EnBio Holdings,Inc (6092) · InitiativeReframedLatest M&A and Subsidiary Changes (2026-10-16): "Advanced"

Expansion of the renewable energy business

First written in FY2016. 37 of 48 entries say "Advanced", first in FY2017-Q1. Latest entry: 2026-10-16.

48entries
11years
14from disclosures
Share on X
How it moved
ProgressHeldSoftenedWorseAdvancedFY2017-Q1 – FY2019-Q3AdvancedFY2020-Q3 – 2026-05-152016: 320162017: 420172018: 320182019: 420192020: 320202021: 420212022: 420222023: 420232024: 220242025: 220252026: 152026
Same theme, other companies
Renewable Energy Power Generation Facility Development and Sales ModelA theme 6 companies write about · 0 as a headwind · 6 as a tailwind

2 other companies' latest entry also says "Advanced".

Ridges = years it wrote progress, valleys = years it wrote worse. Most hopeful companies at the back. Drag to turn, scroll to zoom, right-drag to pan. On a phone, two fingers turn and pinch to zoom; one finger scrolls the page.
Full recordFilings, disclosures and news, newest first
  1. FY2026ReframedAnnual report

    「Having achieved the “Medium-Term Management Plan 2026” target of 100MW in total solar power generation capacity, we will shift our strategy from a long-term recovery model based on holding assets to a capital recycling model that repeatedly recovers and reinvests capital through the development and sale of solar power plants and grid-scale battery storage facilities, as well as asset management.」

    Having achieved the target of 100MW in total solar power generation capacity, the strategy is shifting from a model of holding generation assets long term to a capital recycling model based on development, sale and asset management. In terms of results, domestic and overseas solar power plants totaled 63 sites with 64.2MW of capacity, while generation capacity involving the Group reached 103.7MW.
  2. FY2026-H1AdvancedAnnual report

    「As of the end of the interim consolidated accounting period, domestic and overseas solar power plants totaled 61 sites with total generation capacity of 61.5MW. The service supplying renewable electricity, including off-site PPAs, also progressed smoothly. Development investment in solar power plants in Indonesia brought operating generation capacity in the country to 30MW. Including this capacity, the Group's generation capacity involving its projects increased to 91.5MW.」

    Domestic and overseas solar power plants totaled 61 sites with 61.5MW of capacity, while operating generation capacity in Indonesia reached 30MW and generation capacity involving the Group, including Indonesia, expanded to 91.5MW. The electricity supply service, including off-site PPAs, also progressed smoothly.
  3. FY2025AdvancedAnnual report

    「As of the end of the fiscal year, domestic and overseas solar power plants totaled 55 sites with total generation capacity of 54MW. Demand for clean energy remained high, and we are focusing on gathering information on new projects, including overseas secondary power plants and corporate PPA projects, and considering new business models using renewable energy, including business models using storage batteries and thin, lightweight solar cells, including perovskite cells. Following development investment in solar power plants in Indonesia, the Group's generation capacity involving Indonesia totaled 72MW, including 18MW of operating capacity in the country.」

    Power plants totaled 55 sites with 54MW of capacity, while generation capacity involving Indonesia expanded to 72MW. Consideration expanded beyond PPAs to new business models involving storage batteries, perovskite cells and other technologies.
  4. FY2025-H1AdvancedAnnual report

    「As of the end of the interim consolidated accounting period, domestic and overseas solar power plants totaled 54 sites with total generation capacity of 51MW. All power plants were operating broadly as expected. Development investment in solar power plants in Indonesia brought operating generation capacity in the country to 14MW. Including this capacity, the generation capacity involving the Group increased to 65MW.」

    Domestic and overseas solar power plants totaled 54 sites with 51MW of capacity. Operating generation capacity in Indonesia reached 14MW, and generation capacity involving the Group, including Indonesia, expanded to 65MW.
  5. FY2024-Q3AdvancedAnnual report

    「As of the end of the third quarter, domestic and overseas solar power plants, including those under development, totaled 50 sites with total generation capacity of 49MW… Following development investment in solar power plants in Indonesia, operating solar power plants in Indonesia had generation capacity of 6.3MW, bringing total generation capacity including Indonesia to 55.3MW.」

    Domestic and overseas solar power plants, including those under development, expanded to 50 sites with 49MW of capacity. Development investment in Indonesia brought operating generation capacity in the country to 6.3MW and total generation capacity including Indonesia to 55.3MW.
  6. FY2024-Q2AdvancedAnnual report

