SBS Holdings (2384) · InitiativeAdvanced

Major expansion of logistics hubs and facilities, followed by stabilization and efficiency improvements

First written in FY2016-Q2. 23 of 28 entries say "Advanced", first in FY2016-Q3. Latest entry: 2026-09-16.

28entries
11years
0from disclosures
Share on X
How it moved
ProgressHeldSoftenedWorseAdvancedFY2016-Q3 – FY2020-Q1AdvancedFY2020-Q3 – FY2021OtherFY2022-Q1 – FY2023-Q1AdvancedFY2023 – 2026-09-162016: 220162017: 420172018: 420182019: 320192020: 420202021: 220212022: 320222023: 120232024: 220242025: 120252026: 22026
Same theme, other companies
Investment in Inventory-Holding Branches and Strengthening the Nationwide Logistics NetworkA theme 39 companies write about · 0 as a headwind · 44 as a tailwind

27 other companies' latest entry also says "Advanced".

Ridges = years it wrote progress, valleys = years it wrote worse. Most hopeful companies at the back. Drag to turn, scroll to zoom, right-drag to pan. On a phone, two fingers turn and pinch to zoom; one finger scrolls the page.
Showing 14 of the 39 companies compared. The sentences above are computed from all 39.
Full recordFilings, disclosures and news, newest first
  1. 2026-09-16Advancedmf-p.jp

    「SBSホールディングス㈱(SBSHD)は9月14日、千葉県富里市に開発を進めていた「富里物流センター」が完成し、竣工式を執り行った。」

    富里物流センターの完成・竣工式開催により、物流拠点の大規模拡充が開設完了段階へ進んだ。
  2. FY2025AdvancedAnnual report

    「In the logistics business, we invested a total of ¥12,957 million in expanding logistics facilities, routine vehicle replacements, and other items.」

    The group invested ¥12,957 million in expanding logistics facilities and replacing vehicles. The capital expenditure figure was updated, while the filing stated that there were no plans for major new facilities at fiscal year-end.
  3. FY2024AdvancedAnnual report

    「In addition to acquiring 3PL and 4PL business in our core logistics operations, we began the full-scale rollout of the one-stop EC platform service “EC Logistics Omakase-kun” and established large logistics centers equipped to handle EC logistics in both the Kanto and Kansai regions, building a structure capable of meeting the EC logistics needs of a broad range of customers. Through the active development of these new hubs, the group’s managed floor area exceeded 1 million tsubo for the first time during the consolidated fiscal year.」

    Large logistics centers for EC logistics were opened in the Kanto and Kansai regions, and the group’s managed floor area exceeded 1 million tsubo for the first time. The expansion of logistics facilities reached a concrete scale milestone.
  4. FY2024-Q1AdvancedAnnual report

    「Against this backdrop, our group took proactive steps to acquire 3PL and 4PL business in its core logistics operations and to fully roll out the one-stop EC platform service “EC Logistics Omakase-kun,” including opening the group’s largest logistics center in Chiba Prefecture.」

    The group opened its largest logistics center in Chiba Prefecture, moving logistics infrastructure expansion from the planning and preparation stage to the opening stage.
  5. FY2023AdvancedAnnual report

    「In the logistics business, we invested a total of ¥9,394 million in the acquisition and construction of logistics facility sites, routine vehicle replacements, and other items.」

    The group invested ¥9,394 million in logistics facility site acquisitions, construction, and vehicle replacements. The full-year capital expenditure figure was updated, while the filing stated that there were no plans for major new capital expenditures at the end of the consolidated fiscal year.
  6. FY2023-Q1Update to construction in progressAnnual report

    「Construction in progress 1,575 1,885」

    Construction in progress increased from ¥1,575 million at the end of December 2022 to ¥1,885 million at the end of March 2023, updating the balance of construction investment in logistics facilities and other assets.
  7. FY2022-Q2Update to construction in progressAnnual report

    「Construction in progress 1,335 971」

    Construction in progress decreased from ¥1,335 million at the end of the previous consolidated fiscal year to ¥971 million at the end of the second quarter.
  8. FY2022-Q1Update to construction in progressAnnual report

    「Construction in progress 1,335 3,841」

    Construction in progress related to logistics facilities and other assets increased from ¥1,335 million at the end of the previous consolidated fiscal year to ¥3,841 million at the end of the first quarter.
  9. FY2021AdvancedAnnual report

