First written in FY2016. 7 of 11 entries say "Advanced", first in FY2017. Latest entry: FY2026.
- FY2026AdvancedAnnual report
「Capital expenditures for the consolidated fiscal year totaled ¥1.235 billion, primarily for productivity-enhancing equipment and related assets. Capital expenditures for capacity expansion of cranes and related assets: ¥2.700 billion Total 2,700 Amount already paid 238 Internal funds March 2025 March 2028」
The company invested ¥1.235 billion in capital expenditures during the fiscal year, including ¥1.151 billion in productivity-enhancing equipment and related assets at the Setoda and Innoshima plants. It also invested ¥2.7 billion in 2 tower cranes and related equipment to support the construction of zero-emission vessels and other vessels, with completion scheduled for March 2028. - 2026-05-12RestatedResults
「投資活動の結果使用した資金は32億50百万円(前年度は12億1百万円の使用)となった。これは主に、有価証券の取得による支出20億円、固定資産の取得による支出12億35百万円によるものである。」
有価証券取得および固定資産取得を含む投資支出を継続している。 - FY2025-H1AdvancedAnnual report
「Cash used in investing activities totaled ¥680 million, compared with ¥322 million used in the same period of the previous year. This was mainly due to ¥662 million in expenditure for the acquisition of property, plant and equipment.」
The company spent ¥662 million on the acquisition of property, plant and equipment, resulting in capital expenditures exceeding the ¥295 million spent on such acquisitions in the same period of the previous year. - FY2024SoftenedAnnual report
「Capital expenditures for the consolidated fiscal year totaled ¥708 million, primarily for productivity-enhancing equipment and related assets. The required funds were provided through internal funds and borrowings.」
Investment in productivity-enhancing equipment and related assets totaled ¥708 million, down from ¥1.220 billion in the previous fiscal year. As of the end of the consolidated fiscal year, there were no applicable plans for the construction or disposal of major facilities. - FY2023AdvancedAnnual report
「The company invested ¥1.220 billion, mainly in productivity-enhancing equipment and related assets at the Setoda and Innoshima plants, including the replacement of 1 tower crane installed at the Innoshima Plant (¥577 million).」
The company invested ¥1.220 billion in productivity-enhancing equipment and related assets at the 2 plants, including ¥577 million for the replacement of 1 tower crane at the Innoshima Plant. - FY2023-Q3AchievedAnnual report
「Innoshima Plant (Onomichi, Hiroshima Prefecture) Shipbuilding Tower cranes (3 units) 2,033 Internal funds and borrowings September 2020 December 2022」
The 3 tower cranes planned for the Innoshima Plant were completed in December 2022, at a total investment of ¥2.033 billion. - FY2021AdvancedAnnual report
「Shipbuilding The company invested ¥1.764 billion, mainly in productivity-enhancing equipment and related assets at the Setoda and Innoshima plants, including 1 tower crane installed at the Innoshima Plant (¥744 million).」
The company invested ¥1.764 billion in productivity-enhancing equipment and related assets, including 1 tower crane at the Innoshima Plant. Separately, the planned installation of 2 tower cranes, with a total cost of ¥1.276 billion, remains ongoing. - FY2020-Q3AdvancedAnnual report
「Innoshima Plant (Onomichi, Hiroshima Prefecture) Shipbuilding Cranes 3 units 1,996 - Internal funds and borrowings June 2020 December 2022」
A major capital investment plan was finalized to install 3 cranes at the Innoshima Plant at a total cost of ¥1.996 billion. Work began in June 2020 and was scheduled for completion in December 2022. The project was financed with internal funds and borrowings. - FY2018AdvancedAnnual report
「Capital expenditures for the consolidated fiscal year totaled ¥695 million, primarily for productivity-enhancing equipment and related assets.」
The company invested in productivity-enhancing equipment and related assets, bringing capital expenditures to ¥695 million. The Shipbuilding segment invested ¥597 million, mainly at the Setoda and Innoshima plants. - FY2017AdvancedAnnual report
「Capital expenditures for the current consolidated fiscal year totaled ¥567 million, including renewal of the fixed and slipway berths and investment in productivity-enhancing equipment.」
Investment was made in berth renewal and productivity-enhancing equipment, among other items, bringing capital expenditures to ¥567 million. The shipbuilding business invested ¥493 million, mainly at the Innoshima Plant. - FY2016First statedAnnual report
「Capital expenditures for the current consolidated fiscal year totaled ¥466 million, including renewal of the fixed and slipway berths and investment in productivity-enhancing equipment.」
¥454 million was invested in the shipbuilding business, mainly in berth renewal and productivity-enhancing equipment at the Innoshima Plant.