Komori
Sanoyas Holdings (7022) · InitiativeAdvanced

Research and Development and the Use of 3D CAD and Monitoring Technologies

First written in FY2016. 3 of 4 entries say "Advanced", first in FY2017. Latest entry: FY2021.

4entries
6years
0from disclosures
Share on X
How it moved
ProgressHeldSoftenedWorseFirst statedFY2016AdvancedFY2017 – FY20212016: 120162017: 120172018: 020182019: 120192020: 020202021: 12021
Same theme, other companies
Advancing vessel development through hull-form development, monitoring of actual vessels and 3D CADA theme 1 companies write about · 0 as a headwind · 1 as a tailwind

No other company in this theme has enough history to compare yet.

Full recordFilings, disclosures and news, newest first
  1. FY2021AdvancedAnnual report

    「As a proprietary initiative, monitoring equipment was installed on individual Panamax bulk carriers, establishing a system for evaluating the latest hull form's performance in actual sea conditions.」

    In addition to improving 3D-CAD functions, the company installed monitoring equipment on individual vessels and established a system for evaluating performance in actual sea conditions.
  2. FY2019AdvancedAnnual report

    「Regarding the development of 3D-CAD (FORAN), the core design system, efforts during the fiscal year focused on further expanding its application areas and enhancing its functions, resulting in further functional improvements to the system for aggregating managed quantities such as painted surface areas and weld lengths, which has been applied to actual vessels. In addition, development was conducted to expand the scope of practical use of the 3D model viewer and improve its usability.」

    The company further expanded the application areas and functions of 3D-CAD and moved on to improving the functions of the system for aggregating managed quantities already applied to actual vessels and the 3D model viewer.
  3. FY2017AdvancedAnnual report

    「Regarding the development of 3D-CAD (FORAN), the core design system, efforts continued during the fiscal year to further expand its application areas, enhance its functions and strengthen integration with peripheral systems, leading to the practical implementation of a new 3D tool for aggregating managed quantities such as painted surface areas and weld lengths.」

    The company expanded the application areas and integration of 3D-CAD and put a 3D tool for aggregating painted surface areas and weld lengths into practical use.
  4. FY2016First statedAnnual report

    「Regarding the development of 3D-CAD (FORAN), the core design system, efforts continued during the fiscal year to expand its application areas, enhance its functions and strengthen integration with peripheral systems, leading to the introduction of a new 3D tool for aggregating managed quantities such as weld lengths.」

    To strengthen product competitiveness and improve productivity, the company is expanding the application of hull-form development, actual-vessel monitoring and 3D-CAD.
Moved together

"Ship Design Development to Improve Energy Efficiency and Meet Environmental Regulations" moved the same way as this thread, in the same document, in 3 of its 4 moves.

332222★123456
  1. ★This thread
  2. 1Ship Design Development to Improve Energy Efficiency and Meet Environmental Regulations3×
  3. 2Expansion of the Repair Vessel, LPG Vessel Tank and Food Tank Businesses3×
  4. 3Strengthening Development and Order-Taking Activities in the Land-Based Business2×
  5. 4Strengthening the production system through plant rebuilding and production equipment upgrades2×
  6. 5Granting Stock Options to Directors, Corporate Auditors and Executive Officers2×
  7. 6Exchange-Rate Fluctuations Associated with Imports, Exports, and Foreign-Currency-Denominated Contracts2×

★ is this thread; numbers match the list above. The number on a line is how many documents both moved the same way in; lines between the other threads count the documents they moved together in too. Threads that move together often sit closer.

When this could move next
Sanoyas Holdings's next results are scheduled for 2026-10-29. Read the earnings preview
News
No news is linked to this thread yet. When an article touches it, it will appear here by date.
Research and Development and the Use of 3D CAD and Monitoring Technologies | Sanoyas Holdings Corporation (7022) | Komori