Substantial increase in construction orders driven by large domestic and overseas projects

First written in FY2018. 4 of 19 entries say "Advanced", first in FY2023. Latest entry: 2026-11-09.

19entries
9years
2from disclosures
Share on X
How it moved
ProgressHeldSoftenedWorseOtherFY2018 – FY2023-Q2OtherFY2024-Q3AdvancedFY2025 – FY20262018: 120182019: 420192020: 420202021: 120212022: 220222023: 120232024: 120242025: 220252026: 32026
Same theme, other companies
Expansion in construction ordersA theme 43 companies write about · 2 as a headwind · 42 as a tailwind

The whole theme swung hardest in 2020: 5 of 33 companies on the "Worse" side.

7 other companies' latest entry also says "Other".

Ridges = years it wrote progress, valleys = years it wrote worse. Most hopeful companies at the back. Drag to turn, scroll to zoom, right-drag to pan. On a phone, two fingers turn and pinch to zoom; one finger scrolls the page.
Showing 14 of the 43 companies compared. The sentences above are computed from all 43.
Full recordFilings, disclosures and news, newest first
  1. FY2026AdvancedAnnual report

    「Orders received during the consolidated fiscal year totaled ¥340,623 million in domestic civil engineering, ¥338,862 million in domestic building and ¥211,907 million in overseas construction, for a total of ¥891,393 million, up 29.9% from the previous consolidated fiscal year.」

    Construction orders received increased to ¥891,393 million, driven by large-project wins in domestic civil engineering, domestic building and overseas construction.
  2. FY2026-H1AdvancedAnnual report

    「The Company's standalone orders received increased by ¥52.9 billion from the same period of the previous year to ¥125.8 billion, up 72.5%, supported by strong orders for government works and large private-sector projects related to CN. The Company's standalone orders received increased by ¥18.1 billion from the same period of the previous year to ¥157.1 billion, up 13.0%, due to orders for large projects including logistics warehouses. The Company's standalone orders received increased by ¥160.0 billion from the same period of the previous year to ¥176.7 billion, up 957.4%, following orders in Singapore during the first quarter for the Terminal 5 terminal connection tunnel at Changi Airport and the Tuas northern reclamation project, and in Hong Kong during the second quarter for the road and station construction project for automated people movers at Hong Kong International Airport.」

    In the first half of fiscal 2025, the Company won large projects in each of its domestic civil engineering, domestic building and overseas construction businesses. Overseas construction orders in particular increased 957.4% year on year.
  3. FY2025AdvancedAnnual report

    「Construction orders received by the Group during the consolidated fiscal year totaled ¥686,318 million, up 11.5% from the previous consolidated fiscal year, driven by large-project wins in domestic civil engineering, domestic building and overseas construction.」

    Construction orders for the full fiscal year increased to ¥686,318 million, driven by large-project wins in domestic civil engineering, domestic building and overseas construction.
  4. FY2024-Q3Updated for cumulative third-quarter fiscal 2023 construction ordersAnnual report

    「The company's individual orders decreased by ¥23.5 billion from the same quarter of the previous year to ¥181.3 billion, or down 11.5%, because it received large port and offshore wind construction projects, among others, in the previous fiscal year. The company's individual orders increased by ¥10.9 billion to ¥172.4 billion, or up 6.7%, due mainly to multiple large government and private-sector projects. The company's individual orders decreased by ¥83.5 billion to ¥34.0 billion, or down 71.1%, because it received no large projects.」

    For the nine months ended 31 December 2023, domestic civil engineering orders declined due to the reaction to the previous year's large projects, while domestic building orders increased on multiple large-project wins. Overseas construction orders declined 71.1% year on year due to the absence of large-project wins.
  5. FY2023AdvancedAnnual report

    「The Group's construction orders for the fiscal year totaled ¥688,951 million, up 73.3% from the previous fiscal year, driven by large projects received in the domestic civil engineering, domestic building, and overseas construction businesses.」

    The domestic civil engineering, domestic building, and overseas construction businesses each received large projects, increasing construction orders 73.3% year on year to ¥688.951 billion.
  6. FY2023-Q2Updated for first-half fiscal 2022 construction ordersAnnual report

