Penta-Ocean Construction (1893) · InitiativeAdvanced

Development of fiber-reinforced calcia-modified soil and expansion into port applications

First written in FY2018. 5 of 6 entries say "Advanced", first in FY2019. Latest entry: FY2026.

6entries
9years
0from disclosures
Share on X
How it moved
ProgressHeldSoftenedWorseAdvancedFY2019 – FY20262018: 120182019: 120192020: 120202021: 020212022: 120222023: 120232024: 020242025: 020252026: 12026
Same theme, other companies
Deployment of fiber-reinforced Calcia-modified soil for port and seaweed-bed creation applicationsA theme 1 companies write about · 0 as a headwind · 1 as a tailwind

No other company in this theme has enough history to compare yet.

Full recordFilings, disclosures and news, newest first
  1. FY2026AdvancedAnnual report

    「During the consolidated fiscal year, calcia-modified soil placed using a drop-mixing method was applied to a seaweed-bed creation project and a deep-dredging excavation backfill project. The Company gained experience in large-scale construction addressing the technical challenges of securing early strength for rapid creation and suppressing turbidity during backfilling.」

    For calcia-modified soil, development progressed from mixing buckets, tremie pipes and other equipment to large-scale construction for seaweed-bed creation and backfilling of deep-dredging excavations.
  2. FY2023AdvancedAnnual report

    「Five companies jointly developed a batch-type in-situ mixing method using calcia-modified soil to enable surface improvement of soft seabed ground.」

    For calcia-modified soil, development expanded beyond the use of mixing buckets and tremie pipes to a batch-type in-situ mixing method jointly developed by 5 companies.
  3. FY2022AdvancedAnnual report

    「During the consolidated fiscal year, calcia-modified soil was placed underwater using a newly developed tremie pipe in a shallow-water area creation project. The Company confirmed that rapid construction could be achieved while maintaining the quality of the calcia-modified soil and protecting the marine environment.」

    For calcia-modified soil, following the introduction of the mixing bucket at construction sites, underwater placement using a tremie pipe was achieved, confirming that quality, environmental protection and rapid construction could be achieved together.
  4. FY2020AdvancedAnnual report

    「During the consolidated fiscal year, with a view to promoting the use of calcia-modified soil in port areas, the Company worked on developing technologies for dewatering, mixing and placement to improve construction efficiency. It developed a mixing bucket that enables more effective mixing of dredged soil and calcia-modifying material and introduced it at an actual construction site.」

    For calcia-modified soil, the initiative progressed from developing mixing and placement technologies to introducing a mixing bucket at an actual construction site.
  5. FY2019AdvancedAnnual report

    「The Company is also developing efficient mixing methods and appropriate quality-control methods for calcia-modified soil, as well as high-performance calcia-modified soil technologies that can be applied to new uses through the addition of water-absorbing modifiers and short fibers.」

    For calcia-modified soil, the Company is advancing efficient mixing and quality control, along with performance enhancement using water-absorbing modifiers and short fibers and expansion into new applications.
  6. FY2018First statedAnnual report

    「The Company developed fiber-reinforced calcia-modified soil with greater toughness than conventional calcia-modified soil and obtained an evaluation certificate through the private-sector port technology verification and evaluation program conducted by the Coastal Development Institute of Technology.」

    The Company developed fiber-reinforced calcia-modified soil and obtained an evaluation certificate for private-sector port technology.
Moved together

"Reform of the Construction Production System and Promotion of ICT, BIM, CIM and Robotics" moved the same way as this thread, in the same document, in 5 of its 6 moves.

555554★123456
  1. ★This thread
  2. 1Reform of the Construction Production System and Promotion of ICT, BIM, CIM and Robotics5×
  3. 2Validation of the practical utility of a remote-controlled boat system for port structure inspection and diagnosis5×
  4. 3Development of energy-saving technologies for conversion to ZEB5×
  5. 4Preparation for construction of offshore wind power facilities5×
  6. 5Cross-Shareholdings Held to Maintain and Strengthen Business Relationships5×
  7. 6Stable dividend policy targeting a consolidated dividend payout ratio of 20–25%4×

★ is this thread; numbers match the list above. The number on a line is how many documents both moved the same way in; lines between the other threads count the documents they moved together in too. Threads that move together often sit closer.

When this could move next
No upcoming earnings preview for Penta-Ocean Construction yet.
News