Tokyo Board Industries (7815) · RiskMaterialised

Risk of suspension of operations at the Rinkai Plant due to natural disasters

First written in FY2016. 16 of 27 entries say "Restated". Latest entry: FY2027-H1.

27entries
11years
5from disclosures
Share on X
How it moved
ProgressHeldSoftenedWorseRestatedFY2016 – FY2020-Q3RestatedFY2021RestatedFY2024-Q32016: 320162017: 420172018: 320182019: 420192020: 220202021: 120212022: 020222023: 120232024: 120242025: 120252026: 72026
Same theme, other companies

The whole theme swung hardest in 2018: 32 of 131 companies on the "Worse" side.

Ridges = years it wrote progress, valleys = years it wrote worse. Most hopeful companies at the back. Drag to turn, scroll to zoom, right-drag to pan. On a phone, two fingers turn and pinch to zoom; one finger scrolls the page.
Showing 14 of the 187 companies compared. The sentences above are computed from all 187.Comparing 200 of the theme's 501 threads.
Full recordFilings, disclosures and news, newest first
  1. FY2027-H1MaterialisedAnnual report

    「A small fire occurred at our Sakura Plant on 1 November 2025, and production was suspended. The Company recorded ¥351.912 million as loss from disaster under extraordinary losses for the cumulative interim consolidated period, representing fixed costs incurred during the production suspension. It also recorded ¥309.921 million as insurance proceeds under extraordinary gains for the cumulative interim consolidated period in respect of the damage. The plant resumed production on 10 June 2026.」

    The impact of the production suspension caused by the small fire at the Sakura Plant resulted in ¥351.912 million in loss from disaster, including fixed costs, and ¥309.921 million in insurance proceeds being recorded for the interim period. Production resumed on 10 June.
  2. FY2026MaterialisedAnnual report

    「The Company recorded ¥558.678 million as loss from disaster under extraordinary losses for the fiscal year, representing fixed costs incurred during the production suspension and recovery costs required to restart the affected equipment.」

    Regarding the risk of a production stoppage caused by the small fire on the Sakura Plant manufacturing line, ¥558.678 million in loss from disaster was actually recorded for fixed costs incurred during the production suspension and recovery costs.
  3. FY2026-H1MaterialisedAnnual report

    「A small fire occurred on the manufacturing line at our Sakura Plant on 1 November 2025. We are currently investigating the extent of the damage and the impact on future results.」

    Regarding the risk of production stoppages and equipment damage at the Sakura Plant, a small fire occurred on the manufacturing line after the filing date, and the company stated that it was investigating the extent of the damage and its impact on results.
  4. FY2024-Q3RestatedAnnual report

    「Although the impact of the fire damage to the chip-drying equipment at the Sakura Plant on 24 December 2022 has enabled stable production under a temporary production structure following a review of the manufacturing process, particleboard production remains at a low level compared with normal operations.」

    The operational impact of the fire damage to the chip-drying equipment at the Sakura Plant continues. Although stable production has become possible under a temporary production structure, production remains below normal levels and limited to small volumes.
  5. FY2023MaterialisedAnnual report

    「However, production was suspended in December 2022 due to fire damage to the chip-drying equipment at the Sakura Plant.」

    In addition to the existing risk of production stoppages caused by natural disasters, equipment damage caused by fires and other accidents was identified as a risk, and fire damage to the chip-drying equipment at the Sakura Plant and the resulting production stoppage actually occurred.
  6. FY2021RestatedAnnual report

    「From a business continuity planning (BCP) perspective, our Group will continue working to minimize damage and strengthen its business continuity framework.」

    Based on damage caused by typhoons, high waves and other events in prior years, the policy of minimizing damage and strengthening the business continuity framework through BCP in response to natural disasters and other events remains in place.
  7. FY2020MaterialisedAnnual report

    「In addition, the Sakura Plant was without power for 1 week after being struck by Typhoon No. 15 in September last year, while Yokohama Ecology Co., Ltd., a consolidated subsidiary, suffered flooding when the typhoon coincided with high waves, substantially reducing operating efficiency.」