    「The company's individual orders increased by ¥49.1 billion from the same quarter of the previous year to ¥128.6 billion, driven by orders for a large port project, one of the largest in Japan. Domestic building orders increased by ¥46.1 billion to ¥121.5 billion, driven by orders for a redevelopment project, one of the largest in Japan. Overseas construction orders increased by ¥77.0 billion to ¥87.1 billion, driven by a large building project received in Singapore.」

    In the first half of fiscal 2022, each of the domestic civil engineering, domestic building, and overseas construction businesses received large projects, and orders in each business exceeded the same period of the previous year.
  7. FY2022Updated for fiscal 2021 full-year construction ordersAnnual report

    「The Group's construction orders for the fiscal year totaled ¥397.7 billion, mainly because it received only 1 large overseas project.」

    Updated to ¥179.4 billion in domestic civil engineering, ¥162.2 billion in domestic building, ¥56.0 billion overseas, and ¥397.7 billion in total, a substantial decrease from the previous fiscal year.
  8. FY2021-Q3Updated for cumulative third-quarter individual construction ordersAnnual report

    「Individual construction orders through the quarter increased 27.6% year on year to ¥335.4 billion, driven mainly by multiple large building projects received in Singapore.」

    Cumulative third-quarter fiscal 2020 individual construction orders totaled ¥335.4 billion, up 27.6% year on year due mainly to multiple large building projects received in Singapore.
  9. FY2021-Q2Updated for first-half fiscal 2020 orders and the full-year outlookAnnual report

    「Individual construction orders increased 7.4% year on year to ¥181.9 billion, driven mainly by a large project received in Singapore. The full-year outlook remains unchanged from the forecast announced on 11 May 2020, with ¥200.0 billion in domestic civil engineering, ¥180.0 billion in domestic building, ¥175.0 billion overseas, and ¥555.0 billion in total.」

    First-half fiscal 2020 individual construction orders increased 7.4% year on year to ¥181.9 billion, while the full-year outlook remains unchanged at ¥555.0 billion in total.
  10. FY2021-Q1Updated for the fiscal 2020 construction order outlookAnnual report

    「Individual construction orders increased 37.8% year on year to ¥97.6 billion. The full-year outlook remains unchanged from the forecast announced on 11 May 2020, with ¥200.0 billion in domestic civil engineering, ¥180.0 billion in domestic building, ¥175.0 billion overseas, and ¥555.0 billion in total.」

    First-quarter fiscal 2021 individual construction orders totaled ¥97.6 billion, while the full-year outlook remains unchanged at ¥200.0 billion in domestic civil engineering, ¥180.0 billion in domestic building, ¥175.0 billion overseas, and ¥555.0 billion in total.
  11. FY2020Updated full-year construction ordersAnnual report

    「The Group's construction orders for the fiscal year totaled ¥458.5 billion, down ¥70.1 billion, or 13.3%, from the previous fiscal year, which included multiple large overseas projects. Domestic orders increased for both government and private-sector projects on the back of high public investment, including national resilience measures, while overseas orders included a large port project in Madagascar.」

    Full-year construction orders totaled ¥458.5 billion, down due to the reaction to the large overseas orders received in the previous year. The disclosure also covers domestic government and private-sector projects and a large port project in Madagascar.
  12. FY2020-Q3Updated from first-half fiscal 2019 to cumulative third-quarter construction ordersAnnual report

    「Individual construction orders through the quarter totaled ¥262.9 billion, down 31.2% year on year, as solid domestic orders were more than offset by the impact of multiple large overseas orders received in the same quarter of the previous year.」

    Cumulative third-quarter individual construction orders totaled ¥262.9 billion, down 31.2% year on year due to the reaction to large overseas orders received in the same period of the previous year, despite solid domestic orders.
  13. FY2020-Q2Updated for first-half fiscal 2019 construction orders and the full-year outlookAnnual report

