Investment in Factory Capacity Expansion and New Store Openings
First written in FY2016. 20 of 27 entries say "Advanced", first in FY2017. Latest entry: FY2027-H1.
The whole theme swung hardest in 2021: 1 of 12 companies on the "Worse" side.
14 other companies' latest entry also says "Advanced".
- FY2027-H1AdvancedAnnual report
「The Company added production lines at its own factories and pursued further productivity improvements and cost reductions.」
It added production lines at its own factories and improved productivity and costs, while spending ¥2,143 million on the acquisition of property, plant and equipment in investing activities. - FY2026AdvancedAnnual report
「During the consolidated fiscal year, the Food Business carried out construction of a new Kyushu Plant. In the Food Service Business, it opened 8 new domestic outlets in the Osaka Ohsho format, 3 in the ramen format, 3 in the bakery and café format and 4 in other formats, as well as 1 overseas outlet in other formats. As a result, total capital expenditures for the consolidated fiscal year amounted to ¥5,487 million.」
The company carried out construction of a new Kyushu Plant and opened new outlets in Japan and overseas, bringing full-year capital expenditures to ¥5,487 million. - FY2025AdvancedAnnual report
「During the consolidated fiscal year, the Food Business carried out restoration work at the Kanto No. 3 Plant. In the Food Service Business, it opened 13 new domestic outlets in the Osaka Ohsho format, 1 in the ramen format and 1 in other formats, as well as 1 overseas outlet in the Osaka Ohsho format. As a result, total capital expenditures for the consolidated fiscal year amounted to ¥5,344 million.」
The company carried out restoration work at the Kanto No. 3 Plant and opened new outlets in Japan and overseas, bringing full-year capital expenditures to ¥5,344 million. - FY2025-H1Updated first-half investment resultsAnnual report
「Cash used in investing activities was ¥2,247 million. The main factor was expenditure on the acquisition of property, plant and equipment.」
Investing activities used ¥2,247 million in FY2025-H1, primarily due to the acquisition of property, plant and equipment. - FY2024AdvancedAnnual report
「The Company will construct the Kanto Logistics Base (KLB) to help contain logistics and other costs. In addition, with the aim of strengthening its production system in western Japan, it acquired preferential negotiating rights for Lot G in the Sakuragi District of the Miyakonojo Interchange Industrial Park, with a site area of 8,259.88 m². The Company will use the site in Miyakonojo, Miyazaki Prefecture, to build a new plant as an additional supply base for western Japan, with operations targeted to begin in 2026.」
In addition to the construction plan for Logistics Facility KLB, the company presented specific plans for a new plant in Miyakonojo, Miyazaki Prefecture, with a site area of 8,259.88 m² and operations scheduled to begin in 2026. - FY2024-Q2Updated first-half investment resultsAnnual report
「Cash used in investing activities was ¥1,425 million. The main factor was expenditure on the acquisition of property, plant and equipment.」
Spent ¥1,425 million on investing activities during the six months ended the second quarter, with the acquisition of property, plant and equipment cited as the main expenditure. - FY2024-Q1AdvancedAnnual report
「At the production plants, which are the core of the Group's manufacturing operations, the fried gyoza production line at the newly built Kanto No. 3 Plant, among the largest and fastest in Japan, began operating as planned. As raw material, logistics and energy costs continued to rise, the Group worked to further improve productivity and efficiency.」
The roasted gyoza production line at the Kanto No. 3 Plant began operating as planned, progressing from completion of the plant and equipment to the production-line operating stage. - FY2023-Q3AchievedAnnual report
「株式会社イートアンドフーズ Kanto No. 3 Plant Itakura, Ora District, Gunma Prefecture Food Business Food ingredient processing November 2022」
The food-processing equipment at the planned Kanto No. 3 Plant was completed in November 2022. - FY2023-Q2Updated first-half investment resultsAnnual report
「Cash used in investing activities was ¥1,758 million. The main factor was expenditure on the acquisition of property, plant and equipment.」
Spent ¥1,758 million on investing activities during the six months ended the second quarter, with the acquisition of property, plant and equipment cited as the main expenditure. No specific facility or plant was identified. - FY2022AdvancedAnnual report
「The Kanto No. 3 Plant is scheduled for completion and start-up in October 2022, with annual production volume expected to increase by approximately 20%.」
Following the start-up of a new line at the Kanto No. 2 Plant, the Company expects the Kanto No. 3 Plant to be completed and start operations in October 2022, increasing annual production volume by approximately 20%. - FY2022-Q1AdvancedAnnual report
「The Company's manufacturing plants, including the Kanto No. 1 Plant and Kanto No. 2 Plant in Itakura, Ora District, Gunma Prefecture, which are at the core of the Group's operations, have achieved further efficiency and labor savings through the active use of AI and robotics. The Company plans to build the Kanto No. 3 Plant on land adjacent to the Kanto No. 2 Plant to expand production facilities and meet rising demand for core products such as Osaka Ohsho Hanetsuki Gyoza.」
The Company decided to build the Kanto No. 3 Plant on land adjacent to the Kanto No. 2 Plant. Total investment is expected to be approximately ¥2,400 million, production capacity approximately 595 t per month, construction is scheduled to start in December 2021, and operations are scheduled to begin in October 2022. - FY2020AchievedAnnual report
「During the current consolidated fiscal year, we completed construction of the Second Kanto Factory in November 2019, installed state-of-the-art equipment incorporating AI and robotics to enhance safety, reduced manual labor, and secured sufficient production capacity to accommodate future increases in demand.」
Construction and completion of the New Kanto Plant and establishment of a production system using AI and robotics were completed, leading to the start of operations. - FY2020-Q4AdvancedAnnual report
