Order Intake and Construction of Seismic-Resistant Underground Facilities Using Eco Park and Eco Cycle

First written in FY2016. 11 of 14 entries say "Advanced", first in FY2018. Latest entry: 2026-06-05.

14entries
11years
2from disclosures
Share on X
How it moved
ProgressHeldSoftenedWorseFirst statedFY2016AdvancedFY2018 – FY20232016: 12017: 020172018: 120182019: 220192020: 320202021: 120212022: 120222023: 120232024: 120242025: 120252026: 22026
Same theme, other companies
Contracted construction of earthquake-resistant underground parking and bicycle parking facilitiesA theme 1 companies write about · 0 as a headwind · 1 as a tailwind

No other company in this theme has enough history to compare yet.

Full recordFilings, disclosures and news, newest first
  1. FY2025RestatedAnnual report

    「Demand for EV Eco Park and Eco Cycle, which secure parking and bicycle parking spaces in cities that are essential for low-environmental-impact transportation, is expanding, as are revenues.」

    Eco Park and Eco Cycle are positioned as an opportunity to expand demand as EV-compatible urban infrastructure.
  2. FY2024ReframedAnnual report

    「Demand for EV Eco Park and Eco Cycle, which secure parking and bicycle parking spaces in cities that are essential for low-environmental-impact transportation, is expanding, as are revenues.」

    The positioning of Eco Park and Eco Cycle is being expanded beyond orders for and construction of conventional earthquake-resistant underground facilities to capture demand as EV-compatible urban infrastructure.
  3. FY2023AdvancedAnnual report

    「技研施工 completed construction of 2 mechanical bicycle parking facilities, “Eco Cycle,” at Ichinohashi Park in Minato-ku, Tokyo, with underground capacity for 400 bicycles in total. The facility opened in July as “Ichinohashi Park Bicycle Parking Facility,” operated by the ward. This brings Eco Cycle's nationwide delivery track record to 25 locations and 61 facilities.」

    2 Eco Cycle facilities were completed and opened at Ichinohashi Park, bringing cumulative deliveries nationwide to 25 locations and 61 facilities.
  4. FY2022AdvancedAnnual report

    「Construction of 2 mechanical bicycle parking facilities, “Eco Cycle,” the first of their kind in Katsushika-ku, Tokyo, was under way, with an underground capacity of 408 bicycles in total, and they opened in September. In addition, installation of Eco Cycle was approved near Shin-Tsunashima Station on the Tokyu Shin-Yokohama Line in Kohoku-ku, Yokohama, with an opening targeted for next spring, and Giken施工 received the construction order in June. This brings Eco Cycle's nationwide track record of adoption to 26 locations and 63 facilities, with the number continuing to increase.」

    2 facilities opened in Katsushika-ku, and a new order was received in Yokohama. Cumulative Eco Cycle adoption increased to 26 locations and 63 facilities nationwide.
  5. FY2021-Q2AdvancedAnnual report

    「In the underground development business, 2 Eco Cycle facilities were adopted for a large-scale private development in the southeast area of JR Shin-Koiwa Station in Katsushika-ku, Tokyo, and construction is under way for an opening around summer 2022 as a bicycle parking facility operated by the ward. Including these facilities, Eco Cycle installations will total 24 locations (59 facilities) nationwide.」

    2 Eco Cycle facilities were adopted in the southeast area of JR Shin-Koiwa Station in Katsushika-ku, Tokyo, and construction is under way for an opening around summer 2022. Cumulative installations increased to 24 locations and 59 facilities nationwide.
  6. FY2020AdvancedAnnual report

    「In the underground development business, we installed 1 mechanical underground bicycle parking facility, “Eco Cycle,” adjacent to the commercial building “Shibuya Fukuras (SHIBUYA FUKURAS)” in Shibuya-ku, Tokyo, and 2 facilities at the east exit of JR Kawasaki Station. This brings the nationwide total of Eco Cycle installations to 23 locations (57 facilities).」

    1 Eco Cycle facility was installed in Shibuya and 2 at the east exit of Kawasaki Station, confirming cumulative results of 23 locations and 57 facilities.
  7. FY2020-Q3AdvancedAnnual report

    「In the underground development business, 2 mechanical underground bicycle parking facilities, “Eco Cycle,” ordered by Kawasaki City were completed at the east exit of JR Kawasaki Station and opened on 1 April. This brings the nationwide total of Eco Cycle installations to 23 locations (57 facilities).」

    2 Eco Cycle facilities were completed and opened at the east exit of Kawasaki Station, bringing cumulative installations nationwide to 23 locations and 57 facilities.
  8. FY2020-Q1AdvancedAnnual report

