Komori
Kyushu Railway Company (9142) · RiskRestated

Decline in Kyushu Tourism Demand Caused by the Kumamoto Earthquake

First written in FY2017-Q2. 3 of 6 entries say "Mitigated", first in FY2017-Q3. Latest entry: FY2018-Q3.

6entries
3years
0from disclosures
Share on X
How it moved
ProgressHeldSoftenedWorseMaterialisedFY2017-Q2MitigatedFY2017-Q3 – FY2018-Q1RestatedFY2018-Q2 – FY2018-Q32016: 120162017: 420172018: 12018
Same theme, other companies
Impact of the Kumamoto earthquake on tourism and the regional economyA theme 5 companies write about · 5 as a headwind · 0 as a tailwind

0 other companies' latest entry also says "Restated".

Ridges = years it wrote progress, valleys = years it wrote worse. Most hopeful companies at the back. Drag to turn, scroll to zoom, right-drag to pan. On a phone, two fingers turn and pinch to zoom; one finger scrolls the page.
Full recordFilings, disclosures and news, newest first
  1. FY2018-Q3RestatedAnnual report

    「Regarding the 2016 Kumamoto Earthquake, which occurred in April the year before last, recovery continued as reconstruction and recovery demand gathered full momentum and the tourism industry and other sectors generally recovered, led by inbound demand.」

    It continues to describe reconstruction and recovery demand gathering full momentum and the tourism industry, including inbound demand, remaining on a recovery trend.
  2. FY2018-Q2RestatedAnnual report

    「Regarding the 2016 Kumamoto Earthquake, which occurred in April last year, recovery continued as reconstruction and recovery demand gathered full momentum and the tourism industry and other sectors generally recovered, led by inbound demand.」

    It continues to describe reconstruction and recovery demand gathering full momentum and the tourism industry, including inbound demand, remaining on a recovery trend.
  3. FY2018-Q1MitigatedAnnual report

    「Recovery continued, with reconstruction and recovery demand gathering full momentum and the tourism industry and other sectors generally recovering, led by inbound demand.」

    It describes reconstruction and recovery demand gathering full momentum and the recovery of the tourism industry, including inbound demand.
  4. FY2017MitigatedAnnual report

    「The Kyushu Shinkansen has now returned to normal operations, and operating conditions in the other businesses have also recovered. We believe the impact on our business and performance was temporary.」

    Regarding tourism and operating conditions after the Kumamoto Earthquake, it states that the Kyushu Shinkansen returned to normal operations and the other businesses recovered. However, it does not state that the impact on tourism demand had completely disappeared.
  5. FY2017-Q3MitigatedAnnual report

    「Regarding the 2016 Kumamoto Earthquake, which occurred on 14 April last year, conditions steadily improved as reconstruction and recovery demand became more apparent, but the tourism industry and other sectors, particularly in Kumamoto and Oita prefectures, remained in a difficult situation.」

    It states that reconstruction and recovery demand had become more apparent and the tourism industry had begun to recover, while the tourism industry and other sectors remained in a difficult situation.
  6. FY2017-Q2MaterialisedAnnual report

    「The tourism industries and other sectors, mainly in Kumamoto and Oita prefectures, remained in a difficult situation.」

    The company states that sluggish tourism demand continued to affect the business environment.
Moved together

"Operating Profit and Net Income Reported for the Cumulative Period through the Second Quarter" moved the same way as this thread, in the same document, in 3 of its 6 moves.

333322★123456
  1. ★This thread
  2. 1Operating Profit and Net Income Reported for the Cumulative Period through the Second Quarter3×
  3. 2Creating Vibrant Communities Through the Development and Renewal of Facilities Around Stations3×
  4. 3Expansion of Express Bus, Vessel and Other Routes and Products3×
  5. 4Early Restoration from the Kumamoto Earthquake and Support for the Recovery of Affected Areas3×
  6. 5Raising awareness of the Kyushu brand and attracting more visitors to Kyushu2×
  7. 6R&D Expenses for the Nine-Month Period2×

★ is this thread; numbers match the list above. The number on a line is how many documents both moved the same way in; lines between the other threads count the documents they moved together in too. Threads that move together often sit closer.

When this could move next
Kyushu Railway Company's next results are scheduled for 2026-11-04. Read the earnings preview
News
No news is linked to this thread yet. When an article touches it, it will appear here by date.