Komori
Electric Power Development (9513) · TargetAdvanced

Development and Expansion of the Wind Power Generation Business

First written in FY2016. 12 of 15 entries say "Advanced", first in FY2017. Latest entry: FY2026.

15entries
11years
2from disclosures
Share on X
How it moved
ProgressHeldSoftenedWorseAdvancedFY2018-Q3 – FY2025-H12016: 120162017: 320172018: 320182019: 220192020: 020202021: 020212022: 120222023: 020232024: 220242025: 020252026: 32026
Same theme, other companies
Development and capacity expansion of wind power facilitiesA theme 2 companies write about · 0 as a headwind · 2 as a tailwind

1 other company's latest entry also says "Advanced".

Ridges = years it wrote progress, valleys = years it wrote worse. Most hopeful companies at the back. Drag to turn, scroll to zoom, right-drag to pan. On a phone, two fingers turn and pinch to zoom; one finger scrolls the page.
Full recordFilings, disclosures and news, newest first
  1. FY2026AdvancedAnnual report

    「In fiscal 2025, in addition to expanding generating capacity through the construction and upgrading of facilities such as the Kitakyushu Hibikinada Offshore Wind Farm, the Kitakyushu City Hibikinada Solar Power Station and the Okutadami Power Station (hydroelectric), we worked to improve operating rates and took other measures.」

    In the wind power business, expanded installed capacity, including through the construction of the Kitakyushu Hibikinada Offshore Wind Farm, and improved operating rates.
  2. FY2025-H1AdvancedAnnual report

    「GENEX is developing a clean energy hub at the Kidston site in Queensland comprising solar power, pumped-storage hydroelectric power and wind power generation.」

    Through making GENEX a subsidiary, incorporated an Australian clean energy hub combining solar, pumped-storage hydroelectric and wind power into its business portfolio.
  3. FY2024AdvancedAnnual report

    「In addition, Oga-Katagami-Akita Offshore Green Energy (GK), established in February 2024, has newly been included within the scope of application of the equity method.」

    For its domestic offshore wind power business, established Oga-Katagami-Akita Offshore Green Energy (GK) and included it as an equity-method affiliate.
  4. FY2022AdvancedAnnual report

    「The large-scale projects our Group had been constructing in the UK and the US, the Triton Knoll offshore wind power project and the Jackson gas-fired power station, respectively began operations in April 2022 and May 2022.」

    Specifies the concrete milestone of the Triton Knoll offshore wind power project in the UK beginning operations in April 2022.
  5. FY2019AdvancedAnnual report

    「For wind power generation, in addition to steadily advancing projects under construction (Setana Osato, Nikaho No. 2 and Kuzumaki No. 2), we will continue to identify and cultivate sites with favorable wind conditions and expand our business base, while working to improve facility operating rates through more efficient maintenance and operations and to enhance earnings power. We also participated in an offshore wind power business in the UK, the Triton Knoll Wind Power Project, with a capacity of 860 MW, a joint project with innogy SE and The Kansai Electric Power Company,Incorporated, scheduled to begin operations in fiscal 2021, and will continue efforts toward offshore wind power generation in Japan.」

    In addition to advancing and improving the operating efficiency of domestic projects under construction, it provides specific details of participation in the UK's Triton Knoll offshore wind project.
  6. FY2019-Q3AdvancedAnnual report

    「During the second quarter of the current consolidated fiscal year, J-Wind Co., Ltd., a consolidated subsidiary, absorbed and merged its former consolidated subsidiary Minami-Kyushu Wind Power Co., Ltd. in July 2018.」

    Reorganized its business structure by absorbing and merging Minami-Kyushu Wind Power Co., Ltd. in its wind power business.
  7. FY2019-Q2AdvancedAnnual report

    「Beginning in the second quarter of the current consolidated fiscal year, Triton Knoll Offshore Wind Farm Ltd. and 1 other company, in which equity interests were acquired in September 2018, have newly been included within the scope of application of the equity method.」

    Acquired an equity interest in the UK's Triton Knoll offshore wind power business, expanding the geographic area of wind power development.
  8. FY2019-Q1AdvancedAnnual report

