Production Capacity Shortfall During Demand Surges

First written in FY2023. 2 of 7 entries say "Mitigated", first in FY2026-H1. Latest entry: FY2026.

7entries
4years
2from disclosures
Share on X
How it moved
ProgressHeldSoftenedWorseFirst statedFY2023SoftenedFY2024MitigatedFY2026-H1 – 2026-09-072023: 120232024: 120242025: 120252026: 42026
Same theme, other companies
Order constraints due to capacity limits at existing factoriesA theme 15 companies write about · 15 as a headwind · 0 as a tailwind

AeroEdge moved to the "Worse" side of this theme in 2024, 2 years before the typical company in this theme (2026).

The whole theme swung hardest in 2020: 2 of 7 companies on the "Worse" side.

2 other companies' latest entry also says "Restated".

Ridges = years it wrote progress, valleys = years it wrote worse. Most hopeful companies at the back. Drag to turn, scroll to zoom, right-drag to pan. On a phone, two fingers turn and pinch to zoom; one finger scrolls the page.
Showing 14 of the 15 companies compared. The sentences above are computed from all 15.
Full recordFilings, disclosures and news, newest first
  1. FY2026RestatedAnnual report

    「Our Group continues to enhance production capacity by improving productivity and will respond to ensure that production capacity does not become insufficient by making the necessary capital investments and taking other measures.」

    The Group continues to improve productivity and make capital investments to address growth in demand and market share, but has not indicated that the required capacity has been fully secured.
  2. FY2026-H1MitigatedAnnual report

    「In addition, we made capital investments to strengthen production capacity in response to the expanded market share.」

    Capital investment to strengthen production capacity was made in response to the risk of insufficient capacity following the share increase. Completion of the required capacity was not reported.
  3. FY2025WorsenedAnnual report

    「To respond to expanding demand and market share, we need to make capital investments and otherwise strengthen production capacity going forward.」

    In response to demand growth, including the market-share increase from January 2028, the company stated that capacity strengthening through capital investment and other measures is necessary rather than relying solely on existing capacity.
  4. FY2024SoftenedAnnual report

    「Regarding titanium-aluminide blade production, assuming a stable supply of materials, we have secured sufficient production capacity to withstand the expected production increase over the next 3 years.」

    The period for which production capacity is expected to be sufficient was shortened from the previously stated 3 to 5 years to approximately 3 years.
  5. FY2023First statedAnnual report

    「We have secured sufficient production capacity to withstand the expected production increase over the next 3 to 5 years. However, if orders increase beyond expectations and we are unable to secure sufficient capacity, resulting in supply delays, we could lose the trust of our customer, French SAFRAN, and future transactions with the company could be adversely affected.」

    The company will continue improving productivity and plans to make capital investments if orders increase beyond expectations.
Moved together

"Winning new volume-production programs for aircraft components and non-aircraft products" moved the same way as this thread, in the same document, in 3 of its 7 moves.

333222★123456
  1. ★This thread
  2. 1Winning new volume-production programs for aircraft components and non-aircraft products3×
  3. 2Development of New Material for Titanium-Aluminum Blades3×
  4. 3Reliance on Interest-Bearing Debt and Financing Constraints3×
  5. 4Increasing production of core products and expanding profitability while limiting large-scale capital investment2×
  6. 5High dependence on Safran and titanium-aluminum blades2×
  7. 6Construction of a second factory and capital investment for new projects2×

★ is this thread; numbers match the list above. The number on a line is how many documents both moved the same way in; lines between the other threads count the documents they moved together in too. Threads that move together often sit closer.

When this could move next
No upcoming earnings preview for AeroEdge yet. It last moved in the Management plan of 2026-09-07: "Advanced".
News
No news is linked to this thread yet. When an article touches it, it will appear here by date.
Production Capacity Shortfall During Demand Surges | AeroEdge Co.,Ltd (7409) | Komori