Development and Expansion of a Stable Natural Gas Supply Framework

First written in FY2016. 11 of 15 entries say "Advanced", first in FY2017-Q1. Latest entry: FY2026.

15entries
11years
0from disclosures
Share on X
How it moved
ProgressHeldSoftenedWorseAdvancedFY2017 – FY2018-Q3AdvancedFY2019-Q3 – FY2021AdvancedFY2022 – FY20262016: 320162017: 220172018: 220182019: 220192020: 120202021: 120212022: 220222023: 120232024: 020242025: 020252026: 12026
Same theme, other companies
ガス供給インフラの安全・安定供給維持投資A theme 6 companies write about · 0 as a headwind · 7 as a tailwind

The whole theme swung hardest in 2017: 1 of 6 companies on the "Worse" side.

3 other companies' latest entry also says "Advanced".

Ridges = years it wrote progress, valleys = years it wrote worse. Most hopeful companies at the back. Drag to turn, scroll to zoom, right-drag to pan. On a phone, two fingers turn and pinch to zoom; one finger scrolls the page.
Full recordFilings, disclosures and news, newest first
  1. FY2026AdvancedAnnual report

    「In its core gas business, the Group is developing and expanding a stable natural gas supply system and strengthening facilities that support the wider adoption of gas, while also renewing facilities required to advance its various businesses. In total, it made capital investments of ¥40.653 billion. In the gas business, it made capital investments of ¥29.206 billion, mainly for the development of supply facilities and measures addressing aging service and distribution mains. As of 31 March 2026, the end of the consolidated fiscal year, the total length of the Group’s service and distribution mains was 31,645 km.」

    Annual investment in stable supply facilities totaled ¥40.653 billion, including ¥29.206 billion in the gas business. The Group reported a service and distribution main network extending 31,645 km and progress in addressing aging mains.
  2. FY2024-Q1AdvancedAnnual report

    「The South Trunk Line and the Chita–Handa section, a transportation trunk line that had been under planning at the end of the previous consolidated fiscal year, was completed in June 2023.」

    The Minami Trunk Line and the Chita–Handa section of the trunk transportation pipeline related to the stable natural gas supply system were completed in June 2023.
  3. FY2022AdvancedAnnual report

    「In its core gas business, the Group is developing and expanding a stable natural gas supply system and strengthening facilities that support the wider adoption of gas, while also renewing facilities required to advance its various businesses. In total, it made capital investments of ¥39.032 billion. In the gas business, it made capital investments of ¥31.939 billion, mainly for the expansion and improvement of the gas pipeline network as supply facilities.」

    Investment in stable supply facilities totaled ¥39.032 billion, including ¥31.939 billion in the gas business. Future investment plans, including trunk transportation pipelines, were also presented.
  4. FY2022-Q3RestatedAnnual report

    「During the nine-month period of the consolidated fiscal year, there were no significant changes in major facilities.」

    There were no new significant changes in major facilities related to the stable supply of natural gas.
  5. FY2021AdvancedAnnual report

    「In its core gas business, the Group is developing and expanding a stable natural gas supply system and strengthening facilities that support the wider adoption of gas, while also renewing facilities required to advance its various businesses. In total, it made capital investments of ¥34.305 billion. In the gas, construction, and appliance businesses, it made capital investments of ¥27.846 billion, mainly for the expansion and improvement of the gas pipeline network as supply facilities.」

    The Group invested ¥34.305 billion in total and ¥27.846 billion in the gas, construction, and appliance businesses, continuing to develop stable supply facilities centered on the gas pipeline network.
  6. FY2020AdvancedAnnual report

    「In its core gas business, the Group is developing and expanding a stable natural gas supply system and strengthening facilities that support the wider adoption of gas, while also renewing facilities required to advance its various businesses. In total, it made capital investments of ¥33.566 billion. In the gas, construction, and appliance businesses, it made capital investments of ¥27.662 billion, mainly for the expansion and improvement of the gas pipeline network as supply facilities.」

    The Group invested ¥33.566 billion in total and ¥27.662 billion in the gas, construction, and appliance businesses, advancing the development of stable supply facilities. Future investment plans, including trunk transportation pipelines, were also presented.
  7. FY2019AdvancedAnnual report

    「In its core gas business, the Group is developing and expanding a stable natural gas supply system and strengthening facilities that support the wider adoption of gas, while also renewing facilities required to advance its various businesses. In total, it made capital investments of ¥34.610 billion. In the gas, construction, and appliance businesses, it made capital investments of ¥29.869 billion, mainly for the expansion and improvement of the gas pipeline network as supply facilities. The Group planned total capital investment of ¥36.2 billion for fiscal 2019, to be funded through internal funds and other sources.」

    The Group invested ¥34.610 billion in total and ¥29.869 billion in the gas, construction, and appliance businesses during the period, and planned capital investment of ¥36.2 billion for fiscal 2019.
  8. FY2019-Q3AdvancedAnnual report

