- FY2017-Q3AchievedAnnual report
「Koga No. 2 Plant (Koga, Fukuoka Prefecture): building renovation, production-equipment expansion and relocation of the frozen-food production line from the Koga No. 1 Plant (Food Business); total planned investment: changed from ¥110.3 million to ¥198.79 million; work to start in September 2016 and be completed in December 2016; production capacity for retort products to increase by approximately 70%」
Renovation and equipment expansion at the Koga No. 2 Plant were scheduled for completion in December 2016, with retort-product production capacity indicated to increase by approximately 70%. - FY2017-Q2AdvancedAnnual report
「Koga No. 2 Plant (Koga, Fukuoka Prefecture): building renovation, production-equipment expansion and relocation of the frozen-food production line from the Koga No. 1 Plant (Food Business); total planned investment: changed from ¥110.3 million to ¥198.79 million; work to start in September 2016 and be completed in December 2016; production capacity for retort products to increase by approximately 70%」
The company changed the planned investment for equipment at the Koga No. 2 Plant from ¥110.3 million to ¥198.79 million, specified completion in December 2016, and indicated an approximately 70% increase in retort-product production capacity. - FY2017-Q1AdvancedAnnual report
「In April 2016, the new dressing production line commenced operations, substantially increasing production capacity.」
Concrete progress was reported on the Koga plant expansion, renovation and production-line expansion plan through the launch of the new production line. This filing does not specify the actual figure for the doubling of production capacity. - FY2016First statedAnnual report
「Koga No. 1 Plant (Koga, Fukuoka Prefecture): building expansion and renovation, production-line expansion; start and scheduled completion: July 2015 and August 2016; additional capacity after completion: production capacity for the core 280 ml product will be double the current level」
The company specified that expansion and renovation work and production-line expansion at the Koga No. 1 Plant were scheduled for completion in August 2016, with production capacity to double.