    「As of the end of the second quarter, domestic and overseas renewable energy power plants, including those under development, totaled 48 sites with total generation capacity of 48MW. Although electricity sales revenue fell below plan due to the impact of output curtailment in the service areas of Kyushu Electric Power, Chugoku Electric Power and Tohoku Electric Power, revenue increased because sales of the newly launched renewable electricity supply service performed well. Demand for clean energy remained high, and we are focusing on gathering information on new projects, including overseas projects, and considering secondary power plants, corporate PPA projects and new business models using renewable energy. As part of these efforts, we began considering a renewable energy business in Indonesia through a capital and business alliance with Alamport Renewables Pte. Ltd.,.」

    Renewable energy power plants, including those under development, expanded to 48 sites with 48MW of capacity, and sales of the renewable electricity supply service progressed. We also began considering an Indonesian business through a capital and business alliance.
  7. FY2024-Q1AdvancedAnnual report

    「As of the end of the first quarter, domestic and overseas renewable energy power plants, including those under development, totaled 47 sites with total generation capacity of 47MW. Due to the impact of output curtailment in the service areas of Kyushu Electric Power, Chugoku Electric Power and Tohoku Electric Power, electricity sales revenue fell below plan, resulting in lower revenue and profit. Demand for clean energy nevertheless remained high, and we are focusing on gathering information on new projects, including overseas projects, and considering secondary power plants, corporate PPA projects and new business models using renewable energy.」

    While maintaining 47 renewable energy power plants with 47MW of capacity, the scope of consideration was expanded to secondary power plants, corporate PPAs and new business models.
  8. FY2023AdvancedAnnual report

    「As of the end of the fiscal year, domestic and overseas renewable energy power plants, including those under development, totaled 47 sites with total generation capacity of 47MW, of which approximately 44MW was operational… Jordan Project No. 5 was completed as planned and commenced operations in January 2023. Dubai Project No. 1 was also completed and commenced operations in April 2023. Construction of the biomass power plant in Turkey was completed and it commenced operations in March 2023.」

    Renewable energy power plants, including those under development, expanded to 47 sites with 47MW of capacity, of which approximately 44MW was operational. Jordan Project No. 5, Dubai Project No. 1 and the biomass power plant in Turkey progressed to completion and the commencement of operations.
  9. FY2023-Q3AdvancedAnnual report

    「As of the end of the third quarter, domestic and overseas renewable energy power plants, including those under development, totaled 47 sites with total generation capacity of 47MW, of which approximately 42MW was operational. Stable electricity sales revenue was generated from each owned and managed power plant, broadly in line with plan. In response to growing demand for clean energy, we are focusing on gathering information on new projects, including overseas projects, and considering secondary power plants, corporate PPA projects and new business models using renewable energy. Jordan Project No. 5 was completed as planned in January 2023. Dubai Project No. 1, which had been scheduled for completion in January 2023, has been rescheduled for completion in March 2023.」

    Domestic and overseas renewable energy power plants, including those under development, expanded from 41 sites and 46MW to 47 sites and 47MW, with approximately 42MW operational. Jordan Project No. 5 was completed, and the scope of consideration was expanded to secondary power plants, corporate PPAs and new business models.
  10. FY2023-Q2AdvancedAnnual report

    「As of the end of the second quarter, domestic and overseas renewable energy power plants, including those under development, totaled 41 sites with total generation capacity of 46MW, of which approximately 42MW was operational. Stable electricity sales revenue was generated from each owned and managed power plant, broadly in line with plan. Jordan Project No. 5, scheduled for completion in January 2023, was progressing as planned, while Dubai Project No. 1, also scheduled for completion in January 2023, was progressing broadly as planned.」

    Renewable energy power plants, including those under development, totaled 41 sites with 46MW of capacity, of which approximately 42MW was operational. Jordan Project No. 5 and Dubai Project No. 1 were also progressing broadly as planned.
  11. FY2023-Q1AdvancedAnnual report

    「As of the end of the first quarter, domestic and overseas renewable energy power plants, including those under development, totaled 41 sites with total generation capacity of 46MW, of which approximately 40MW was operational. The approximately 2,235kW solar power plant under construction in Hokkaido was progressing as initially planned and commenced operations on 21 July 2022. Jordan Project No. 4 commenced operations on 1 April 2022. Development began on Project No. 5, scheduled for completion in January 2023. Dubai Project No. 1, which is under development and was scheduled for completion in November 2022, has been delayed slightly by approximately 1 to 2 months but is progressing broadly as planned.」

    Renewable energy power plants, including those under development, expanded to 41 sites with 46MW of capacity. The Hokkaido project and Jordan Project No. 4 commenced operations, and development began on Project No. 5. Meanwhile, completion of Dubai Project No. 1 has been delayed.
  12. FY2022AdvancedAnnual report

