Fundamental Disaster-Prevention Measures for the National Land through Accountable Infrastructure

First written in FY2020-Q2. 10 of 12 entries say "Advanced", first in FY2021-Q3. Latest entry: 2026-10-09.

12entries
7years
2from disclosures
Share on X
How it moved
ProgressHeldSoftenedWorseFirst statedFY2020-Q2 – FY2021-Q1AdvancedFY2021-Q3 – 2026-10-092020: 120202021: 320212022: 220222023: 220232024: 120242025: 120252026: 22026
Same theme, other companies
National disaster prevention and infrastructure resilience through responsible structuresA theme 1 companies write about · 0 as a headwind · 1 as a tailwind

No other company in this theme has enough history to compare yet.

Full recordFilings, disclosures and news, newest first
  1. FY2025AdvancedAnnual report

    「At the site of a road collapse in Yashio City, Saitama Prefecture, press-in technology enabling vibration-free, noise-free and space-efficient construction was adopted to build a sewer bypass route and for other works, and the emergency response was completed. Nationwide sewer-pipe inspections following the accident identified approximately 300 km of pipelines as requiring action, making repairs and renewal urgent.」

    The responsible-structure and infrastructure disaster-prevention initiative took concrete form in an emergency response to build a sewer bypass following the road collapse in Yashio City.
  2. FY2024AdvancedAnnual report

    「We received an order for bridge abutment reinforcement work at Noto Ohashi Bridge on the Noto Satoyama Kaido, where a collapse had forced alternating one-way traffic, as part of emergency restoration efforts. Using the Gyro Piler and the GRB System, we contributed to the early restoration of two-way traffic.」

    Disaster recovery through responsible structures and Implant structures progressed to concrete construction work involving bridge abutment reinforcement at Noto Ohashi Bridge and the early restoration of two-way traffic.
  3. FY2023AdvancedAnnual report

    「Construction progressed smoothly on coastal levee rehabilitation in Kochi Prefecture as a measure against a potential Nankai Trough megathrust earthquake, seawall rehabilitation in Tokyo as a measure against earthquakes and storm surges, seawall reinforcement in the Hijikawa River basin in Ehime Prefecture, which was affected by the July 2018 heavy rains in western Japan, and reinforcement of fishing-port seawalls in Hokkaido, among other projects.」

    Disaster-prevention measures using responsible structures and Implant structures progressed at sites nationwide through the construction of coastal levees, river and port seawalls, and fishing-port seawalls.
  4. FY2023-Q1AdvancedAnnual report

    「A large-scale project to build a durable coastal levee using an Implant structure in Ofunato City, Iwate Prefecture, with a total length of 750 m, was completed in November 2022 after approximately 4 years and 1 month from the start of construction in October 2018.」

    Disaster-prevention measures using responsible structures and durable Implant structures progressed to a completed coastal levee construction project in Ofunato City, Iwate Prefecture.
  5. FY2022AdvancedAnnual report

    「On National Routes 219 in Kuma Village, Kumamoto Prefecture, and 210 in Hita City, Oita Prefecture, which collapsed after river flooding, group company 株式会社技研施工 built durable road retaining walls using Implant structures to prevent repeat disasters.」

    The national disaster-prevention initiative through responsible structures took concrete form in the construction of road retaining walls on National Routes 219 and 210.
  6. FY2022-Q1AdvancedAnnual report

    「As part of efforts to move away from the principle of using earthen embankments, construction of an Implant Levee within the body of a river levee is progressing on the Kokubungawa earthquake and storm-surge countermeasure project in Kochi Prefecture. The plan is to monitor the behavior of the levee body, corrosion of the steel sheet piles and deformation over the long term in order to demonstrate the performance of the Implant Levee.」

    The proposal for national disaster prevention through responsible structures was turned into a concrete plan to build an Implant levee as part of the Kokubugawa project and to establish a long-term performance verification programme.
  7. FY2021AdvancedAnnual report

    「We proposed the durable Implant Lock levee developed by the company to relevant government ministries and agencies and local-government officials. The proposal was also discussed by the Council for Infrastructure Development of the Ministry of Land, Infrastructure, Transport and Tourism and taken up as an issue requiring consideration for the future.」

    The proposal for national disaster prevention through responsible structures progressed beyond proposals to relevant government ministries, agencies and local governments to the stage of discussion by the Council for Infrastructure Development of the Ministry of Land, Infrastructure, Transport and Tourism.
  8. FY2021-Q3AdvancedAnnual report

    「Regarding the failure of river levees, a cause of the frequent large-scale flooding in recent years, we are strongly appealing to the public that the essential purpose of levees is to protect people's lives and property and that they must be “responsibility structures” that must never fail. We continue to propose Implant Rock Levees persistently to the relevant ministries and agencies and local-government officials, and are pursuing fundamental measures.」

    In addition to relevant government ministries and agencies, the company is proposing Implant Lock levees to local-government officials as a fundamental national disaster-prevention measure through responsible structures.
  9. FY2021-Q1RestatedAnnual report

    「Regarding the failure of river levees, a cause of the frequent large-scale flooding in recent years, we are strongly appealing to the public that the essential purpose of levees is to protect people's lives and property and that they must be “responsibility structures” that must never fail. We continue to make proposals to and negotiate persistently with the relevant ministries and agencies, and are pursuing fundamental measures based on Implant structures, including Implant Rock Levees.」

    The company continues to position the Implant Method as a means of building responsible structures and continues its proposals and negotiations toward implementing Implant Lock levees and other projects.
  10. FY2020-Q2First statedAnnual report

    「The Implant Method is a fundamental construction method for building 'responsible structures' capable of minimising flood damage and protecting people's lives.」

    The Implant Method has newly been described as a means of building 'responsible structures' that limit flood damage and protect people's lives.
Moved together

"Recognition of the advantages of the implant construction method and its expanding adoption in various regions" moved the same way as this thread, in the same document, in 9 of its 12 moves.

988766★123456
  1. ★This thread
  2. 1Recognition of the advantages of the implant construction method and its expanding adoption in various regions9×
  3. 2Global Expansion Through Packaging of the Implant Construction Method8×
  4. 3Development of Equipment and Construction Methods for Diverse Construction Conditions, Pile Materials and Large-Diameter Piles8×
  5. 4Expansion of the Press-Fit Market Through Broader Applications and Coverage Areas7×
  6. 5GRB System Standardization and Package Rollout with Silent Piling Machines6×
  7. 6Labor-saving and automation of construction through PPTS automated operation, AI and IoT6×

★ is this thread; numbers match the list above. The number on a line is how many documents both moved the same way in; lines between the other threads count the documents they moved together in too. Threads that move together often sit closer.

When this could move next
Giken's next results are scheduled for 2026-10-09. Read the earnings preview It last moved in the Other Disclosures of 2026-10-09: "Advanced".
News
No news is linked to this thread yet. When an article touches it, it will appear here by date.
Fundamental Disaster-Prevention Measures for the National Land through Accountable Infrastructure | GIKEN LTD. (6289) | Komori