    「In the underground development business, 1 mechanical underground bicycle parking facility, “Eco Cycle,” adjacent to the commercial building “Shibuya Fukuras (SHIBUYA FUKURAS)” in Shibuya-ku, Tokyo was completed and opened for use on 25 November. Although it was installed on a narrow, heavily trafficked site, our environmentally conscious construction methods were highly regarded based on our extensive track record in urban areas. Construction of 2 Eco Cycle facilities is currently under way near Kawasaki Station, bringing the nationwide total of Eco Cycle installations to 23 locations (57 facilities).」

    1 Eco Cycle facility was completed and opened for use in Shibuya, while 2 facilities are under construction near Kawasaki Station. Cumulative installations total 23 locations and 57 facilities.
  9. FY2019AdvancedAnnual report

    「In the underground development business, we installed 2 mechanical underground bicycle parking facilities, “Eco Cycle,” in Sumida-ku, Tokyo, and 2 mechanical underground parking facilities, “Eco Park,” at a private company building in Gotanda, Tokyo during the current period. Construction of 2 Eco Cycle facilities is also under way near Kawasaki Station. Including these facilities, cumulative results have reached 23 locations (57 facilities) for Eco Cycle and 3 locations (5 facilities) for Eco Park nationwide.」

    2 Eco Cycle facilities and 2 Eco Park facilities were installed, and construction of 2 facilities is under way near Kawasaki Station. Cumulative results have been updated to 23 locations and 57 facilities for Eco Cycle, and 3 locations and 5 facilities for Eco Park.
  10. FY2019-Q3AdvancedAnnual report

    「In the underground development business, 2 mechanical underground bicycle parking facilities, “Eco Cycle,” opened at the south exit of Kinshicho Station in Sumida-ku, Tokyo on 1 April, and 2 mechanical underground parking facilities, “Eco Park,” opened in Nishi-Gotanda, Shinagawa-ku, Tokyo on 20 May. Construction is also under way in Dogenzaka, Shibuya-ku, near Shibuya Station, and an order was received at the end of May for 2 Eco Cycle facilities near Kawasaki Station in Kanagawa Prefecture.」

    2 Eco Cycle facilities opened in Kinshicho and 2 Eco Park facilities opened in Nishi-Gotanda, while construction is under way in Shibuya and an order was received for 2 Eco Cycle facilities in Kawasaki, demonstrating progress in orders, construction and operations.
  11. FY2018AdvancedAnnual report

    「In the underground development business, the mechanical parking facility “Eco Park” has been selected for installation as the underground parking facility of an office building under construction in Nishi-Gotanda, Shinagawa-ku, while the mechanical bicycle parking facility “Eco Cycle” has been selected for Sumida-ku's “(tentative name) Construction of a Mechanical Bicycle Parking Facility at the South Exit of Kinshicho Station,” raising expectations for further expansion of adoption.」

    Specific progress in orders and construction is described, including the decision to install Eco Park and the adoption of Eco Cycle for a public works project.
  12. FY2016First statedAnnual report

    「By developing our core jacking technology, we receive orders for and construct the earthquake-resistant underground parking facility “Eco Park” and earthquake-resistant underground bicycle parking facility “Eco Cycle” under the concept of “culture above ground, functionality underground.”」

    The underground development business, which develops jacking technology and receives orders for and constructs earthquake-resistant underground parking and bicycle parking facilities, is described.
Moved together

"Global Expansion Through Packaging of the Implant Construction Method" moved the same way as this thread, in the same document, in 8 of its 14 moves.

888775★123456
  1. ★This thread
  2. 1Global Expansion Through Packaging of the Implant Construction Method8×
  3. 2Recognition of the advantages of the implant construction method and its expanding adoption in various regions8×
  4. 3Increase in Capital and Capital Reserve Through Exercise of Stock Acquisition Rights8×
  5. 4Development of Equipment and Construction Methods for Diverse Construction Conditions, Pile Materials and Large-Diameter Piles7×
  6. 5Expansion of the Press-Fit Market Through Broader Applications and Coverage Areas7×
  7. 6Expanding and upgrading the machinery fleet to expand the hydraulic piling equipment rental business5×

★ is this thread; numbers match the list above. The number on a line is how many documents both moved the same way in; lines between the other threads count the documents they moved together in too. Threads that move together often sit closer.

When this could move next
Giken's next results are scheduled for 2026-10-09. Read the earnings preview It last moved in the Other Disclosures of 2026-06-05: "Advanced".