    「As of the end of the fiscal year, domestic and overseas renewable energy power plants, including those under development, totaled 40 sites with total generation capacity of 45MW, of which approximately 39.5MW was operational. We began development of a new approximately 2,000kW solar power plant in Hokkaido, scheduled for completion in July 2022.」

    Domestic and overseas power plants, including those under development, expanded to 40 sites with 45MW of capacity, of which approximately 39.5MW was operational. Expansion continued into the Hokkaido project, Jordan Project No. 4, the Dubai project and a biomass power plant in Turkey.
  13. FY2022-Q3AdvancedAnnual report

    「As of the end of the third quarter, 31 solar power plants with total generation capacity of 36,987kW were operating in Japan, while 3 overseas solar power plants with total generation capacity of 1,655kW were operating. The biomass gasification power generation project under development in Turkey is targeting commencement of operations during the current fiscal year. We also began construction of Jordan Project No. 4, a 540kW solar power plant. Our subsidiary アルタイル・ソーラー合同会社 acquired the rights and superficies for a solar power plant of approximately 2,000kW in Hokkaido and is preparing for construction. In addition, エンバイオC・エナジー株式会社, established through a joint investment with 株式会社シーアールイー, participated in a new FIT auction and won a bid at ¥10.25/kWh for 629.9kW. Preparations for construction of the generation facilities are currently under way.」

    Overseas operating solar power plants expanded to 3 sites with 1,655kW of capacity, with progress including construction of Jordan Project No. 4, acquisition of rights to an approximately 2,000kW project in Hokkaido, and a successful 629.9kW FIT bid by the joint venture with CRE.
  14. FY2022-Q2AdvancedAnnual report

    「As of the end of the second quarter, 31 solar power plants with total generation capacity of 36,987kW were operating in Japan, and 1 overseas solar power plant with total generation capacity of 705kW was operating. Jordan Projects No. 2 and No. 3 were completed and commenced operations in October 2021. The biomass gasification power generation project under development in Turkey is targeting commencement of operations during the current fiscal year. During the second quarter, we established エンバイオC・エナジー株式会社 through a joint investment with 株式会社シーアールイー (CRE). Its principal business is supplying green electricity using the roofs of CRE's logistics facilities, “Logi Square,” and we will focus on actively expanding the business.」

    While maintaining operations at 31 domestic sites with 36,987kW and 1 overseas site with 705kW, expansion continued through the completion and commencement of operations of Jordan Projects No. 2 and No. 3, development of biomass gasification power generation in Turkey, and a green electricity business using logistics-facility roofs.
  15. FY2022-Q1AdvancedAnnual report

    「As of the end of the first quarter, 31 solar power plants with total generation capacity of 36,987kW were operating in Japan, and 1 overseas solar power plant with total generation capacity of 705kW was operating. A new 748kW solar power plant was completed in Chiba City and commenced operations on 12 April 2021. We also began development of Projects No. 2 and No. 3 in Jordan. The biomass gasification power generation project under development in Turkey is targeting commencement of operations during the current fiscal year. We invested in Japan Energy Capital 1 Fund, an overseas-focused decarbonized energy fund whose principal investment targets are renewable energy projects in Turkey and Jordan.」

    Domestic solar power plants increased to 31 sites with 36,987kW of capacity, and the Chiba City facility commenced operations. Expansion continued into Jordan Projects No. 2 and No. 3, biomass gasification power generation in Turkey, and investment in an overseas-focused fund.
  16. FY2021AdvancedAnnual report

    「As of the end of the fiscal year, 30 solar power plants with total generation capacity of 36,239kW were operating in Japan. The planned solar power plant in Jordan also commenced operations, bringing the number of overseas solar power plants to 1, with total generation capacity of 705kW. A new 748kW solar power plant was completed in Chiba City and commenced operations on 12 April 2021. We also began development of Projects No. 2 and No. 3 in Jordan.」

    Maintained operations at 30 domestic sites with 36,239kW of capacity, while Jordan Project No. 1 commenced operations and development began on Projects No. 2 and No. 3. The 748kW facility in Chiba City was also completed.
  17. FY2021-Q3AdvancedAnnual report

    「We began preparations to construct a new solar power plant (748kW) in Chiba City. Operations are scheduled to commence in the following fiscal year. We also began development of Projects No. 2 and No. 3 in Jordan.」

    Began preparations to construct a 748kW solar power plant in Chiba City, with operations scheduled to commence in the following fiscal year, and began development of Projects No. 2 and No. 3 in Jordan.
  18. FY2021-Q2AdvancedAnnual report

