Komori
AeroEdge (7409) · InitiativeAdvanced

Winning new volume-production programs for aircraft components and non-aircraft products

First written in FY2023. 12 of 17 entries say "Advanced", first in FY2024-Q2. Latest entry: FY2026.

17entries
4years
8from disclosures
Share on X
How it moved
ProgressHeldSoftenedWorseAdvancedFY2024 – FY20262023: 220232024: 320242025: 220252026: 102026
Same theme, other companies
Securing New Mass-Production Projects for Aircraft, Gas Turbines and Other ApplicationsA theme 1 companies write about · 0 as a headwind · 1 as a tailwind

No other company in this theme has enough history to compare yet.

Full recordFilings, disclosures and news, newest first
  1. FY2026AdvancedAnnual report

    「For new projects, we are working in parallel at the new plant completed in 2024 to launch mass production of 2 aircraft engine components different from those for LEAP engines, and began mass production of 1 of them during the consolidated fiscal year.」

    Of the 2 new aircraft engine components being launched at the new plant, 1 has progressed to the start of mass production.
  2. FY2026-H1AdvancedAnnual report

    「With respect to new mass-production projects, we worked in parallel to launch mass production of 2 aircraft engine components different from those for LEAP engines at the new plant completed in 2024, and prepared for mass production to begin in the second half of the current fiscal year.」

    The company launched mass production of 2 aircraft engine components other than LEAP engine components simultaneously at the new plant and progressed to the preparation stage for production to begin in the second half of the current fiscal year.
  3. FY2025AdvancedAnnual report

    「We are currently launching mass production simultaneously for 2 aircraft engine components other than those for LEAP engines at the new plant completed in June 2024.」

    The company explicitly stated that it is simultaneously launching mass production of 2 aircraft engine components other than LEAP engine components at the new plant.
  4. FY2025-H1AdvancedAnnual report

    「With respect to new mass-production projects, we are currently establishing a mass-production structure for aircraft engine components scheduled to be produced at the new plant completed in June 2024, and have newly entered into a long-term agreement to supply components to a major global aerospace manufacturer.」

    In addition to aircraft engine components scheduled to be produced at the new plant, the company newly entered into a long-term component supply agreement with a major global aerospace manufacturer.
  5. FY2024AdvancedAnnual report

    「In terms of expenses, personnel costs increased because we accelerated recruitment to acquire and expand other new mass-production projects and to develop mass-production technology and establish a mass-production structure for aircraft engine components other than titanium-aluminide blades, with mass production targeted to begin during the following fiscal year.」

    The company is pursuing technology development, establishing a mass-production structure and strengthening recruitment, with mass production of aircraft engine components other than titanium-aluminide blades targeted to begin during the following fiscal year.
  6. FY2024-Q3RestatedAnnual report

    「In terms of expenses, personnel costs increased because we accelerated recruitment to acquire and expand other new mass-production projects and to develop mass-production technology and establish a mass-production structure for aircraft engine components other than titanium-aluminide blades, with mass production targeted to begin during the following fiscal year.」

    The company continues developing technology and establishing a mass-production structure for aircraft engine components other than titanium-aluminide blades, targeting the start of mass production during the following fiscal year. No completed start of mass production was reported.
  7. FY2024-Q2AdvancedAnnual report

    「Construction of a new plant and development of mass-production technology for new mass-production projects involving aircraft engine components other than titanium-aluminide blades, for which orders are expected, progressed generally as planned.」

    Construction of the new plant and development of mass-production technology progressed generally as planned for new mass-production projects involving aircraft engine components other than titanium-aluminide blades.
  8. FY2024-Q1RestatedAnnual report

    「Strengthening recruitment to acquire and expand new mass-production projects」

    The company describes stronger recruitment to acquire and expand new mass-production projects, but reports no specific achievement such as winning a project.
  9. FY2023First statedAnnual report

    「We will use the technology, experience and funds gained through mass-production processing of titanium-aluminide blades to pursue new mass-production projects for aircraft components.」

    Potential new projects include aircraft engine components, gas-turbine components and eVTOL components.
Moved together

"Diversifying earnings away from dependence on titanium aluminide blades" moved the same way as this thread, in the same document, in 9 of its 17 moves.

997655★123456
  1. ★This thread
  2. 1Diversifying earnings away from dependence on titanium aluminide blades9×
  3. 2Development of New Material for Titanium-Aluminum Blades9×
  4. 3Construction of a second factory and capital investment for new projects7×
  5. 4Lower Investment Units and Improved Liquidity Through a Stock Split6×
  6. 5Long-Term Supply Base for Titanium-Aluminum Blades for LEAP5×
  7. 6High order backlog for LEAP-equipped aircraft amid the recovery in air travel demand5×

★ is this thread; numbers match the list above. The number on a line is how many documents both moved the same way in; lines between the other threads count the documents they moved together in too. Threads that move together often sit closer.

When this could move next
No upcoming earnings preview for AeroEdge yet. It last moved in the Management planning of 2026-09-07: "Advanced".
News
No news is linked to this thread yet. When an article touches it, it will appear here by date.
Winning new volume-production programs for aircraft components and non-aircraft products | AeroEdge Co.,Ltd (7409) | Komori