    「City gas business investment Cumulative total ¥80.0 billion or more」

    A new plan was presented to invest a cumulative total of ¥80.0 billion or more in the city gas business during fiscal 2019–2021, establishing a specific investment target for developing the natural gas supply infrastructure.
  9. FY2019-Q2RestatedAnnual report

    「During the six-month period of the consolidated fiscal year, there were no significant changes in major facilities.」

    There were no new significant changes in major facilities, and the policy for developing facilities related to the natural gas supply system remains in place.
  10. FY2018-Q3AdvancedAnnual report

    「During the nine-month period of the consolidated fiscal year, there were no significant changes in major facilities. The power-generation facilities at the Yokkaichi Plant, which were under planning at the end of the previous consolidated fiscal year, were completed in October 2017.」

    The power-generation facilities at the Yokkaichi Plant, which had been under planning, were completed in October 2017, advancing the development of natural gas-related production and supply facilities.
  11. FY2017AdvancedAnnual report

    「In its core gas business, the Group is developing and expanding a stable natural gas supply system and strengthening facilities that support the wider adoption of gas, while also renewing facilities required to advance its various businesses. In total, it made capital investments of ¥49.298 billion. In the gas, construction, and appliance businesses, it made capital investments of ¥40.302 billion, mainly for the construction of the No. 3 LNG tank at the Chita-Ryokuhama Plant as a production facility and the expansion and improvement of the gas pipeline network as supply facilities.」

    The Group invested ¥49.298 billion in total and ¥40.302 billion in gas-related businesses during the period, making concrete progress in developing its natural gas supply system.
  12. FY2017-Q3RestatedAnnual report

    「There were no significant changes in major facilities during the cumulative third quarter of the consolidated fiscal year. The Chita Midorihama Plant BOG reliquefaction facility, which had been under planning at the end of the previous consolidated fiscal year, was completed in June 2016, LNG Tank No. 3 at the Chita Midorihama Plant was completed in July 2016, and the transmission trunk line (the Mie trunk line, between Suzuka and Kawai) was completed in August 2016.」

    There were no new significant changes in facilities related to the stable supply of natural gas, and the status of facility development completed by the previous quarter was reconfirmed.
  13. FY2017-Q2AdvancedAnnual report

    「At the end of the previous consolidated fiscal year, the Chita Midorihama Plant BOG reliquefaction facility, which had been under planning, was completed in June 2016, LNG Tank No. 3 at the Chita Midorihama Plant was completed in July 2016, and the transmission trunk line (the Mie trunk line, between Suzuka and Kawai) was completed in August 2016.」

    In addition to the BOG reliquefaction facility completed in the previous quarter, the No. 3 LNG tank and the trunk transportation pipeline were also completed, advancing the development of a stable natural gas supply system.
  14. FY2017-Q1AdvancedAnnual report

    「The BOG reliquefaction facility at the Chita-Ryokuhama Plant, which was under planning at the end of the previous consolidated fiscal year, was completed in June 2016.」

    The BOG reliquefaction facility at the Chita-Ryokuhama Plant, which had been under planning, was completed in June 2016, marking concrete progress in the development of natural gas supply-related facilities.
  15. FY2016First statedAnnual report

    「In its core gas business, the Group is developing and expanding a stable natural gas supply system and strengthening facilities that support the wider adoption of gas, while also renewing facilities required to advance its various businesses. In total, it made capital investments of ¥40.101 billion.」

    The Group invested ¥40.101 billion during the period, advancing projects including the No. 3 LNG tank at the Chita-Ryokuhama Plant and the expansion and improvement of the pipeline network. Planned capital investment for fiscal 2016 was stated as ¥54.0 billion.
Moved together

"Expansion into new business areas through electricity retailing and smart towns" moved the same way as this thread, in the same document, in 8 of its 15 moves.

855554★123456
  1. ★This thread
  2. 1Expansion into new business areas through electricity retailing and smart towns8×
  3. 2Smart Energy Society, Renewable Energy, and Hydrogen-Related Technologies5×
  4. 3Strengthening Governance through Outside Officers, the Executive Officer System and the Board of Corporate Auditors5×
  5. 4Deepening Customer Relationships5×
  6. 5Accelerating business structure reform and venturing into new areas5×
  7. 6Strengthening Technical and On-Site Capabilities and Securing and Developing Talent4×

★ is this thread; numbers match the list above. The number on a line is how many documents both moved the same way in; lines between the other threads count the documents they moved together in too. Threads that move together often sit closer.

When this could move next
Toho Gas's next results are scheduled for 2026-10-29. Read the earnings preview
News
No news is linked to this thread yet. When an article touches it, it will appear here by date.
Development and Expansion of a Stable Natural Gas Supply Framework | TOHO GAS CO.,LTD. (9533) | Komori