    「In the logistics business, we invested a total of ¥12,544 million in the acquisition and construction of logistics facility sites, routine vehicle replacements, and other items.」

    The group disclosed an investment of ¥12,544 million in logistics facility site acquisitions, construction, and other items, updating its investment track record for expanding logistics infrastructure.
  10. FY2021-Q1AdvancedAnnual report

    「Toyo Unyu Soko Co., Ltd. owns large warehouses in Higashi-Ohgishima in Kawasaki, Kanagawa Prefecture, and Wakasu in Koto Ward, Tokyo, both in the Tokyo waterfront area. By integrating these facilities with our group’s existing warehouses in the area, we believe we can develop warehouses from a long-term perspective, maximize the potential of the group’s logistics infrastructure in the area, and approach new customer segments.」

    The group’s direction for facility integration and development became more concrete: integrate Toyo Unyu Soko’s large warehouses with existing facilities, maximize logistics infrastructure in the Tokyo waterfront area, and approach new customer segments.
  11. FY2020AdvancedAnnual report

    「Total capital expenditures and other investments during the consolidated fiscal year amounted to ¥11,507 million, of which ¥10,971 million was invested in the logistics business, including the acquisition and construction of logistics facility sites and routine vehicle replacements.」

    The group invested ¥10,971 million in logistics facility site acquisitions, construction, and other items. The planned total investment in the Yokohama Kanazawa Logistics Center was ¥7,839 million, with completion scheduled for July 2021.
  12. FY2020-Q3AdvancedAnnual report

    「While inventories decreased as a result of the sale of the Nagatsuta Logistics Center, cash and deposits increased, as did construction in progress in connection with construction and other work at the Yokohama Kanazawa Logistics Center.」

    Construction in progress related to construction and other work at the Yokohama Kanazawa Logistics Center increased from ¥2,106 million at the end of the previous consolidated fiscal year to ¥5,277 million, confirming progress in construction investment through the financial figures.
  13. FY2020-Q2Update to construction in progress related to logistics facility constructionAnnual report

    「While inventories decreased as a result of the sale of the Nagatsuta Logistics Center, cash and deposits increased, as did construction in progress in connection with construction and other work at the Yokohama Kanazawa Logistics Center.」

    The increase in construction in progress related to construction of the Yokohama Kanazawa Logistics Center was reported again, indicating that construction investment continued.
  14. FY2020-Q1AdvancedAnnual report

    「While inventories decreased as a result of the sale of the Nagatsuta Logistics Center, construction in progress increased in connection with construction of the Yokohama Kanazawa Logistics Center, and cash and deposits also increased.」

    The filing reported an increase in construction in progress related to the Yokohama Kanazawa Logistics Center, indicating that construction investment was advancing.
  15. FY2019AdvancedAnnual report

    「The contribution of the multi-tenant Nanko Logistics Center, a large warehouse in Suminoe Ward, Osaka, with a total floor area of approximately 18,540 tsubo, which began operations in March, was also added. These factors absorbed higher costs, including those caused by the chronic labor shortage. The site for the group’s largest planned logistics center in Seto, Noda, Chiba, has completed land preparation and is ready for construction to begin.」

    The Nanko Logistics Center contributed to full-year earnings, while the group’s largest planned logistics center in Noda progressed through completion of site preparation and readiness to begin construction.
  16. FY2019-Q3AdvancedAnnual report

    「The multi-tenant Nanko Logistics Center, a large warehouse in Suminoe Ward, Osaka, with a total floor area of 18,540 tsubo, began operating in March and is performing smoothly, with almost all space leased, contributing to earnings.」

    After beginning operations, the Nanko Logistics Center became almost fully leased and made an increasing contribution to earnings, demonstrating concrete progress in stable operations and monetization.
  17. FY2019-Q2AdvancedAnnual report

    「The multi-tenant Nanko Logistics Center in Suminoe Ward, Osaka, with a total floor area of 18,540 tsubo, was completed in March and has begun operations. For the Group’s largest logistics center planned in Seto, Noda, Chiba, site preparation has been completed and preparations to begin construction are expected to be ready during the current fiscal year.」

    The Nanko Logistics Center was completed and began operations. The largest-scale logistics center in Noda progressed from completed site preparation to the stage where preparations to begin construction were expected to be completed during the fiscal year.
  18. FY2019-Q1AdvancedAnnual report

