Komori
Nanyo (7417) · RiskMaterialisedLatest Revision of earnings forecasts (2026-10-19): "Restated"

Risk of longer lead times due to a shortage of operators at construction sites

First written in FY2022-Q2. 2 of 6 entries say "Worsened", first in FY2023. Latest entry: 2026-10-19.

6entries
6years
3from disclosures
Share on X
How it moved
ProgressHeldSoftenedWorseFirst statedFY2022-Q2WorsenedFY2023 – FY20262021: 12022: 020222023: 120232024: 020242025: 020252026: 42026
Same theme, other companies
Construction project delays caused by labor shortages in the construction industryA theme 34 companies write about · 34 as a headwind · 0 as a tailwind

Nanyo moved to the "Worse" side of this theme in 2023, 3 years after the typical company in this theme (2020).

The whole theme swung hardest in 2022: 6 of 14 companies on the "Worse" side.

10 other companies' latest entry also says "Restated".

Ridges = years it wrote progress, valleys = years it wrote worse. Most hopeful companies at the back. Drag to turn, scroll to zoom, right-drag to pan. On a phone, two fingers turn and pinch to zoom; one finger scrolls the page.
Showing 14 of the 34 companies compared. The sentences above are computed from all 34.
Full recordFilings, disclosures and news, newest first
  1. FY2026MaterialisedAnnual report

    「In addition to continued sluggish purchasing sentiment due to persistently high product prices, the business remained in a difficult environment owing to declining public- and private-sector construction demand and shortages of construction machinery operators.」

    The shortage of operators was reflected in full-year results as a factor contributing to the difficult business environment in the construction equipment business.
  2. 2026-05-12WorsenedEarnings

    「In addition to continued sluggish purchasing sentiment due to persistently high product prices, the business remained in a difficult environment owing to declining public- and private-sector construction demand and shortages of construction machinery operators.」

    Shortages of construction machinery operators became an actual factor contributing to the difficult business environment during the period.
  3. FY2023WorsenedAnnual report

    「The uncertain business environment is expected to continue due to the impact of longer lead times caused by parts shortages, soaring construction material prices, and increasingly severe labor shortages.」

    Regarding labor shortages at construction sites, the company described the issue as the "increasing severity of labor shortages," rather than the previously cited shortage of operators, and included it alongside soaring construction material prices and longer lead times as a factor contributing to uncertainty in the next fiscal year.
  4. FY2022-Q2First statedAnnual report

    「As the impact of longer lead times for construction equipment due to shortages of operators and parts at construction sites became more pronounced,」

    A shortage of operators at construction sites was mentioned for the first time as a factor in the business environment in which longer lead times for construction equipment have become pronounced.
Moved together

"Fluctuations in Product and Raw Material Prices and Rental Asset Prices" moved the same way as this thread, in the same document, in 3 of its 6 moves.

32222★12345
  1. ★This thread
  2. 1Fluctuations in Product and Raw Material Prices and Rental Asset Prices3×
  3. 2The Silicon Cycle in the Semiconductor and Electronic Components Market2×
  4. 3Cautious Capital Investment Due to Geopolitical Risks and Uncertainty in the Global Economy2×
  5. 4Restructuring of the Construction Machinery Business2×
  6. 5Strengthening the Internal Audit and Compliance Framework2×

★ is this thread; numbers match the list above. The number on a line is how many documents both moved the same way in; lines between the other threads count the documents they moved together in too. Threads that move together often sit closer.

When this could move next
No upcoming earnings preview for Nanyo yet. It last moved in the Revision of earnings forecasts of 2026-10-19: "Restated".
News
No news is linked to this thread yet. When an article touches it, it will appear here by date.
Risk of longer lead times due to a shortage of operators at construction sites | NANYO CORPORATION (7417) | Komori