Komori
Will Group (6089) · RiskMitigated

Risk of Business Interruption Due to Natural Disasters, Infectious Diseases, and System Failures

First written in FY2016. 3 of 6 entries say "Mitigated", first in FY2021. Latest entry: FY2026.

6entries
11years
0from disclosures
Share on X
How it moved
ProgressHeldSoftenedWorseRestatedFY2016 – FY2018MitigatedFY2021 – FY20262016: 120162017: 120172018: 120182019: 020192020: 020202021: 120212022: 020222023: 020232024: 020242025: 120252026: 12026
Same theme, other companies
Business continuity risk due to major disasters and system failuresA theme 88 companies write about · 85 as a headwind · 4 as a tailwind

The whole theme swung hardest in 2020: 22 of 49 companies on the "Worse" side.

14 other companies' latest entry also says "Mitigated".

Ridges = years it wrote progress, valleys = years it wrote worse. Most hopeful companies at the back. Drag to turn, scroll to zoom, right-drag to pan. On a phone, two fingers turn and pinch to zoom; one finger scrolls the page.
Showing 14 of the 88 companies compared. The sentences above are computed from all 88.
Full recordFilings, disclosures and news, newest first
  1. FY2026MitigatedAnnual report

    「The Group has also implemented measures to ensure business continuity, such as geographically dispersing the functions of its business locations and migrating information assets to the cloud.」

    For natural disasters, infectious diseases and emergencies, the Group continues to maintain safety confirmation and crisis management systems, geographically dispersed location functions, and the migration of information assets to the cloud.
  2. FY2025MitigatedAnnual report

    「The Group has also implemented measures to ensure business continuity, such as geographically dispersing the functions of its business locations and migrating information assets to the cloud.」

    For natural disasters, infectious diseases and emergencies, the Group continues to implement business continuity measures, including safety confirmation and crisis management systems, geographically dispersed locations, and the migration of information assets to the cloud.
  3. FY2021MitigatedAnnual report

    「The Group ensures system availability in the event of natural disasters such as major earthquakes and establishes a remote-work environment through the use of highly rated data centers and cloud services. It has also implemented measures against external cyberattacks and unauthorized access to ensure business continuity.」

    Specific measures addressing the risks of natural disasters, infectious diseases and system failures, including data centers, cloud services, remote work and cyberattack countermeasures, were disclosed.
  4. FY2018RestatedAnnual report

    「The Group has prepared crisis management manuals for natural disasters, including major earthquakes and floods, and infectious diseases, and is prepared for such events. However, they cannot be completely avoided, and any resulting damage may affect business performance.」

    The impact of natural disasters, infectious diseases and system failures on business activities, together with the crisis management manuals, continues to be disclosed.
  5. FY2017RestatedAnnual report

    「In addition, the Group's business activities depend on computer systems and networks. If a system failure occurs for any reason, in addition to natural disasters, it may affect the Group's business activities.」

    The potential business impact of natural disasters, infectious diseases, and computer system or network failures continues to be disclosed.
  6. FY2016First statedAnnual report

    「The Group has sales offices throughout Japan, and its business activities may be disrupted in the event of a natural disaster or the emergence of a new infectious disease.」

    A crisis management manual has been prepared, but it states that the effects of natural disasters, infectious diseases and system failures may not be completely avoided.
Moved together

"Entry into Engineer Staffing and Placement" moved the same way as this thread, in the same document, in 3 of its 6 moves.

333222★123456
  1. ★This thread
  2. 1Entry into Engineer Staffing and Placement3×
  3. 2Financing Through Stock Acquisition Rights with a Variable Exercise Price3×
  4. 3IT Infrastructure Investment in Core Systems and Data Centers3×
  5. 4“Chance-Making-Company” Branding2×
  6. 5Recruitment and Development of Highly Specialized Staff2×
  7. 6Strengthening Oversight through the Nomination and Compensation Committee and Board Effectiveness Assessments2×

★ is this thread; numbers match the list above. The number on a line is how many documents both moved the same way in; lines between the other threads count the documents they moved together in too. Threads that move together often sit closer.

When this could move next
No upcoming earnings preview for Will Group yet.
News
No news is linked to this thread yet. When an article touches it, it will appear here by date.
Risk of Business Interruption Due to Natural Disasters, Infectious Diseases, and System Failures | WILL GROUP,INC. (6089) | Komori