Komori
Kyushu Railway Company (9142) · InitiativeAdvancedLatest Earnings presentation (2026-08-04): "Cited as achieved"

Safety investments including the renewal of aging facilities, measures against torrential rain and seismic reinforcement

First written in FY2017-Q2. 12 of 26 entries say "Restated". Latest entry: 2026-08-04.

26entries
11years
4from disclosures
Share on X
How it moved
ProgressHeldSoftenedWorseRestatedFY2021-Q3 – FY2022-Q3AdvancedFY2023 – FY20262016: 12017: 320172018: 420182019: 320192020: 220202021: 120212022: 420222023: 120232024: 120242025: 120252026: 52026
Same theme, other companies
Comprehensive strengthening of disaster resilience in railway facilities and operationsA theme 3 companies write about · 0 as a headwind · 4 as a tailwind

0 other companies' latest entry also says "Cited as achieved".

Ridges = years it wrote progress, valleys = years it wrote worse. Most hopeful companies at the back. Drag to turn, scroll to zoom, right-drag to pan. On a phone, two fingers turn and pinch to zoom; one finger scrolls the page.
Full recordFilings, disclosures and news, newest first
  1. 2026-08-04Cited as achievedEarnings presentation

    「修繕費 51 63 11 123.0% 安全・老朽化対策に伴う増」

    第1四半期の修繕費増加について、安全・老朽化対策に伴うものと説明した。
  2. FY2026AdvancedAnnual report

    「The Transport Services Group invested in facilities to ensure safe and reliable transportation, improve the transport infrastructure, enhance services and improve operational efficiency, including ¥32,499 million in capital expenditures for new rolling stock, refurbishment and other projects.」

    The Transport Services Group invested ¥32,499 million in new rolling stock, refurbishment and other projects.
  3. FY2025AdvancedAnnual report

    「The Transport Services Group invested in facilities to ensure safe and reliable transportation, improve the transport infrastructure, enhance services and improve operational efficiency, including ¥31,650 million in capital expenditures for developing next-generation rolling stock inspection facilities and manufacturing new YC1 Series battery-equipped diesel-electric trains.」

    It made ¥31,650 million in capital expenditures for safe and reliable transportation and other purposes, including next-generation rolling stock inspection facilities and new YC1 Series trains.
  4. FY2024AdvancedAnnual report

    「The Transport Services Group invested in facilities to ensure safe and reliable transportation, improve the transport infrastructure, enhance services and improve operational efficiency, including ¥26,721 million in capital expenditures for new Shinkansen rolling stock for the Nishi Kyushu Shinkansen and restoration of the Hita-Hikosan Line BRT.」

    It disclosed ¥26,721 million in capital expenditures by the Transport Services Group, including new rolling stock for the Nishi Kyushu Shinkansen and restoration of the Hita-Hikosan Line BRT.
  5. FY2023AdvancedAnnual report

    「The Transport Services Group invested in facilities to ensure safe and reliable transportation, improve the transport infrastructure, enhance services and improve operational efficiency, including ¥29,627 million in capital expenditures for new Shinkansen rolling stock for the Nishi Kyushu Shinkansen and restoration of the Hita-Hikosan Line BRT.」

    It made ¥29,627 million in capital expenditures for safety and the transport infrastructure, including new rolling stock for the Nishi Kyushu Shinkansen and restoration of the Hita-Hikosan Line BRT.
  6. FY2023-Q2RestatedAnnual report

    「We also steadily carried out safety investments, including the manufacture of new rolling stock, the replacement of aging facilities and disaster-preparedness measures.」

    It continues to make safety investments in new rolling stock, the replacement of aging facilities, disaster-preparedness measures and other areas.
  7. FY2023-Q1RestatedAnnual report

    「We also steadily carried out safety investments, including the manufacture of new rolling stock, the replacement of aging facilities and disaster-preparedness measures.」

    It continues to make safety investments in new rolling stock, the replacement of aging facilities, disaster-preparedness measures and other areas.
  8. FY2022AdvancedAnnual report

    「The Transport Services Group invested in facilities to ensure safe and reliable transportation, improve the transport infrastructure, enhance services and improve operational efficiency, including ¥32,992 million in capital expenditures for 821 Series trains and Shinkansen rail grinding cars.」

    It made ¥32,992 million in capital expenditures for safe and reliable transportation and other purposes, including 821 Series trains and Shinkansen rail grinding cars.
  9. FY2022-Q3RestatedAnnual report

    「We also steadily carried out safety investments, including the manufacture of new rolling stock and the replacement of aging facilities.」

    It continues to invest in the manufacture of new rolling stock and the replacement of aging facilities as safety investments.
  10. FY2021-Q3RestatedAnnual report

    「In terms of safety, we steadily carried out safety investments, including rolling stock refurbishment and the replacement of aging facilities.」

    It continues to carry out rolling stock refurbishment and replace aging facilities as safety investments.
  11. FY2021-Q1AdvancedAnnual report

    「Beginning in April this year, we equipped some in-service trains with a train patrol support system and an electric railway track monitoring device, and began initiatives to improve the efficiency of inspection work, the quality of facilities, and employee safety.」

