Komori
Tanaken (1450) · InitiativeAdvanced

Improving Responsiveness to Customer Needs and Proposal Quality

First written in FY2019. 8 of 13 entries say "Advanced", first in FY2020. Latest entry: 2026-11-06.

13entries
8years
4from disclosures
Share on X
How it moved
ProgressHeldSoftenedWorseFirst statedFY2019AdvancedFY2020 – FY2021RestatedFY2022-Q2 – FY2023-Q1AdvancedFY2023 – 2026-11-062019: 120192020: 120202021: 220212022: 320222023: 120232024: 020242025: 120252026: 42026
Same theme, other companies
Proposals for New Facility Construction and Renovations Leveraging Design and Technical CapabilitiesA theme 5 companies write about · 0 as a headwind · 5 as a tailwind

2 other companies' latest entry also says "Advanced".

Ridges = years it wrote progress, valleys = years it wrote worse. Most hopeful companies at the back. Drag to turn, scroll to zoom, right-drag to pan. On a phone, two fingers turn and pinch to zoom; one finger scrolls the page.
Full recordFilings, disclosures and news, newest first
  1. FY2025AdvancedAnnual report

    「Through continued and expanded use of BIM (Note) three-dimensional models, we will improve drawing consistency and shorten working hours, work to enhance design and estimating productivity, and strengthen our proposal capabilities using three-dimensional documentation. In addition, by repeatedly conducting demonstration trials of new construction methods, including the canopy method for which we already have construction experience, we will focus on developing new methods that contribute to safe construction.」

    The Company will continue using BIM and strengthening its proposal capabilities through three-dimensional documentation, while continuing demonstration trials and development of new construction methods such as the canopy method.
  2. FY2023AdvancedAnnual report

    「Through continued and expanded use of BIM (Note) three-dimensional models, we will improve drawing consistency and shorten working hours, work to enhance design and estimating productivity, and strengthen our proposal capabilities using three-dimensional documentation. In addition, by repeatedly conducting demonstration trials of new construction methods, including the canopy method for which we already have construction experience, we will focus on developing new methods that contribute to safe construction.」

    In addition to continued use of BIM, the Company specifies demonstration trials and development of new construction methods, including the canopy method, as activities to strengthen the Technology Development Department.
  3. FY2023-Q1RestatedAnnual report

    「“Further strengthening the use of BIM three-dimensional models”」

    The Company restates greater use of BIM three-dimensional models as a key initiative for the third year of its medium-term plan. No new implementation or operating results are reported.
  4. FY2022RestatedAnnual report

    「Through continued and expanded use of BIM (Note) three-dimensional models, we will improve drawing consistency and shorten working hours, work to enhance design and estimating productivity, and strengthen our proposal capabilities using three-dimensional documentation.」

    The Company continues to pursue greater use of BIM three-dimensional models, shorter working hours, higher productivity and stronger proposal capabilities using three-dimensional documentation.
  5. FY2022-Q3RestatedAnnual report

    「“Further strengthening the use of BIM three-dimensional models”」

    The Company restates greater use of BIM three-dimensional models as a key initiative for the second year of the plan. No new implementation or operating results are reported.
  6. FY2022-Q2RestatedAnnual report

    「“Further strengthening the use of BIM three-dimensional models”」

    The Company restates greater use of BIM three-dimensional models as a key initiative for the second year of its medium-term plan. No new implementation or operating results are reported.
  7. FY2021AdvancedAnnual report

    「Through continued and expanded use of BIM (Note) three-dimensional models, we will improve drawing consistency and shorten working hours, work to enhance design and estimating productivity, and strengthen our proposal capabilities using three-dimensional documentation.」

    The Company is translating its previous 3D-CAD and construction-technology development initiatives into greater use of BIM three-dimensional models, shorter working hours and stronger proposal capabilities using three-dimensional documentation.
  8. FY2020AdvancedAnnual report

    「To make work more visible and improve accuracy through greater use of 3D-CAD (Note), and to strengthen the development of construction technologies, we will establish project teams that include partner companies, identify specific issues, select research themes and fully pursue the development of construction technologies.」

    The Company is translating its previous initiatives involving 3D-CAD and proposal-quality improvement into construction-technology development by project teams that include partner companies.
  9. FY2019First statedAnnual report

    「By enhancing proposals for customers and providing more comprehensive proposal-support materials, including easy-to-understand 3D-CAD (Note) drawings and estimates, as well as support tools and manuals, we will focus on standardizing and upgrading skills across the Company and work to improve customer satisfaction.」

    Describes initiatives to enhance sales representatives’ proposal capabilities and standardize their skills through improved 3D-CAD drawings, estimates, support tools and manuals.
Moved together

"Expanding orders from existing customers and into redevelopment and government construction projects" moved the same way as this thread, in the same document, in 8 of its 13 moves.

876665★123456
  1. ★This thread
  2. 1Expanding orders from existing customers and into redevelopment and government construction projects8×
  3. 2On-Site Safety and Security and IT-Enabled Visibility7×
  4. 3Hiring, Personnel Costs and System Investment for Business Expansion6×
  5. 4FY2020 First-Quarter Sales and Profit Results6×
  6. 5Increase in current assets primarily due to an increase in accounts receivable for completed construction work6×
  7. 6Business Expansion and Transition to the Next Stage under the Medium-Term Plan TANAKEN20205×

★ is this thread; numbers match the list above. The number on a line is how many documents both moved the same way in; lines between the other threads count the documents they moved together in too. Threads that move together often sit closer.

When this could move next
No upcoming earnings preview for Tanaken yet. It last moved in the Financial results presentation materials of 2026-11-06: "Advanced".
News
No news is linked to this thread yet. When an article touches it, it will appear here by date.