TESS Holdings (5074) · InitiativeAchievedLatest Share Issuance and Disposal (2026-08-07): "Cited as achieved"

Development of a Wood Biomass Power Plant in Nishiki Town, Kumamoto Prefecture

First written in FY2021. 2 of 9 entries say "Advanced", first in FY2022-Q1. Latest entry: 2026-08-07.

9entries
6years
1from disclosures
Share on X
How it moved
ProgressHeldSoftenedWorseAdvancedFY2022-Q1 – FY2022-Q3RestatedFY2023-Q1 – FY2023AchievedFY2024-Q12021: 220212022: 220222023: 420232024: 020242025: 020252026: 12026
Same theme, other companies
Development of a Wood Biomass Power Plant in Nishiki Town, Kumamoto PrefectureA theme 1 companies write about · 0 as a headwind · 1 as a tailwind

No other company in this theme has enough history to compare yet.

Full recordFilings, disclosures and news, newest first
  1. 2026-08-07Cited as achievedShare Issuance and Disposal

    「② Power generation business at the “Nishiki 2 MW Woody Biomass Power Plant”」

    For the Nishiki 2 MW Woody Biomass Power Plant, the company reported full allocation of proceeds raised, installed capacity of approximately 2.0 MW, CO₂ emissions reductions of 5,327 t-CO₂ per year (cumulative: 14,817 t-CO₂), and cumulative employment of 15 people.
  2. FY2024-Q1AchievedAnnual report

    「During the first quarter consolidated cumulative period, the Nishiki 2MW Wood Biomass Power Plant in Nishiki, Kuma District, Kumamoto Prefecture, with generating capacity of approximately 2.0MW, newly commenced operations at the consolidated subsidiary 合同会社熊本錦グリーンパワー. It is a power plant developed and constructed by the Group under the FIT Scheme.」

    The Nishiki 2MW Wood Biomass Power Plant commenced operations in September 2023, bringing the construction plan to the start of operations.
  3. FY2023Further increase in planned investment and further postponement of planned completionAnnual report

    「The total planned investment was changed from ¥2,899 million to ¥3,514 million due to the addition of specifications to improve the economics of the power generation business, fluctuations in the prices of overseas-procured products and construction costs, among other factors. In addition, the planned completion month was changed from July 2023 to September 2023 because delivery was delayed due to logistics conditions for overseas-procured products.」

    For the Nishiki 2MW Wood Biomass Power Plant, the planned investment was increased again to ¥3,514 million, and planned completion was postponed again to September 2023.
  4. FY2023-Q3Higher investment and delayed completionAnnual report

    「The total planned investment was changed from ¥2,899 million to ¥3,186 million due to the addition of specifications to improve the economics of the power generation business, fluctuations in the prices of overseas-procured products and construction costs, among other factors. In addition, the planned completion month was changed from July 2023 to August 2023 because delivery was delayed due to logistics conditions for overseas-procured products.」

    For the TESS Nishikimachi Kiginishi Biomass Power Plant, the planned investment was increased due to added specifications and fluctuations in the prices of overseas-procured products and construction costs, while planned completion was postponed to August 2023 due to logistics delays.
  5. FY2023-Q2RestatedAnnual report

    「There has been no change in the plan from the end of the previous consolidated fiscal year.」

    For the TESS Nishikimachi Kiginishi Biomass Power Plant, the company maintains a plan for total planned investment of ¥2,899 million, ¥1,361 million already paid, completion in July 2023 and generating capacity of 2.0MW after completion.
  6. FY2023-Q1RestatedAnnual report

    「There has been no change in the plan from the end of the previous consolidated fiscal year.」

    For the TESS Nishikimachi Kiginishi Biomass Power Plant, the company maintains a plan for total planned investment of ¥2,899 million, ¥1,005 million already paid, completion in July 2023 and generating capacity of 2.0MW after completion.
  7. FY2022-Q3AdvancedAnnual report

    「There has been a change in the plan from the end of the previous consolidated fiscal year (Note 2).」

    For the Nishikimachi Kiginishi Biomass Power Plant, the company states a total planned investment of ¥2,899 million, ¥622 million already paid and planned completion in July 2023, indicating a change in the total planned investment.
  8. FY2022-Q1AdvancedAnnual report

    「During the first quarter consolidated cumulative period, there were no material changes in the business conducted by the Group, comprising the company and its affiliated companies. As changes among major affiliated companies, 合同会社熊本錦グリーンパワー and 株式会社伊万里グリーンパワー were newly included in the scope of consolidation during the first quarter consolidated cumulative period.」

    熊本錦グリーンパワー was newly included in the scope of consolidation. This does not indicate completion of power plant construction, but rather progress in the consolidation treatment of the project entity.
  9. FY2021First statedAnnual report

    「In June 2021, 合同会社熊本錦グリーンパワー was established, and construction of the power plant will proceed toward the planned start of power generation operations in July 2023.」

    The company states the establishment of the project entity, planned start date and construction of a power plant using local woody resources.
Moved together

"Expansion of EPC Business in Power Generation and Utility Facilities" moved the same way as this thread, in the same document, in 3 of its 9 moves.

3322★1234
  1. ★This thread
  2. 1Expansion of EPC Business in Power Generation and Utility Facilities3×
  3. 2Ownership, Operation and Electricity Sales from Renewable Energy Power Plants3×
  4. 3Development of a large-scale solar power plant with an output of approximately 67 MW in Miyako Town, Fukuoka Prefecture2×
  5. 4Making the Approximately 46 MW Imari Biomass Power Generation Business a Wholly Owned Subsidiary2×

★ is this thread; numbers match the list above. The number on a line is how many documents both moved the same way in; lines between the other threads count the documents they moved together in too. Threads that move together often sit closer.

When this could move next
No upcoming earnings preview for TESS Holdings yet. It last moved in the Share Issuance and Disposal of 2026-08-07: "Cited as achieved".
News
No news is linked to this thread yet. When an article touches it, it will appear here by date.
Development of a Wood Biomass Power Plant in Nishiki Town, Kumamoto Prefecture | TESS Holdings Co.,Ltd. (5074) | Komori