale accompanying the rapid growth of the business, we had already acquired a 16,298.30 m² plot of land in Atsuta-ku, Nagoya, Aichi Prefecture, as the planned site for a new headquarters building, and in October 2017 acquired an additional 5,415.77 m² plot adjoining it.」

    Based on the expansion of the business and workforce, acquired additional land for a new headquarters building. The number of employees also increased by 284 during the cumulative period of the current quarter, reaching 1,158.
Moved together

"Expansion of Domestic and Overseas Store Networks and In-Person Sales Locations" moved the same way as this thread, in the same document, in 3 of its 7 moves.

333333★123456
  1. ★This thread
  2. 1Expansion of Domestic and Overseas Store Networks and In-Person Sales Locations3×
  3. 2Increasing Brand Awareness Through Advertising, Events and Brand Ambassadors3×
  4. 3Improving customer satisfaction through better customer service and proposals to existing customers3×
  5. 4Joint Product Development and Brand Partnerships with External Partners3×
  6. 5Continued Investment in New Product Development and R&D3×
  7. 6Risk of Share Value Dilution from the Exercise of Stock Acquisition Rights3×

★ is this thread; numbers match the list above. The number on a line is how many documents both moved the same way in; lines between the other threads count the documents they moved together in too. Threads that move together often sit closer.

When this could move next
Mtg's next results are scheduled for 2026-11-11. Read the earnings preview
News
No news is linked to this thread yet. When an article touches it, it will appear here by date.