Reform of the Construction Production System and Promotion of ICT, BIM, CIM and Robotics
First written in FY2017. 7 of 9 entries say "Advanced", first in FY2018. Latest entry: FY2026.
The whole theme swung hardest in 2025: 1 of 9 companies on the "Worse" side.
2 other companies' latest entry also says "Advanced".
- FY2026AdvancedAnnual report
「During the consolidated fiscal year, the company undertook more than 100 projects in the civil engineering field.」
The company continued to undertake more than 100 BIM/CIM projects and expanded the use of i-PentaCOL/3D, traceability for contaminated soil, new VR and AR content, and CDE. - FY2025AdvancedAnnual report
「During the consolidated fiscal year, the company undertook more than 100 projects in the civil engineering field.」
The number of BIM/CIM projects in the civil engineering field exceeded 100, and applications were expanded to i-PentaCOL/3D for land development projects, digital training and reductions in the working hours of partner companies. - FY2023AdvancedAnnual report
「During the consolidated fiscal year, the Company achieved approximately 100 civil engineering projects for the fifth consecutive year.」
The company achieved more than 100 BIM/CIM projects in the civil engineering field for the fifth consecutive year and expanded applications to 4D simulation, XR, safety training and visualization of construction machinery. - FY2022AdvancedAnnual report
「During the consolidated fiscal year, the company again achieved approximately 100 projects in the civil engineering field for the fourth consecutive year.」
The company achieved approximately 100 BIM/CIM projects in the civil engineering field for the fourth consecutive year and expanded applications to 4D simulation, XR, safety training, visualization of underground structures and interference checks. - FY2021-Q1RestatedAnnual report
「The company has promoted initiatives for contactless and remote operations through the use of ICT and maintained business continuity.」
The company is promoting contactless and remote operations using ICT as part of its business continuity efforts during infectious disease outbreaks. - FY2020AdvancedAnnual report
「During the consolidated fiscal year, the company continued to expand the types of construction and applications covered, undertaking approximately 100 CIM projects. These initiatives advanced collaboration between the domestic and international divisions in BIM/CIM and enabled the company to identify effective applications during the planning, design and construction stages.」
CIM has expanded to approximately 100 projects, while the company has extended collaboration between its domestic and international divisions, introduced ICT such as MR, VR, AI and drones to tunnel construction, and expanded the use of BIM in building construction. - FY2019AdvancedAnnual report
「During the consolidated fiscal year, the company further expanded the types of construction to which CIM was applied and extended its use to design and technical proposals, bringing the number of CIM implementations to approximately 100.」
The company expanded the types of construction to which CIM was applied and extended its use to design and technical proposals, bringing the number of implementations to approximately 100. Productivity improvement through ICT, BIM/CIM and other technologies has entered the expansion phase. - FY2018AdvancedAnnual report
「The introduction of CIM has improved the efficiency of interference checks, including the relative positions of structures, individual components and connections with temporary structures. It has also integrated ship placement plans, plans for bringing in materials and equipment, and other work plans into 3D models, enabling 4D simulations that reflect construction progress.」
The company has progressed from its previous policy of using ICT, BIM, CIM and robotics to the full-scale introduction of CIM for construction of the LNG base at Soma Port, achieving integrated 3D modeling and 4D simulation. - FY2017First statedAnnual report
「We will promote labor-saving, industrialized and robotic construction methods, information-based construction using ICT (Information and Communication Technology), BIM (Building Information Modeling) and CIM (Construction Information Modeling), thereby improving safety, quality and productivity.」
The company identifies labor saving, industrialization, robotics, ICT, BIM and CIM as specific measures to address the declining and aging labor force.