    「During the first quarter, the multi-tenant Nanko Logistics Center in Suminoe Ward, Osaka, with a total floor area of 18,540 tsubo, was completed in March.」

    The Osaka Nanko Logistics Center was completed in March, moving from construction to completion. Its total floor area was disclosed as 18,540 tsubo.
  19. FY2018-Q3AdvancedAnnual report

    「Under our investment strategy, we acquired shares in RICOH Logistics in August with the aim of strengthening production logistics, the nationwide delivery network, LT (Logistics Technology), and overseas operations, making the company a consolidated subsidiary. In logistics facility development, a three-temperature-zone logistics facility in Ami was completed in May, followed in June by the acquisition of a 35,000-tsubo logistics facility site in Seto, Noda, Chiba, where site preparation began. In Nanko, Suminoe Ward, Osaka, construction continued on a logistics facility with a total floor area of approximately 18,000 tsubo toward completion in March 2019, as the Group worked to strengthen infrastructure for its growing 3PL business.」

    The Ami facility was completed, site preparation began on the 35,000-tsubo Noda site, and construction continued at Osaka Nanko toward completion in March 2019.
  20. FY2018-Q2AdvancedAnnual report

    「Under our investment strategy, the three-temperature-zone logistics facility in Ami, Inashiki District, Ibaraki Prefecture, with a total floor area of approximately 3,000 tsubo, was completed in May and began operating as a 3PL hub for food logistics. Construction is progressing smoothly at the Osaka Nanko Logistics Center in Nanko, Suminoe Ward, Osaka, where construction began last December, with a total floor area of approximately 18,000 tsubo and scheduled completion in March 2019. We also acquired a 35,000-tsubo site for a logistics facility in Seto, Noda, Chiba, the largest-scale logistics facility site in the Group.」

    The three-temperature-zone facility in Ami was completed and began operations as a food-logistics 3PL hub. Construction continued at Osaka Nanko, and the Group acquired a 35,000-tsubo site in Noda, its largest logistics facility site.
  21. FY2018-Q1AdvancedAnnual report

    「Under our investment strategy, we continued construction of the three-temperature-zone logistics facility in Ami, Inashiki District, Ibaraki Prefecture, which began last year, with a total floor area of approximately 3,000 tsubo and scheduled completion in May 2018, as well as the tentatively named Osaka Nanko Logistics Center in Nanko, Suminoe Ward, Osaka, with a total floor area of approximately 18,000 tsubo and scheduled completion in March 2019. We also leased warehouses totaling 11,000 tsubo in Iwatsuki and Iruma, Saitama, and prepared to open new hubs.」

    Construction continued at the Ami and Osaka Nanko facilities, while warehouses totaling 11,000 tsubo were leased in Iwatsuki and Iruma in preparation for opening new hubs.
  22. FY2017AdvancedAnnual report

    「Under our investment strategy, construction began in April on a three-temperature-zone logistics facility in Ami, Inashiki District, Ibaraki Prefecture, with a total floor area of approximately 3,000 tsubo and scheduled completion in April 2018. In December, construction also began on the tentatively named Osaka Nanko Logistics Center in Suminoe Ward, Osaka, with a total floor area of approximately 18,000 tsubo and scheduled completion in January 2019.」

    Construction began on the Ami logistics facility and the Osaka Nanko Logistics Center. The facility sizes and scheduled completion dates were disclosed, marking progress from preparation and construction planning in the previous quarter.
  23. FY2017-Q3AdvancedAnnual report

    「Under our investment strategy, we advanced construction of a three-temperature-zone logistics center in Ami, Inashiki District, Ibaraki Prefecture, where construction began in April. The facility has a total floor area of approximately 3,000 tsubo and is scheduled for completion in April 2018. We also prepared to commence construction of the tentatively named Osaka Nanko Logistics Center in Suminoe Ward, Osaka, with a total floor area of approximately 15,000 tsubo and scheduled completion in January 2019.」

    The three-temperature-zone logistics center in Ami progressed to the construction phase, while preparations continued to begin construction of the Osaka Nanko Logistics Center. The facility sizes and scheduled completion dates were also disclosed.
  24. FY2017-Q2AdvancedAnnual report

    「Under our business strategy, we focused on stabilizing and improving the efficiency of logistics hubs totaling 50,000 tsubo that were launched in the previous fiscal year, while launching new 3PL hubs for apparel companies, importers and sellers of alcoholic beverages and food products, and pet food manufacturers and distributors.」