    The risk of production stoppages and efficiency losses caused by natural disasters materialized in the form of a one-week power outage at the Sakura Plant and flood damage at Yokohama Ecology.
  8. FY2020-Q3RestatedAnnual report

    「The Group’s main plant, Shinkiba Recycling Plant, faces Tokyo Bay Timber Storage Area No. 14, while Yokohama Chip Plant faces the Kanazawa Timber Wharf at Yokohama Port. If these plants are forced to suspend operations or otherwise affected by a major natural disaster such as an earthquake or typhoon, this could affect the Group’s business performance.」

    The risk of production stoppages caused by earthquakes, typhoons and other events associated with the coastal locations of the plants continues.
  9. FY2020-Q2RestatedAnnual report

    「The Group’s main plant, Shinkiba Recycling Plant, faces Tokyo Bay Timber Storage Area No. 14, while Yokohama Chip Plant faces the Kanazawa Timber Wharf at Yokohama Port. If these plants are forced to suspend operations or otherwise affected by a major natural disaster such as an earthquake or typhoon, this could affect the Group’s business performance.」

    The risk of production stoppages caused by earthquakes, typhoons and other events associated with the coastal locations of the plants continues.
  10. FY2020-Q1RestatedAnnual report

    「During the cumulative first-quarter consolidated period, there were no material changes in matters described in this quarterly report concerning the status of the business, financial information and other matters that could materially affect investors' decisions, or in the business and other risks described in the annual securities report for the previous fiscal year.」

    The document concludes that there has been no material change in the risk of production stoppages at coastal plants caused by natural disasters.
  11. FY2019RestatedAnnual report

    「The Group’s main plant, Shinkiba Recycling Plant, faces Tokyo Bay Timber Storage Area No. 14, while Yokohama Chip Plant faces the Kanazawa Timber Wharf at Yokohama Port. If these plants are forced to suspend operations or otherwise affected by a major natural disaster such as an earthquake or typhoon, this could affect the Group’s business performance.」

    The risks of natural disasters and production stoppages associated with the coastal locations of Shinkiba Recycling Plant and Yokohama Chip Plant continue.
  12. FY2019-Q3RestatedAnnual report

    「The Group’s main plant, Shinkiba Recycling Plant, faces Tokyo Bay Timber Storage Area No. 14, while Yokohama Chip Plant faces the Kanazawa Timber Wharf at Yokohama Port. If these plants are forced to suspend operations or otherwise affected by a major natural disaster such as an earthquake or typhoon, this could affect the Group’s business performance.」

    The risk of production stoppages caused by earthquakes, typhoons and other events associated with the coastal locations of the plants continues.
  13. FY2019-Q2RestatedAnnual report

    「The Group’s main plant, Shinkiba Recycling Plant, faces Tokyo Bay Timber Storage Area No. 14, while Yokohama Chip Plant faces the Kanazawa Timber Wharf at Yokohama Port. If these plants are forced to suspend operations or otherwise affected by a major natural disaster such as an earthquake or typhoon, this could affect the Group’s business performance.」

    The risks of natural disasters and production stoppages associated with the coastal locations of Shinkiba Recycling Plant and Yokohama Chip Plant continue.
  14. FY2018RestatedAnnual report

    「If these plants are forced to suspend operations or otherwise affected by a major natural disaster such as an earthquake or typhoon, this could affect the Group’s business performance.」

    The risks of natural disasters and production stoppages associated with the coastal locations of Shinkiba Recycling Plant and Yokohama Chip Plant continue.
  15. FY2018-Q3RestatedAnnual report

    「During the cumulative third quarter under review, there were no significant changes in the matters described in this quarterly report regarding the business and accounting conditions that could materially affect investors’ decisions, or in the “Business and Other Risks” described in the securities report for the previous fiscal year.」

