Investment in Slipway Upgrades and Productivity-Enhancing Equipment

First written in FY2016. 7 of 11 entries say "Advanced", first in FY2017. Latest entry: FY2026.

11entries
11years
1from disclosures
Share on X
How it moved
ProgressHeldSoftenedWorseAdvancedFY2017 – FY2023AdvancedFY2025-H12016: 120162017: 120172018: 120182019: 020192020: 120202021: 120212022: 020222023: 220232024: 220242025: 020252026: 22026
Same theme, other companies
Expansion and Rationalization of Manufacturing FacilitiesA theme 419 companies write about · 0 as a headwind · 460 as a tailwind
Ridges = years it wrote progress, valleys = years it wrote worse. Most hopeful companies at the back. Drag to turn, scroll to zoom, right-drag to pan. On a phone, two fingers turn and pinch to zoom; one finger scrolls the page.
Showing 14 of the 183 companies compared. The sentences above are computed from all 183.Comparing 200 of the theme's 460 threads.
Full recordFilings, disclosures and news, newest first
  1. FY2026AdvancedAnnual report

    「Capital expenditures for the consolidated fiscal year totaled ¥1.235 billion, primarily for productivity-enhancing equipment and related assets. Capital expenditures for capacity expansion of cranes and related assets: ¥2.700 billion Total 2,700 Amount already paid 238 Internal funds March 2025 March 2028」

    The company invested ¥1.235 billion in capital expenditures during the fiscal year, including ¥1.151 billion in productivity-enhancing equipment and related assets at the Setoda and Innoshima plants. It also invested ¥2.7 billion in 2 tower cranes and related equipment to support the construction of zero-emission vessels and other vessels, with completion scheduled for March 2028.
  2. 2026-05-12RestatedResults

    「投資活動の結果使用した資金は32億50百万円(前年度は12億1百万円の使用)となった。これは主に、有価証券の取得による支出20億円、固定資産の取得による支出12億35百万円によるものである。」

    有価証券取得および固定資産取得を含む投資支出を継続している。
  3. FY2025-H1AdvancedAnnual report

    「Cash used in investing activities totaled ¥680 million, compared with ¥322 million used in the same period of the previous year. This was mainly due to ¥662 million in expenditure for the acquisition of property, plant and equipment.」

    The company spent ¥662 million on the acquisition of property, plant and equipment, resulting in capital expenditures exceeding the ¥295 million spent on such acquisitions in the same period of the previous year.
  4. FY2024SoftenedAnnual report

    「Capital expenditures for the consolidated fiscal year totaled ¥708 million, primarily for productivity-enhancing equipment and related assets. The required funds were provided through internal funds and borrowings.」

    Investment in productivity-enhancing equipment and related assets totaled ¥708 million, down from ¥1.220 billion in the previous fiscal year. As of the end of the consolidated fiscal year, there were no applicable plans for the construction or disposal of major facilities.
  5. FY2023AdvancedAnnual report

    「The company invested ¥1.220 billion, mainly in productivity-enhancing equipment and related assets at the Setoda and Innoshima plants, including the replacement of 1 tower crane installed at the Innoshima Plant (¥577 million).」

    The company invested ¥1.220 billion in productivity-enhancing equipment and related assets at the 2 plants, including ¥577 million for the replacement of 1 tower crane at the Innoshima Plant.
  6. FY2023-Q3AchievedAnnual report

    「Innoshima Plant (Onomichi, Hiroshima Prefecture) Shipbuilding Tower cranes (3 units) 2,033 Internal funds and borrowings September 2020 December 2022」

    The 3 tower cranes planned for the Innoshima Plant were completed in December 2022, at a total investment of ¥2.033 billion.
  7. FY2021AdvancedAnnual report

    「Shipbuilding The company invested ¥1.764 billion, mainly in productivity-enhancing equipment and related assets at the Setoda and Innoshima plants, including 1 tower crane installed at the Innoshima Plant (¥744 million).」

    The company invested ¥1.764 billion in productivity-enhancing equipment and related assets, including 1 tower crane at the Innoshima Plant. Separately, the planned installation of 2 tower cranes, with a total cost of ¥1.276 billion, remains ongoing.
  8. FY2020-Q3AdvancedAnnual report

    「Innoshima Plant (Onomichi, Hiroshima Prefecture) Shipbuilding Cranes 3 units 1,996 - Internal funds and borrowings June 2020 December 2022」

    A major capital investment plan was finalized to install 3 cranes at the Innoshima Plant at a total cost of ¥1.996 billion. Work began in June 2020 and was scheduled for completion in December 2022. The project was financed with internal funds and borrowings.
  9. FY2018AdvancedAnnual report

    「Capital expenditures for the consolidated fiscal year totaled ¥695 million, primarily for productivity-enhancing equipment and related assets.」

    The company invested in productivity-enhancing equipment and related assets, bringing capital expenditures to ¥695 million. The Shipbuilding segment invested ¥597 million, mainly at the Setoda and Innoshima plants.
  10. FY2017AdvancedAnnual report

    「Capital expenditures for the current consolidated fiscal year totaled ¥567 million, including renewal of the fixed and slipway berths and investment in productivity-enhancing equipment.」

    Investment was made in berth renewal and productivity-enhancing equipment, among other items, bringing capital expenditures to ¥567 million. The shipbuilding business invested ¥493 million, mainly at the Innoshima Plant.
  11. FY2016First statedAnnual report

    「Capital expenditures for the current consolidated fiscal year totaled ¥466 million, including renewal of the fixed and slipway berths and investment in productivity-enhancing equipment.」

    ¥454 million was invested in the shipbuilding business, mainly in berth renewal and productivity-enhancing equipment at the Innoshima Plant.
Moved together

"Increase in net assets and equity ratio" moved the same way as this thread, in the same document, in 7 of its 11 moves.

754442★123456
  1. ★This thread
  2. 1Increase in net assets and equity ratio7×
  3. 2Orders and order backlog, mainly for newbuild vessels5×
  4. 3Borrowing covenants concerning net assets, earnings and negative net worth4×
  5. 4Improvement in Net Sales, Ordinary Profit and Net Income4×
  6. 5Deteriorating operating environment for the hotel and restaurant business4×
  7. 6Efficient Production and Reductions in Material Costs and Fixed Costs Leveraging a Two-Shipyard Structure2×

★ is this thread; numbers match the list above. The number on a line is how many documents both moved the same way in; lines between the other threads count the documents they moved together in too. Threads that move together often sit closer.

When this could move next
Naikai Zosen's next results are scheduled for 2026-11-05. Read the earnings preview It last moved in the Results of 2026-05-12: "Restated".
News
No news is linked to this thread yet. When an article touches it, it will appear here by date.