「In November, we completed construction of the Second Kanto Factory on land adjacent to the existing factory in Gunma Prefecture and established a production system capable of significantly more efficient production than before, using the latest equipment with extensive AI technology and robotics.」
The New Kanto Plant progressed from the construction-planning and scheduled-start stage to the stage of completion in November 2019 and establishing a production system using advanced equipment. - FY2020-Q3RestatedAnnual report
「We plan to begin operations at the Second Kanto Factory in the second half of the current fiscal year and establish a more efficient production system using the latest equipment.」
Reaffirmed the investment plan to start operations at the Kanto No. 2 Plant in the second half of the current fiscal year and establish an efficient production system using advanced equipment. - FY2020-Q2AdvancedAnnual report
「We are also preparing to begin operations at the New Kanto Factory in December 2019. Each business, brand and format is returning to the starting point for its products and services, while working to further expand sales of products manufactured in-house by strengthening core products and creating hit products.」
Specified December 2019 as the scheduled start of operations at the New Kanto Plant and presented a plan to use the investment to expand sales of the Company's manufactured products. - FY2019AdvancedAnnual report
「For the New Kanto Plant in Itakura, Ora District, Gunma Prefecture, the planned investment was ¥3,500 million, the amount already paid was ¥992 million, funding was to come from capital raised and borrowings, construction was scheduled to start in November 2018 and be completed in October 2019, and production capacity after completion was expected to be 740 mt per month.」
Specified the capital investment plan for the New Kanto Plant: total investment of ¥3,500 million, ¥992 million already paid, completion scheduled for October 2019, and production capacity of 740 mt per month. - FY2019-Q4AdvancedAnnual report
「In the production business, which is the core of our unique, unparalleled business model as a full-line food manufacturer, we began construction of the New Kanto Factory on land adjacent to the existing Kanto Factory to further expand frozen-food production capacity.」
Reported that construction of the New Kanto Plant had progressed from the planning and scheduled-start stage to the actual construction stage. - FY2019-Q3AdvancedAnnual report
「In the production business, which is the core of our unique, unparalleled business model as a full-line food manufacturer, we undertook fundamental enhancements aimed at expanding production capacity and improving business efficiency, including logistics. We began construction of a new factory on land adjacent to the existing Kanto Factory to further expand frozen-food production capacity, proceeded with construction of a new cold-storage building in preparation for higher logistics costs, and began in-house production of gyoza sauce.」
The previously planned New Kanto Plant progressed to the construction-start stage, with construction of a new freezer building also under way. - FY2019-Q2AdvancedAnnual report
「The Company plans to allocate all funds from the public offering and third-party allotment to capital expenditure for construction of the New Kanto Plant during the fiscal year ending March 2020.」
The Company specified its funding plan for the previously announced New Kanto Plant, allocating all proceeds from the capital increase to capital expenditure during the fiscal year ending March 2020. - FY2018AdvancedAnnual report
「The Company has grown as a unique business-model company focused on its production business and maximizing synergies among its food products and food-service businesses. The Kanto Plant in Itakura, Ora District, Gunma Prefecture, one of the manufacturing facilities at the core of this business, has expanded and strengthened its production capacity since commencing operations in October 2012. The Company now plans to build a new plant on land adjacent to the existing facility to expand production capacity and meet rising demand for its core products, including Osaka Ohsho Hanetsuki Gyoza and Osaka Ohsho Purumochi Suigyoza. It will also actively use AI and robotics to reduce labor requirements, pursue greater efficiency and productivity than at its existing plants, and introduce new technologies that will support future growth, while pursuing higher quality and safety alongside low-cost operations.」
The Company presented a specific investment plan to build a new plant adjacent to the Kanto Plant, reduce labor requirements through AI and robotics, improve productivity, and achieve both high quality and safety and low-cost operations. - FY2018-Q3AdvancedAnnual report
「Cash used in investing activities was ¥915 million, compared with ¥969 million of expenditure in the same quarter of the previous year. This was primarily due to higher expenditure on the acquisition of property, plant and equipment.」
Spent ¥915.626 million on investing activities during the six months ended the second quarter, including the acquisition of property, plant and equipment. - FY2017AdvancedAnnual report
「During the fiscal year, the Company newly acquired machinery and equipment in connection with the expansion of freezing facilities at the Kanto Plant and opened 4 Osaka Ohsho stores, 5 Roast Beef Abura Soba Beast stores, 8 café-bakery format stores, and 2 other-format stores. Total capital expenditure in connection with these activities was ¥1,918 million.」
Expanded freezing facilities at the Kanto Plant and opened a total of 19 new stores. Total capital expenditure was ¥1,918 million. - FY2016First statedAnnual report
「During the fiscal year, the Company newly acquired machinery and equipment in connection with the expansion of freezing facilities at the Kanto Plant and opened 4 Osaka Ohsho stores, 2 Taiyo no Tomato Men stores, 1 new-format ramen store, and 9 other new-format stores. Total capital expenditure in connection with these activities was ¥1,274 million.」
Reported the expansion of freezing facilities at the Kanto Plant, new store openings, and total capital expenditure during the fiscal year.