    The document concludes that there has been no material change in the risk of production stoppages at coastal plants caused by natural disasters.
  16. FY2018-Q2RestatedAnnual report

    「During the cumulative second quarter under review, there were no significant changes in the matters described in this quarterly report regarding the business and accounting conditions that could materially affect investors’ decisions, or in the “Business and Other Risks” described in the securities report for the previous fiscal year.」

    The document concludes that there has been no material change in the risk of production stoppages at coastal plants caused by natural disasters.
  17. FY2018-Q1RestatedAnnual report

    「During the cumulative first-quarter consolidated period, there were no material changes in matters described in this quarterly report concerning the status of the business, financial information and other matters that could materially affect investors' decisions, or in the business and other risks described in the annual securities report for the previous fiscal year.」

    The document concludes that there has been no material change in the risk of production stoppages at coastal plants caused by natural disasters.
  18. FY2017RestatedAnnual report

    「If these plants are forced to suspend operations or otherwise affected by a major natural disaster such as an earthquake or typhoon, this could affect the Group’s business performance.」

    The risks of natural disasters and production stoppages associated with the coastal locations of Shinkiba Recycling Plant and Yokohama Chip Plant continue to be described.
  19. FY2017-Q3RestatedAnnual report

    「During the cumulative third quarter under review, there were no significant changes in the matters described in this quarterly report regarding the business and accounting conditions that could materially affect investors’ decisions, or in the “Business and Other Risks” described in the securities report for the previous fiscal year.」

    The document concludes that there has been no material change in the risk of production stoppages at coastal plants caused by natural disasters.
  20. FY2017-Q2RestatedAnnual report

    「During the cumulative second quarter under review, there were no significant changes in the matters described in this quarterly report regarding the business and accounting conditions that could materially affect investors’ decisions, or in the “Business and Other Risks” described in the securities report for the previous fiscal year.」

    The document concludes that there has been no material change in the risk of production stoppages at coastal plants caused by natural disasters.
  21. FY2017-Q1RestatedAnnual report

    「During the cumulative first-quarter consolidated period, there were no material changes in matters described in this quarterly report concerning the status of the business, financial information and other matters that could materially affect investors' decisions, or in the business and other risks described in the annual securities report for the previous fiscal year.」

    No material changes in the risk of production stoppages at coastal plants caused by natural disasters are described.
  22. FY2016First statedAnnual report

    「The Group’s main plant, Shinkiba Recycling Plant, faces Tokyo Bay Timber Storage Area No. 14, while Yokohama Chip Plant faces the Kanazawa Timber Wharf at Yokohama Port. If these plants are forced to suspend operations or otherwise affected by a major natural disaster such as an earthquake or typhoon, this could affect the Group’s business performance.」

    Given the locations of its main plants, the Group identifies production stoppages caused by earthquakes, typhoons and other events as a risk to business performance.
Moved together

"Risk of Declining Housing Starts Due to Population Decline and Low Birth Rate" moved the same way as this thread, in the same document, in 7 of its 27 moves.

776532★123456
  1. ★This thread
  2. 1Risk of Declining Housing Starts Due to Population Decline and Low Birth Rate7×
  3. 2Loss conditions giving rise to substantial doubt about the going-concern assumption7×
  4. 3Risk of delays in the completion and stable operation of the Chiba Plant6×
  5. 4Liquidity Risk Management Through Cash Flow Planning and Readily Available Liquidity5×
  6. 5Reliance on Interest-Bearing Debt and Rising Interest Rate Risk Associated with Construction of the Sakura Plant3×
  7. 6Enhancing Earnings Power Through Improvements in Production Planning, Maintenance, and Manufacturing Management2×

★ is this thread; numbers match the list above. The number on a line is how many documents both moved the same way in; lines between the other threads count the documents they moved together in too. Threads that move together often sit closer.

When this could move next
Tokyo Board Industries's next results are scheduled for 2026-10-15. Read the earnings preview It last moved in the Occurring Fact of 2026-07-13: "Mitigated".