    「Beginning in the first quarter of the current consolidated fiscal year, J-Wind Kaminokuni Co., Ltd., established in April 2018, has newly been included in the scope of consolidation. In addition, J-Wind Co., Ltd., a consolidated subsidiary, absorbed and merged its consolidated subsidiary Yurihonjo Wind Power Co., Ltd. in April 2018.」

    In its wind power business, established J-Wind Kaminokuni Co., Ltd. and included it as a consolidated entity, while absorbing and merging Yurihonjo Wind Power Co., Ltd.
  9. FY2018-Q3AdvancedAnnual report

    「During the first quarter of the current consolidated fiscal year, J-Wind Co., Ltd., a consolidated subsidiary established in April 2017, absorbed and merged its 3 consolidated subsidiaries, Nikaho Kogen Wind Power Co., Ltd., Japan Clean Energy Development Co., Ltd. and J-Wind Oma Co., Ltd. In addition, Hibiki Wind Energy Co., Ltd., established in April 2017, has newly been included within the scope of application of the equity method.」

    Implemented the absorption-type merger of 3 wind power-related subsidiaries and included Hibiki Wind Energy Co., Ltd. within the scope of application of the equity method.
  10. FY2018-Q2RestatedAnnual report

    「In addition, Hibiki Wind Energy Co., Ltd., established in April 2017, has newly been included within the scope of application of the equity method.」

    Reconfirms the establishment of Hibiki Wind Energy Co., Ltd. and its inclusion as an equity-method affiliate, with the same content as the previous disclosure.
  11. FY2018-Q1AdvancedAnnual report

    「Beginning in the current consolidated fiscal year, Hibiki Wind Energy Co., Ltd., established in April 2017, has newly been included within the scope of application of the equity method.」

    Established Hibiki Wind Energy Co., Ltd. in connection with the Hibikinada offshore wind power business and included it as an equity-method affiliate.
  12. FY2017AdvancedAnnual report

    「For wind power generation, in addition to steadily advancing projects under development, we will continue to identify and cultivate sites with favorable wind conditions and expand our business base, while working to improve facility operating rates through more efficient maintenance and operations and to enhance earnings power. In addition, in the public solicitation for an operator of the Hibikinada offshore wind power generation facility in Kitakyushu, Fukuoka Prefecture, a consortium including us was selected as the prospective occupancy party (preferred negotiator), and we will conduct studies and other work toward commercialization.」

    In addition to existing wind power development, a consortium was selected as the preferred negotiator for the Hibikinada offshore wind power generation facility.
  13. FY2016First statedAnnual report

    「For wind power generation, we will steadily advance projects under development, while continuing to identify and cultivate sites with favorable wind conditions and expand our business base.」

    Provides the capacities and planned operating start dates from fiscal 2017 to fiscal 2019 for Yurihonjo Coast, Setana Osato, Nikaho No. 2 and Kuzumaki No. 2.
Moved together

"Expansion of Renewable Energy Deployment" moved the same way as this thread, in the same document, in 8 of its 15 moves.

876644★123456
  1. ★This thread
  2. 1Expansion of Renewable Energy Deployment8×
  3. 2Improving Asset Efficiency and Profitability through Business Selection7×
  4. 3Growth in overseas power generation operations and expansion of overseas equity-method generation capacity6×
  5. 4Expansion of the Power Generation Business in the United States6×
  6. 5Ensuring Equipment Reliability and Stable Operations at Power Generation Facilities4×
  7. 6Leveraging Existing Hydropower and Developing Small and Medium-Sized Hydropower4×

★ is this thread; numbers match the list above. The number on a line is how many documents both moved the same way in; lines between the other threads count the documents they moved together in too. Threads that move together often sit closer.

When this could move next
Electric Power Development's next results are scheduled for 2026-10-30. Read the earnings preview It last moved in the General Meetings of Shareholders of 2026-05-27: "Advanced".
News
No news is linked to this thread yet. When an article touches it, it will appear here by date.
Development and Expansion of the Wind Power Generation Business | Electric Power Development Co.,Ltd. (9513) | Komori