    The Group continued stabilizing and improving the efficiency of logistics hubs totaling 50,000 tsubo launched in the previous fiscal year, while opening new 3PL hubs for apparel, imported alcoholic beverages and food products, and pet food manufacturing and distribution.
  25. FY2017-Q1AdvancedAnnual report

    「Under our investment strategy, we prepared to commence construction of a three-temperature-zone logistics facility on a 9,500-tsubo site in Ami, Inashiki District, Ibaraki Prefecture, and began negotiations with prospective buyers regarding several logistics facilities scheduled for sale during the fiscal year.」

    In addition to stabilizing and expanding existing logistics hubs, preparations advanced toward starting construction of a three-temperature-zone facility on a 9,500-tsubo site in Ami.
  26. FY2016AdvancedAnnual report

    「Under our business strategy, we launched 3PL projects commissioned by department stores, major supermarkets and drugstores at logistics hubs totaling 50,000 tsubo that were completed or leased during the fiscal year, and expanded operations beyond the Kanto region into Kansai. Under our investment strategy, a multi-tenant logistics center with a total floor area of 12,000 tsubo was completed in Isogo Ward, Yokohama, in February, followed in March by a dedicated logistics facility for a major department store in Tokorozawa, Saitama, with a total floor area of 9,000 tsubo, and in October by a three-temperature-zone logistics facility with a total floor area of 2,000 tsubo in Miyagino Ward, Sendai.」

    The Group launched 3PL projects for department stores, major supermarkets and drugstores at logistics hubs totaling 50,000 tsubo and expanded into Kansai. Facilities in Yokohama, Tokorozawa and Sendai were completed.
  27. FY2016-Q3AdvancedAnnual report

    「Under our business strategy, we consistently worked to launch, consolidate and transfer certain operations involving logistics hubs totaling 50,000 tsubo, the largest scale in the Group’s history. The program progressed largely as planned and the hubs have been moving toward stable operation. Under our investment strategy, the Shin-Sugita Logistics Center, a multi-tenant facility with a total floor area of 12,000 tsubo, was completed in Isogo Ward, Yokohama, in February, followed in March by the Tokorozawa Logistics Center, a dedicated facility for a major department store in Tokorozawa, Saitama, with a total floor area of 9,000 tsubo. Both began operations as part of the 50,000-tsubo logistics hub network. The refrigerated and frozen warehouse acquired in May in Miyagino Ward, Sendai, with a total floor area of 2,000 tsubo, was renovated toward completion in October.」

    The launch of logistics hubs totaling 50,000 tsubo progressed largely as planned and was moving toward stable operations. The Shin-Sugita and Tokorozawa facilities began operations, while renovation of the refrigerated and frozen warehouse in Sendai continued toward completion in October.
  28. FY2016-Q2First statedAnnual report

    「In the first half, we focused on launching logistics hubs with a total area of 50,000 tsubo, the largest scale in the Group’s history. SBS Logicom, which was central to this initiative, established 9 new logistics hubs and also worked on consolidating existing hubs and transferring certain operations. The launches were completed largely as planned, and we will now work to achieve stable operations and greater efficiency as soon as possible. In February, a multi-tenant logistics center with a total floor area of 12,000 tsubo was completed in Isogo Ward, Yokohama, followed in March by a dedicated logistics facility for a major department store in Tokorozawa, Saitama, with a total floor area of 9,000 tsubo.」

    The filing reports the launch of hubs totaling 50,000 tsubo and 9 locations, as well as the completion of logistics facilities in Yokohama and Tokorozawa. The launches were completed largely as planned, with stable operations and efficiency improvements identified as the next priorities.
Moved together

"Recovery of Investment Funds and Balance-Sheet Improvement Through the Sale of the Kawagoe Logistics Center" moved the same way as this thread, in the same document, in 11 of its 28 moves.

111010776★123456
  1. ★This thread
  2. 1Recovery of Investment Funds and Balance-Sheet Improvement Through the Sale of the Kawagoe Logistics Center11×
  3. 2Expanding business scale and entering new fields through M&A, equity investments and capital alliances10×
  4. 3Dividends on Common Shares10×
  5. 4Selective review of overseas operations and rebuilding of the overseas platform7×
  6. 5Recruiting and developing personnel to support 3PL and overseas expansion, and establishing HR systems7×
  7. 6Strengthening the SBS brand and expanding new sales contracts6×