Virtual Power Plant Demonstration and Operation of Energy Storage Systems
First written in FY2017. 5 of 6 entries say "Advanced", first in FY2020. Latest entry: FY2026.
0 other companies' latest entry also says "Advanced".
- FY2026AdvancedAnnual report
「The Group is participating in multiple power system demonstration projects, not limited to equipment development, and is contributing to the deployment of advanced systems in society.」
The company is participating in multiple power system demonstrations related to storage batteries and renewable energy, and is advancing the deployment and delivery of megawatt-class equipment, VSG controls and simulator power supplies. - FY2025AdvancedAnnual report
「Delivered battery DC/DC converters, photovoltaic power DC/DC converters and other equipment to the Toyohashi Microgrid in Toyohashi, Aichi Prefecture.」
The company delivered battery and photovoltaic power converters to the Toyohashi Microgrid, adding to its track record of demonstrating and deploying products related to energy storage and distributed power generation. - FY2024AdvancedAnnual report
「The Ministry of Economy, Trade and Industry's Virtual Power Plant Construction Demonstration Project confirmed a certain level of effectiveness, and the results have been accumulated as one of the company's energy management technologies.」
The company states that a certain level of effectiveness was confirmed through the VPP demonstration and that the results were accumulated internally as energy management technology. - FY2021AdvancedAnnual report
「We have conducted demonstration tests using residential and industrial storage batteries and electric vehicles as energy resources, with instantaneous charging and discharging in response to short-cycle load fluctuations in the power grid, and the expected results have been achieved. We will continue demonstrations and studies aimed at optimizing energy management for future commercialization this year as well.」
The VPP demonstration using residential and industrial storage batteries and electric vehicles has produced the expected results and has progressed to the stage of continuing demonstrations toward future commercialization. - FY2020AdvancedAnnual report
「Energy storage systems are currently operating at both the Shiga Plant and headquarters. In addition to optimizing the use of photovoltaic power, which is subject to substantial fluctuations, we are continuing demonstrations aimed at optimizing energy management by measuring energy, including consumption within the plant, in real time.」
Energy storage systems are operating at both the Shiga Plant and headquarters, and demonstrations of energy management, including real-time measurement, have entered the continuing phase. - FY2017First statedAnnual report
「This year, we newly installed an energy storage system at the Shiga Plant and are continuously conducting demonstrations aimed at optimizing energy management by managing in real time the energy, including photovoltaic power with substantial fluctuations over time and consumption within the plant.」
The company is participating in a virtual power plant construction demonstration project and has begun demonstrating real-time energy management following the installation of an energy storage system at the Shiga Plant.