Electric Power Development (9513) · InitiativeAdvanced

Promotion of Geothermal Power Generation Development

First written in FY2016. 4 of 8 entries say "Advanced", first in FY2019-Q1. Latest entry: FY2026-H1.

8entries
10years
0from disclosures
Share on X
How it moved
ProgressHeldSoftenedWorseFirst statedFY2016 – FY2017AdvancedFY2019 – FY2026-H12016: 120162017: 120172018: 220182019: 220192020: 020202021: 020212022: 120222023: 020232024: 020242025: 12025
Same theme, other companies
Promoting geothermal power developmentA theme 2 companies write about · 0 as a headwind · 2 as a tailwind

1 other company's latest entry also says "Advanced".

Ridges = years it wrote progress, valleys = years it wrote worse. Most hopeful companies at the back. Drag to turn, scroll to zoom, right-drag to pan. On a phone, two fingers turn and pinch to zoom; one finger scrolls the page.
Full recordFilings, disclosures and news, newest first
  1. FY2026-H1AdvancedAnnual report

    「Beginning in the current interim consolidated fiscal year, Hakusui Koshi Geothermal Co., Ltd., established in June 2025, has newly been included within the scope of application of the equity method.」

    The newly established 白水越地熱㈱ has been incorporated as an equity-method affiliate, giving concrete form to the development structure for the geothermal power business.
  2. FY2022AdvancedAnnual report

    「In Japan, in addition to steadily advancing the projects currently under construction, including onshore wind power projects (Kaminokuni No. 2, Minami-Ehime No. 2 and Esashi), hydropower projects (Shinkatsura-zawa and Onabara), and geothermal power projects (Onikobe and Appi),」

    The Onikobe and Appi projects are positioned as renewable energy projects in the construction phase.
  3. FY2019AdvancedAnnual report

    「For geothermal power, also a baseload power source, in addition to steadily advancing the replacement of the Onikobe Geothermal Power Station, which is under construction, with an output of 14,900 kW and scheduled to commence operations in fiscal 2023, and the planned Appi Geothermal Power Station, with an output of 14,900 kW and scheduled to commence operations around spring 2024 as a joint project with Mitsubishi Materials Corporation and Mitsubishi Gas Chemical Company, Inc., we will pursue new development projects.」

    For the Onikobe replacement project and the Appi Geothermal Power Station, the company specified outputs of 14,900 kW and planned operating start dates, advancing its geothermal development plans.
  4. FY2019-Q3RestatedAnnual report

    「From the first quarter of the current fiscal year, 安比地熱㈱, in which an interest was acquired in June 2018, has newly been included in the scope of equity-method accounting.」

    The acquisition of an interest in 安比地熱㈱ and its inclusion as an equity-method affiliate are reiterated as a change in the business description.
  5. FY2019-Q2RestatedAnnual report

    「From the first quarter of the current fiscal year, 安比地熱㈱, in which an interest was acquired in June 2018, has newly been included in the scope of equity-method accounting.」

    The acquisition of an interest in 安比地熱㈱ and its inclusion as an equity-method affiliate are reiterated as changes in the business description.
  6. FY2019-Q1AdvancedAnnual report

    「From the first quarter of the current fiscal year, 安比地熱㈱, in which an interest was acquired in June 2018, has newly been included in the scope of equity-method accounting.」

    The company acquired an interest in 安比地熱㈱ and incorporated it as an equity-method affiliate.
  7. FY2017RestatedAnnual report

    「We will also promote the development of geothermal power, a baseload power source.」

    The company has reaffirmed its promotion of development for the Wasabizawa Geothermal Power Station and the Onikobe Geothermal Power Station replacement project.
  8. FY2016First statedAnnual report

    「We will also promote the development of geothermal power, a baseload power source.」

    The 42,000 kW Wasabizawa Geothermal Power Station and the approximately 23,000 kW Onikobe Geothermal Power Station replacement project are currently planned.
Moved together

"Improving Asset Efficiency and Profitability through Business Selection" moved the same way as this thread, in the same document, in 4 of its 8 moves.

433222★123456
  1. ★This thread
  2. 1Improving Asset Efficiency and Profitability through Business Selection4×
  3. 2Expanding renewable energy deployment3×
  4. 3Development and Expansion of the Wind Power Generation Business3×
  5. 4Ensuring Equipment Reliability and Stable Operations at Power Generation Facilities2×
  6. 5Maintaining stable dividends and returning the benefits of growth2×
  7. 6Fair and Transparent Management and Thorough Compliance2×

★ is this thread; numbers match the list above. The number on a line is how many documents both moved the same way in; lines between the other threads count the documents they moved together in too. Threads that move together often sit closer.

When this could move next
Electric Power Development's next results are scheduled for 2026-10-30. Read the earnings preview
News
No news is linked to this thread yet. When an article touches it, it will appear here by date.
Promotion of Geothermal Power Generation Development | Electric Power Development Co.,Ltd. (9513) | Komori