Penta-Ocean Construction (1893) · InitiativeUpdated for capital expenditure execution in the first half of fiscal 2026.

Capital investment in construction machinery, work vessels and other equipment to improve construction capabilities

First written in FY2017. 9 of 13 entries say "Advanced", first in FY2018. Latest entry: 2026-11-09.

13entries
10years
2from disclosures
Share on X
How it moved
ProgressHeldSoftenedWorseAdvancedFY2018 – FY2019OtherFY2020 – FY2022AdvancedFY2023-Q2 – FY20262017: 120172018: 120182019: 120192020: 120202021: 020212022: 220222023: 120232024: 020242025: 220252026: 42026
Same theme, other companies
Capital investment to improve the working environment, safety and operational efficiencyA theme 13 companies write about · 0 as a headwind · 13 as a tailwind

6 other companies' latest entry also says "Advanced".

Ridges = years it wrote progress, valleys = years it wrote worse. Most hopeful companies at the back. Drag to turn, scroll to zoom, right-drag to pan. On a phone, two fingers turn and pinch to zoom; one finger scrolls the page.
Full recordFilings, disclosures and news, newest first
  1. 2026-11-09AdvancedResults

    「また、投資活動によるキャッシュ・フローは、大型基礎施工船等の建造による支出などにより、111億円の支出超過となりました。」

    大型基礎施工船等の建造に伴う設備投資を継続している。
  2. FY2027-H1Updated for capital expenditure execution in the first half of fiscal 2026.Annual report

    「Cash flow from investing activities resulted in net outflows of ¥11.1 billion, compared with net outflows of ¥31.2 billion in the same period of the previous year, due to expenditures including the construction of large foundation installation vessels and other items.」

    Investing activities resulted in net outflows of ¥11.1 billion in the first half of fiscal 2026 due to the construction of large foundation installation vessels and other items.
  3. FY2026AdvancedAnnual report

    「The main capital investments during the fiscal year were investments in work vessels for offshore wind projects, as well as the construction and renewal of construction machinery and work vessels to improve construction capacity, totaling ¥84,362 million.」

    Capex has been updated to ¥84.362 billion, and investment in work vessels for offshore wind projects and other assets continued. The SEP-type multipurpose heavy-lift vessel that was being modified in the previous fiscal year has been completed.
  4. 2026-05-28AdvancedGeneral Meeting of Shareholders

    「当連結会計年度中に実施いたしました設備投資の総額は84,701百万円で、主なものは、船舶、機械、器具工具などの新設及び改造等によるものです。」

    設備投資総額84,701百万円を示し、洋上風力建設に必要な船舶への大型投資を実績として開示している。
  5. FY2026-H1AdvancedAnnual report

    「Cash flow from investing activities resulted in net expenditure of ¥31.2 billion, mainly due to expenditures related to the construction of work vessels for offshore wind projects, compared with net expenditure of ¥4.1 billion in the same period of the previous year.」

    Investing activities resulted in expenditures of ¥31.2 billion in the first half of fiscal 2025, mainly due to construction of work vessels for offshore wind projects, and the company reported the implementation of capital investments to improve construction capacity.
  6. FY2025AdvancedAnnual report

    「The main capital investments during the fiscal year were investments in work vessels for offshore wind projects, as well as the construction and renewal of construction machinery and work vessels to improve construction capacity, totaling ¥49,317 million.」

    Actual capex has been updated to ¥49.317 billion, with increased investment in work vessels for offshore wind projects, construction machinery and work vessels. Planned capex for the following 1 year is ¥89.759 billion.
  7. FY2023AdvancedAnnual report

    「The main capital investments during the fiscal year were investments in work vessels for offshore wind projects and construction of a new plant at the Muroran Works, totaling ¥9,740 million.」

    Capital investments, including offshore wind-related work vessels and the new plant at the Muroran Works, were made. Planned capex for the following 1 year is ¥32,529 million.
  8. FY2023-Q2AdvancedAnnual report

    「Cash flow from investing activities resulted in net expenditure of ¥8 billion, compared with net expenditure of ¥4.3 billion in the same quarter of the previous year, mainly due to capital investments including construction of a new plant at the Muroran Works for fabricating temporary steel structures for bridges and offshore wind projects, and maintenance and renewal of work vessels.」

    The company is proceeding with construction of a new plant at the Muroran Works for fabricating temporary steel structures for bridges and offshore wind projects, as well as maintenance and renewal of work vessels, as capital investments to improve construction capacity. Net expenditure on investing activities was ¥8 billion.
  9. FY2022Updated capital expenditure results and the following fiscal year’s planAnnual report

    「The main capital investments during the consolidated fiscal year consisted of new purchases and replacements of construction machinery, work vessels and other equipment to improve construction capabilities, totaling ¥7,941 million.」

    Capex for improving construction capacity has been updated to ¥7,941 million, and planned capex for the following 1 year is ¥14,770 million.
  10. FY2020Updated capital expenditure and the following fiscal year’s planAnnual report

    「The main capital investments during the consolidated fiscal year consisted of new purchases and replacements of construction machinery, work vessels and other equipment to improve construction capabilities, totaling ¥9,377 million.」

    The company updated capital investment for improving construction capabilities to ¥9,377 million and plans capital investments of ¥10,000 million over the following 1 year.
  11. FY2019AdvancedAnnual report

    「The main capital investments during the consolidated fiscal year consisted of new purchases and replacements of construction machinery, work vessels and other equipment to improve construction capabilities, totaling ¥9,683 million. The SEP-type multipurpose heavy-lift vessel that was under construction in the previous consolidated fiscal year was completed during the consolidated fiscal year.」

    The company made ¥9,683 million in capital investments to improve construction capabilities, and completed the SEP-type multipurpose heavy-lift vessel that had been under construction since the previous fiscal year.
  12. FY2018AdvancedAnnual report

    「The main capital investments during the consolidated fiscal year consisted of new purchases and replacements of construction machinery, work vessels and other equipment to improve construction capabilities, totaling ¥12,393 million.」

    Capital investment to improve construction capabilities increased from ¥8,841 million to ¥12,393 million, and construction of the SEP-type multipurpose heavy-lift vessel is also progressing.
  13. FY2017First statedAnnual report

    「The main capital investments during the consolidated fiscal year consisted of new purchases and replacements of construction machinery, work vessels and other equipment to improve construction capabilities, totaling ¥8,841 million.」

    The company invested ¥8,841 million in construction machinery, work vessels and other equipment to improve construction capabilities, and plans capital investments of ¥7,700 million over the following 1 year.
Moved together

"Stable dividend policy targeting a consolidated dividend payout ratio of 20–25%" moved the same way as this thread, in the same document, in 6 of its 13 moves.

665544★123456
  1. ★This thread
  2. 1Stable dividend policy targeting a consolidated dividend payout ratio of 20–25%6×
  3. 2Preparation for construction of offshore wind power facilities6×
  4. 3Reform of the Construction Production System and Promotion of ICT, BIM, CIM and Robotics5×
  5. 4Cross-Shareholdings Held to Maintain and Strengthen Business Relationships5×
  6. 5Domestic Construction Business: Declining Revenue and Higher Profit4×
  7. 6Substantial increase in construction orders driven by large domestic and overseas projects4×

★ is this thread; numbers match the list above. The number on a line is how many documents both moved the same way in; lines between the other threads count the documents they moved together in too. Threads that move together often sit closer.

When this could move next
No upcoming earnings preview for Penta-Ocean Construction yet. It last moved in the Results of 2026-11-09: "Advanced".
News
No news is linked to this thread yet. When an article touches it, it will appear here by date.