Small-Scale Hydropower Using Agricultural Irrigation Canals

First written in FY2016. 5 of 14 entries say "Advanced", first in FY2017-Q1. Latest entry: FY2020-Q2.

14entries
4years
0from disclosures
Share on X
How it moved
ProgressHeldSoftenedWorseAdvancedFY2017-Q1 – FY2018-Q1RestatedFY2018-Q2 – FY2018-Q3RestatedFY2019-Q1 – FY2020-Q12016: 320162017: 320172018: 420182019: 42019
Same theme, other companies
Commercialization of New Businesses Based on Water ResourcesA theme 6 companies write about · 3 as a headwind · 3 as a tailwind

0 other companies' latest entry also says "Achieved".

Ridges = years it wrote progress, valleys = years it wrote worse. Most hopeful companies at the back. Drag to turn, scroll to zoom, right-drag to pan. On a phone, two fingers turn and pinch to zoom; one finger scrolls the page.
Full recordFilings, disclosures and news, newest first
  1. FY2020-Q2AchievedAnnual report

    「Based on the policy to discontinue the business, the Group completed the discontinuation of the business in July 2019.」

    The company completed the discontinuation of the renewable energy business, including small-scale hydropower using agricultural irrigation canals, in July 2019.
  2. FY2020-Q1Continuation of the business discontinuation planAnnual report

    「Based on the policy to discontinue the business decided in February 2019, the Group is proceeding toward completing the discontinuation of the business.」

    The company is proceeding with the steps to wind down the renewable energy business, including small-scale hydropower using agricultural irrigation canals, based on its discontinuation policy.
  3. FY2019DroppedAnnual report

    「Based on the profitability study, the company determined in February 2019 to discontinue the business, as profitability would be difficult to secure and further time and costs were expected to be required for adjustments and negotiations to improve profitability.」

    The company had continued developing new sites for facilities of 100kW or more using pressurized conduits, but decided to discontinue the business based on the profitability study.
  4. FY2019-Q3RestatedAnnual report

    「The Group is working to identify new sites for power generation facilities of 100 kW or more using pressurized conduits, with the aim of increasing power generation over the medium to long term.」

    In the renewable energy business, the company continued developing new sites for power generation facilities of 100kW or more.
  5. FY2019-Q2RestatedAnnual report

    「The Group is working to identify new sites for power generation facilities of 100 kW or more using pressurized conduits, with the aim of increasing power generation over the medium to long term.」

    In the renewable energy business, the company continued developing new sites for power generation facilities of 100kW or more.
  6. FY2019-Q1RestatedAnnual report

    「The Group is working to identify new sites for power generation facilities of 100 kW or more using pressurized conduits, with the aim of increasing power generation over the medium to long term.」

    In the renewable energy business, the company continued developing new sites for power generation facilities of 100kW or more.
  7. FY2018AdvancedAnnual report

    「In addition to operating the 2 small-scale hydropower plants installed in agricultural irrigation channels in the previous fiscal year as a joint project with Shinbo Irrigation and Land Improvement District in Toyama Prefecture, the Group continued efforts from the previous fiscal year to identify new sites for power generation facilities of 100 kW or more using pressurized conduits, with the aim of increasing power generation over the medium to long term.」

    The company operated 2 small-scale hydropower plants installed in Toyama Prefecture and continued developing new sites for facilities of 100kW or more.
  8. FY2018-Q3RestatedAnnual report

    「To increase power generation over the medium to long term, the Group continued efforts from the previous fiscal year to identify new sites for power generation facilities of 100 kW or more using pressurized conduits.」

    The Group continues to identify new sites for power generation facilities of 100 kW or more.
  9. FY2018-Q2RestatedAnnual report

    「To increase power generation over the medium to long term, the Group continued efforts from the previous fiscal year to identify new sites for power generation facilities of 100 kW or more using pressurized conduits.」

    The company continued developing new sites for power generation facilities of 100kW or more.
  10. FY2018-Q1AdvancedAnnual report

    「Revenue from the Renewable Energy Business was ¥548 thousand, compared with ¥0 thousand in the same period of the previous year. The segment recorded a loss of ¥17,487 thousand, compared with a segment loss of ¥14,981 thousand in the same period of the previous year. To increase power generation over the medium to long term, the Group continued efforts from the previous fiscal year to identify new sites for power generation facilities of 100 kW or more using pressurized conduits.」

    The renewable energy business began generating revenue, and the company continued developing new sites for power generation facilities of 100kW or more. Meanwhile, the segment loss widened from the same period of the previous year.
  11. FY2017-Q3AdvancedAnnual report

    「To increase power generation over the medium to long term, the company has been investigating and specifically evaluating potential sites for power generation facilities, as well as the possibility of installing medium-scale generation facilities using pressurized conduits. In October 2016, it entered into a contract with the Shinbo Irrigation District in Toyama Prefecture to install a power generation facility in an agricultural irrigation canal managed by the district as a new site. It also improved the demonstration facility installed in Osaki, Miyagi Prefecture, using an open agricultural irrigation canal.」

    The company progressed to signing a contract for the new installation in Toyama Prefecture, while the demonstration facility in Osaki progressed from trial operation and testing to improvement work.
  12. FY2017-Q2AdvancedAnnual report

    「To increase power generation over the medium to long term, the company has been investigating and specifically evaluating potential sites for power generation facilities, as well as the possibility of installing medium-scale generation facilities using pressurized conduits. In August 2016, it reached an agreement with the Shinbo Irrigation District in Toyama Prefecture to install a power generation facility in an agricultural irrigation canal managed by the district as a new site. Trial operation and testing have also continued at the demonstration facility installed in Osaki, Miyagi Prefecture, in December of the previous year, using an open agricultural irrigation canal.」

    Trial operation and testing continued at the demonstration facility in Osaki, and the company progressed to an agreement with the managing entity regarding a new installation in Toyama Prefecture.
  13. FY2017-Q1AdvancedAnnual report

    「Trial operation and testing have continued at the demonstration facility installed in Osaki, Miyagi Prefecture, in December of the previous year, using an open agricultural irrigation canal. In addition, to increase power generation over the medium to long term, the company has begun investigating and specifically evaluating potential sites for power generation facilities outside Miyagi and Fukushima prefectures, as well as the possibility of installing medium-scale generation facilities using pressurized conduits.」

    In addition to continuing trial operation and testing of the first plant, the company began considering expansion to medium-scale facilities and to areas outside Miyagi and Fukushima prefectures.
  14. FY2016First statedAnnual report

    「During the fiscal year, installation of the first small-scale hydropower plant using an agricultural irrigation canal was completed.」

    The renewable energy business was launched as a new reporting segment, and the company progressed to completion of installation of its first plant.
Moved together

"Expansion into the smartphone game market" moved the same way as this thread, in the same document, in 6 of its 14 moves.

6632★1234
  1. ★This thread
  2. 1Expansion into the smartphone game market6×
  3. 2Cultivating a New Medium- to Long-Term Revenue Model6×
  4. 3Building a New Business in Mobile Content3×
  5. 4Shareholder Returns Through Stable Dividends and Enhancing Corporate Value2×

★ is this thread; numbers match the list above. The number on a line is how many documents both moved the same way in; lines between the other threads count the documents they moved together in too. Threads that move together often sit closer.

When this could move next
Imagineer's next results are scheduled for 2026-10-28. Read the earnings preview
News
No news is linked to this thread yet. When an article touches it, it will appear here by date.
Small-Scale Hydropower Using Agricultural Irrigation Canals | Imagineer Co.,Ltd. (4644) | Komori