    As a safety investment, it began installing a train patrol support system and an electric railway track monitoring device on some in-service trains in April.
  12. FY2020-Q3RestatedAnnual report

    「We also steadily carried out safety investments, including rolling stock refurbishment and the replacement of aging facilities.」

    It continues to carry out rolling stock refurbishment and replace aging facilities as safety investments.
  13. FY2020-Q1RestatedAnnual report

    「We also steadily carried out safety investments, including rolling stock refurbishment and the replacement of aging facilities.」

    It continues to carry out rolling stock refurbishment and replace aging facilities as safety investments.
  14. FY2019AdvancedAnnual report

    「The Transport Services Group invested in facilities to ensure safe and reliable transportation, improve the transport infrastructure, enhance services and improve operational efficiency, including ¥32,008 million in capital expenditures for the manufacture of 819 Series overhead-line battery trains (DENCHA) and new high-speed vessels, including QUEEN BEETLE.」

    It continued capital investment in safety and the transport infrastructure, making annual investments of ¥32,008 million, including the manufacture of new DENCHA trains and new high-speed vessels.
  15. FY2019-Q3RestatedAnnual report

    「We also steadily carried out safety investments, including the manufacture and refurbishment of rolling stock and the replacement of aging facilities.」

    It continues to invest in the manufacture and refurbishment of rolling stock and the replacement of aging facilities as safety investments.
  16. FY2019-Q2RestatedAnnual report

    「We also steadily replaced aging facilities and implemented Shinkansen derailment countermeasures as part of our safety investment.」

    It continues to replace aging facilities and implement Shinkansen derailment countermeasures as safety investments.
  17. FY2019-Q1RestatedAnnual report

    「We also steadily replaced aging facilities as part of our safety investment.」

    It continues to replace aging facilities as part of its safety investment.
  18. FY2018AdvancedAnnual report

    「The Transport Services Group invested in facilities to ensure safe and reliable transportation, improve the transport infrastructure, enhance services and improve operational efficiency, including ¥26,676 million in capital expenditures for the manufacture of 821 Series suburban electric trains and the refurbishment of 811 Series trains.」

    The Transport Services Group made ¥26,676 million in capital expenditures, specifically for new rolling stock and refurbishment projects.
  19. FY2018-Q3RestatedAnnual report

    「For safety investment, we steadily replaced aging facilities and continued implementing disaster-preparedness measures, including measures against torrential rain and the installation of derailment-prevention guards on the Shinkansen.」

    It continues to renew aging facilities, implement measures against torrential rain, and install derailment-prevention guards on the Shinkansen.
  20. FY2018-Q2RestatedAnnual report

    「For safety investment, we steadily replaced aging facilities and continued implementing disaster-preparedness measures, including measures against torrential rain and the installation of derailment-prevention guards on the Shinkansen.」

    It continues to renew aging facilities, implement measures against torrential rain, and install derailment-prevention guards on the Shinkansen.
  21. FY2018-Q1RestatedAnnual report

    「For safety investment, we steadily replaced aging facilities and continued implementing disaster-preparedness measures, including measures against torrential rain and the installation of derailment-prevention guards on the Shinkansen.」

    It continues to renew aging facilities, implement measures against torrential rain, and install derailment-prevention guards on the Shinkansen.
  22. FY2017AdvancedAnnual report

    「The Transport Services Group invested in facilities to ensure safe and reliable transportation, improve the transport infrastructure, enhance services and improve operational efficiency, including ¥30,966 million in capital expenditures for overhead-line battery trains (DENCHA) and Shinkansen derailment countermeasures.」

    It disclosed annual capital expenditures of ¥30,966 million for safe and reliable transportation, Shinkansen derailment countermeasures and other measures, quantifying the implementation of these initiatives.
  23. FY2017-Q2First statedAnnual report

    「For safety investment, we steadily replaced aging facilities and continued implementing disaster-preparedness measures, including measures against torrential rain, seismic reinforcement of structures, and the installation of derailment-prevention guards on the Shinkansen.」

    It identifies facility renewal, measures against torrential rain, seismic reinforcement and derailment-prevention equipment as specific safety investment measures.
Moved together

"Creating Vibrant Communities Through the Development and Renewal of Facilities Around Stations" moved the same way as this thread, in the same document, in 10 of its 26 moves.

1098777★123456
  1. ★This thread
  2. 1Creating Vibrant Communities Through the Development and Renewal of Facilities Around Stations10×
  3. 2Promoting Human Resource Development and Work-Life Balance9×
  4. 3Improving operations through ICT, mechanization, automation and big-data utilization8×
  5. 4Operating Profit and Net Income Reported for the Cumulative Period through the Second Quarter7×
  6. 5Substantial Revenue and Profit Growth for the Station Building and Real Estate Group7×
  7. 6Strengthening Corporate Ethics, Compliance and Internal Control Systems7×

★ is this thread; numbers match the list above. The number on a line is how many documents both moved the same way in; lines between the other threads count the documents they moved together in too. Threads that move together often sit closer.

When this could move next
Kyushu Railway Company's next results are scheduled for 2026-11-04. Read the earnings preview It last moved in the Earnings presentation of 2026-08-04: "Cited as achieved".
News
No news is linked to this thread yet. When an article touches it, it will appear here by date.