Komori
Penta-Ocean Construction (1893) · InitiativeAdvanced

Integrated Construction Management for Building Projects Using PiCOMS

First written in FY2020. 3 of 4 entries say "Advanced", first in FY2022. Latest entry: FY2026.

4entries
7years
0from disclosures
Share on X
How it moved
ProgressHeldSoftenedWorseFirst statedFY2020AdvancedFY2022 – FY20262020: 120202021: 020212022: 120222023: 120232024: 020242025: 020252026: 12026
Same theme, other companies
Improving Construction Productivity Through Structural Construction Methods, BIM, and PrefabricationA theme 14 companies write about · 0 as a headwind · 19 as a tailwind

The whole theme swung hardest in 2018: 1 of 7 companies on the "Worse" side.

4 other companies' latest entry also says "Advanced".

Ridges = years it wrote progress, valleys = years it wrote worse. Most hopeful companies at the back. Drag to turn, scroll to zoom, right-drag to pan. On a phone, two fingers turn and pinch to zoom; one finger scrolls the page.
Full recordFilings, disclosures and news, newest first
  1. FY2026AdvancedAnnual report

    「During the consolidated fiscal year, the company applied its proprietary BIM-based “Penta-Ocean Integrated Construction Management System PiCOMS” to 5 sites covering 9 buildings.」

    PiCOMS was applied to 5 sites and 9 buildings, and its productivity-enhancement effect in site management operations was confirmed.
  2. FY2023AdvancedAnnual report

    「During the consolidated fiscal year, as part of its use of iPads, the company developed “Degisite—Safety” to improve the efficiency of safety-document procedures, introduced it at more than 50 in-house sites, and confirmed its effectiveness.」

    The company expanded PiCOMS to demolition and earth-retaining work and introduced Degisite—Safety at more than 50 sites.
  3. FY2022AdvancedAnnual report

    「During the consolidated fiscal year, the system was introduced to 5 building projects, and its scope was expanded to precast exterior-wall and piling work. The company confirmed its productivity-enhancement effects through operation at each site.」

    PiCOMS was introduced to 5 building projects, and its scope was expanded to precast exterior-wall and piling work.
  4. FY2020First statedAnnual report

    「The company developed the “Penta-Ocean Integrated Construction Management System” (PiCOMS: Penta-ocean integrated COnstruction Management System) and introduced it as an ICT technology contributing to productivity improvement.」

    The company developed and introduced a construction management system that uses BIM models to share precast component manufacturing and installation information among relevant parties in real time.
Moved together

"Reform of the Construction Production System and Promotion of ICT, BIM, CIM and Robotics" moved the same way as this thread, in the same document, in 3 of its 4 moves.

333333★123456
  1. ★This thread
  2. 1Reform of the Construction Production System and Promotion of ICT, BIM, CIM and Robotics3×
  3. 2Validation of the practical utility of a remote-controlled boat system for port structure inspection and diagnosis3×
  4. 3Development of energy-saving technologies for conversion to ZEB3×
  5. 4Development of fiber-reinforced calcia-modified soil and expansion into port applications3×
  6. 5Preparation for construction of offshore wind power facilities3×
  7. 6Cross-Shareholdings Held to Maintain and Strengthen Business Relationships3×

★ is this thread; numbers match the list above. The number on a line is how many documents both moved the same way in; lines between the other threads count the documents they moved together in too. Threads that move together often sit closer.

When this could move next
No upcoming earnings preview for Penta-Ocean Construction yet.
News
No news is linked to this thread yet. When an article touches it, it will appear here by date.