Strengthening the production system through plant rebuilding and production equipment upgrades
First written in FY2016. 11 of 13 entries say "Advanced", first in FY2017-Q1. Latest entry: 2026-10-29.
No other company in this theme has enough history to compare yet.
- 2026-10-29AdvancedResults presentation
「2025年11月に着工したサノヤス精密工業の新工場の建屋が、9月30日(水)に完成しました。2027年3月中の新工場全体での稼働をめざして、各種移転作業・調整などを進めていく予定です。」
サノヤス精密工業の新工場について、建屋完成から機械・ロボットの移設、テスト運用を経た2027年3月中の全体稼働を目指す段階へ進んだ。 - FY2026AdvancedAnnual report
「サノヤス精密工業㈱ began rebuilding its drive-shaft production plant, whose buildings had deteriorated, with completion scheduled for March 2027. This will improve the working environment in the existing processing operations and secure space for installing new processing equipment, supporting the expansion of the business. In addition, ハピネスデンキ㈱ began rebuilding its Chugoku branch because the company-owned building had deteriorated, with completion scheduled for April 2027.」
The company began rebuilding the aging drive-shaft production plant and the Chugoku branch of ハピネスデンキ㈱, with completion scheduled for 2027. - FY2021-Q1AdvancedAnnual report
「For the gas tank business developed to complement its newbuilding business, the company made the Gas Tank Sales Department and Gas Tank Design Department independent as the Gas Tank Business Department, effective 1 April 2020. It is expanding and strengthening its gas-related businesses by installing LPG tank production facilities at the Mizushima Works (Kurashiki, Okayama) in addition to the Osaka Works (Osaka, Osaka).」
The scope of the production capacity enhancement initiative was expanded to include the Mizushima plant, where LPG tank manufacturing equipment was installed. - FY2019AdvancedAnnual report
「サノヤス精密工業㈱, which is primarily engaged in precision machining, consolidated its 3 production bases in the Kansai region in Sanda, Hyogo Prefecture, where its head office is located, and had been constructing a new factory to further improve production efficiency. Phase 2 was completed in March 2019, completing the relocation. In addition, ㈱大鋳 (Takatsuki, Osaka; merged with サノヤス・エンジニアリング㈱ effective 1 April 2019), which manufactures and sells shot-blasting machines and other equipment, acquired land adjacent to its Miyazaki factory and expanded the factory to approximately 1.5 times its previous size.」
For サノヤス精密工業㈱'s consolidation of its 3 bases, Phase 2 was completed and the relocation was completed. ㈱大鋳 also completed construction to expand its Miyazaki factory to approximately 1.5 times its previous size. - FY2019-Q2AdvancedAnnual report
「㈱大鋳 (Takatsuki, Osaka), which manufactures and sells shot-blasting machines and other equipment, acquired land adjacent to its Miyazaki factory, and in August 2018 completed construction to expand the factory to approximately 1.5 times its previous size.」
Following the acquisition of land adjacent to its Miyazaki factory, ㈱大鋳 completed construction in August 2018 to expand the factory to approximately 1.5 times its previous size. - FY2019-Q1AdvancedAnnual report
「サノヤス精密工業㈱, which is primarily engaged in precision machining, is consolidating its 3 production bases in the Kansai region in Sanda, Hyogo Prefecture, where its head office is located, and is currently constructing a new factory to further improve production efficiency. Phase 1 was completed in March 2018, and Phase 2 is currently under construction. ㈱大鋳 (Takatsuki, Osaka), which manufactures and sells shot-blasting machines and other equipment, acquired land adjacent to its Miyazaki factory in May 2018 and began expanding the factory.」
サノヤス精密工業㈱ completed Phase 1 of the consolidation of its 3 Kansai bases in Sanda and moved on to Phase 2. ㈱大鋳 also acquired land adjacent to its Miyazaki factory and began the expansion. - FY2018-Q2AdvancedAnnual report
「サノヤス精密工業㈱, which was established on 1 April 2017 through the integration of 3 group companies, is primarily engaged in precision machining. It is consolidating its production bases in the Kansai region in Sanda, Hyogo Prefecture, where its head office is located, and is proceeding with construction of a new factory to further improve production efficiency.」
The company is consolidating its precision machining production bases in Sanda, Hyogo Prefecture, and is proceeding with construction of a new factory to improve production efficiency. - FY2018-Q1RestatedAnnual report
「At the Mizushima and Osaka plants, the company is replacing aging equipment and introducing labor-saving equipment over 3 years starting in fiscal 2016, and in fiscal 2017 is proceeding with the replacement of 1 jib crane and other equipment.」
The company is continuing its 3-year plan to replace aging equipment and introduce labor-saving equipment at both plants, as well as the replacement of 1 jib crane in fiscal 2017. - FY2017AdvancedAnnual report
「In addition, at the Mizushima and Osaka plants, the company is planning to replace aging equipment and introduce labor-saving equipment over 3 years starting this fiscal year. In fiscal 2016, it replaced dock gates and transfer carts at the Mizushima and Osaka plants. In fiscal 2017, it is proceeding with the replacement of jib cranes and other equipment.」
Under the 3-year plan, the company completed the replacement of dock gates and transfer carts in fiscal 2016 and has moved on to replacing jib cranes in fiscal 2017. - FY2017-Q3AdvancedAnnual report
「In addition, at the Mizushima and Osaka plants, the company is planning to replace aging equipment and introduce labor-saving equipment over 3 years starting this fiscal year. In fiscal 2016, it is proceeding with the replacement of dock gates and transfer carts at the Mizushima and Osaka plants, and in fiscal 2017, with the replacement of jib cranes and other equipment.」
The company has identified the equipment targeted for replacement in each fiscal year under its 3-year plan to replace aging equipment and introduce labor-saving equipment, and is proceeding with the replacements. A new factory for manufacturing machinery for cosmetics was also completed in November 2016. - FY2017-Q2AdvancedAnnual report
「At the Mizushima and Osaka plants, the Group plans over 3 years from the current fiscal year to renew aging equipment and introduce labor-saving equipment. In fiscal 2016, it planned to renew the dock gates and transport carts at both plants, and in fiscal 2017, to renew jib cranes and other equipment.」
For both plants, the company has set out specific plans for replacing aging equipment and introducing labor-saving equipment over a 3-year period, identifying the equipment targeted in each fiscal year. - FY2017-Q1AdvancedAnnual report
「At the Mizushima and Osaka plants, the Group is renewing key equipment, including jib cranes, to improve work efficiency and meet medium- to long-term demand.」
The Mizushima and Osaka plants are moving ahead with specific renewals of key equipment, including jib cranes. - FY2016First statedAnnual report
「The factory for manufacturing cosmetics machinery is currently being rebuilt and its production equipment renewed. In addition, the Group plans to rebuild its automotive-parts manufacturing factory.」
The cosmetics machinery factory is being rebuilt and its equipment renewed, and the rebuilding of the automotive-parts factory is also planned.