    「Individual construction orders decreased 39.9% year on year to ¥169.4 billion, as the company received multiple large domestic building and overseas construction orders in the same quarter of the previous year. The full-year outlook remains unchanged from the forecast announced on 10 May 2019, with ¥180.0 billion in domestic civil engineering, ¥170.0 billion in domestic building, ¥150.0 billion overseas, and ¥500.0 billion in total.」

    Individual construction orders through the first half of fiscal 2019 totaled ¥169.4 billion, down 39.9% year on year, while the full-year order outlook remains unchanged at ¥180.0 billion in domestic civil engineering, ¥170.0 billion in domestic building, ¥150.0 billion overseas, and ¥500.0 billion in total.
  14. FY2020-Q1Updated for the fiscal 2019 construction order outlookAnnual report

    「Individual construction orders decreased 48.4% year on year to ¥70.8 billion. The full-year outlook remains unchanged from the forecast announced on 10 May 2019, with ¥180.0 billion in domestic civil engineering, ¥170.0 billion in domestic building, ¥150.0 billion overseas, and ¥500.0 billion in total.」

    The disclosure reports individual construction orders through the first quarter of fiscal 2019 and an unchanged full-year order plan from the forecast announced on 10 May 2019.
  15. FY2019Updated full-year construction ordersAnnual report

    「The Group's construction orders for the fiscal year totaled ¥528.6 billion, down ¥155.3 billion, or 22.7%, from the previous fiscal year, which included the largest-ever large-scale projects. The decline was partly offset by orders for large land-based construction and logistics facilities in Japan, large civil engineering projects in Singapore and Indonesia, and multiple large building projects in Hong Kong.」

    Full-year construction orders, including large domestic and overseas projects, totaled ¥528.6 billion, down 22.7% due to the reaction to the large orders received in the previous fiscal year.
  16. FY2019-Q3Updated from fiscal 2018 full-year results to the fiscal 2019 full-year order outlookAnnual report

    「Individual construction orders through the quarter totaled ¥382.0 billion, down 16.0% year on year, because the company received large domestic building and overseas construction orders in the same quarter of the previous year. The full-year outlook calls for ¥170.0 billion in domestic civil engineering, ¥170.0 billion in domestic building, ¥150.0 billion overseas, and ¥490.0 billion in total.」

    Individual construction orders through the third quarter totaled ¥382.0 billion, down 16.0% year on year. Full-year orders are expected to total ¥170.0 billion in domestic civil engineering, ¥170.0 billion in domestic building, ¥150.0 billion overseas, and ¥490.0 billion in total.
  17. FY2018First statedAnnual report

    「Against this backdrop, the Group's construction orders for the fiscal year increased by ¥203,287 million, or 42.3%, from the previous fiscal year to ¥683,845 million, driven by multiple large orders in Japan, including major infrastructure projects for the Tokyo Olympic and Paralympic Games and commercial facilities near stations, as well as multiple large-scale civil engineering projects in Bangladesh and Singapore.」

    Construction orders increased 42.3% year on year to ¥683,845 million, driven by large domestic and overseas projects.
Moved together

"Capital investment in construction machinery, work vessels and other equipment to improve construction capabilities" moved the same way as this thread, in the same document, in 4 of its 19 moves.

443333★123456
  1. ★This thread
  2. 1Capital investment in construction machinery, work vessels and other equipment to improve construction capabilities4×
  3. 2Capital expenditures, research and development investment, and work-style reform investment for fiscal 2020–20224×
  4. 3Domestic Construction Business: Declining Revenue and Higher Profit3×
  5. 4Stable dividend policy targeting a consolidated dividend payout ratio of 20–25%3×
  6. 53-Year Medium-Term Management Plan and the Planning, Execution and Verification Cycle3×
  7. 6Securing Diverse Talent3×

★ is this thread; numbers match the list above. The number on a line is how many documents both moved the same way in; lines between the other threads count the documents they moved together in too. Threads that move together often sit closer.

When this could move next
No upcoming earnings preview for Penta-Ocean Construction yet. It last moved in the Results of 2026-11-09: "Other".
News
No news is linked to this thread yet. When an article touches it, it will appear here by date.