    「As of the end of the second quarter, 30 solar power plants with total generation capacity of 36,239 kW were in operation in Japan. The planned solar power plant in Jordan also began operations, bringing overseas operating capacity to 1 plant with total generation capacity of 705 kW.」

    While maintaining 30 operating domestic solar power plants with total capacity of 36,239 kW, the planned solar power plant in Jordan began operations, bringing overseas operating facilities to 1 plant with total capacity of 705 kW.
  19. FY2021-Q1AdvancedAnnual report

    「As of the end of the first quarter, 30 solar power plants with total generation capacity of 36,239 kW were in operation. The Company is currently developing a solar power plant in Jordan and a biomass power plant in Turkey.」

    While maintaining 30 operating domestic plants with total capacity of 36,239 kW, the Company is progressing with overseas development of a solar power plant in Jordan and a biomass power plant in Turkey.
  20. FY2020-Q3AdvancedAnnual report

    「As of the end of the third quarter, 30 solar power plants with total generation capacity of 36,239 kW were in operation. Revenue and profit increased year on year, mainly owing to higher electricity sales revenue from the plant in Hakui District, Ishikawa Prefecture, the largest plant in the Group, which began operations in November 2018.」

    Operating solar power plants increased to 30 with total capacity of 36,239 kW, from 29 plants with total capacity of 35,614 kW in the previous quarter.
  21. FY2020-Q2RestatedAnnual report

    「As of the end of the second quarter, 29 solar power plants with total generation capacity of 35,614 kW were in operation. Revenue and profit increased substantially year on year, mainly owing to higher electricity sales revenue from the plant in Hakui District, Ishikawa Prefecture, the largest plant in the Group, which began operations in November of the previous year. As the environment surrounding domestic solar projects has become more challenging owing to lower FIT prices, the Company is focusing on gathering information on new projects, including overseas projects, and considering secondary projects.」

    Operating solar power plants remained unchanged from the previous quarter at 29 plants with total capacity of 35,614 kW. The Company continues to consider overseas and secondary projects in light of the profitability environment for domestic projects.
  22. FY2020-Q1AdvancedAnnual report

    「A new plant began operations in Kume District, Okayama Prefecture. As of the end of the first quarter, 29 solar power plants with total generation capacity of 35,614 kW were in operation. Revenue and profit increased substantially year on year, mainly owing to higher electricity sales revenue from the plant in Hakui District, Ishikawa Prefecture, the largest plant in the Group, which began operations in November of the previous year. As the environment surrounding domestic solar projects has become more challenging owing to lower FIT prices, the Company is focusing on gathering information on new projects, including overseas projects, and considering secondary projects.」

    The plant in Kume District, Okayama Prefecture, began operations, bringing operating solar power plants to 29 with total capacity of 35,614 kW. In light of the profitability environment for domestic projects, the Company has expanded its focus to overseas and secondary projects.
  23. FY2019ReframedAnnual report

    「Expansion of the renewable energy business will remain strategically important, but as the profitability of new domestic solar power projects has declined, the Company will consider new business development, including power generation businesses that could replace solar power generation and overseas expansion.」

    In response to declining profitability in new domestic solar power projects, the Company shifted toward expanding the means of growing its renewable energy business to include new businesses such as alternative power generation and overseas expansion.
  24. FY2019-Q3AchievedAnnual report

    「A new solar power plant in Hakui District, Ishikawa Prefecture, with total generation capacity of 13,893 kW, was completed and began operations. As of the end of the third quarter, 28 solar power plants with total generation capacity of 35,517.46 kW were in operation.」

    Operating solar power generation capacity reached 35,517.46 kW, exceeding the previously stated domestic target of 30 MW.
  25. FY2019-Q2AdvancedAnnual report

    「Two new plants began operations in Hanyu and Kasukabe, Saitama Prefecture. As of the end of the second quarter, 27 solar power plants with total generation capacity of 21,624.46 kW were in operation. The 13,893 kW plant under construction in Hakui District, Ishikawa Prefecture, is scheduled for completion and commencement of operations during the fiscal year ending March 2019.」

    Two plants in Hanyu and Kasukabe, Saitama Prefecture, began operations, bringing operating solar power plants to 27 with total capacity of 21,624.46 kW. The 13,893 kW plant in Hakui District, Ishikawa Prefecture, remains scheduled for completion and commencement of operations during the fiscal year ending March 2019.
  26. FY2019-Q1AdvancedAnnual report

    「A new plant in Moriya, Ibaraki Prefecture, began operations. As of the end of the first quarter, 25 solar power plants with total generation capacity of 19,700.74 kW were in operation. The 13,893 kW plant under construction in Hakui District, Ishikawa Prefecture, is scheduled for completion and commencement of operations during the fiscal year ending March 2019.」

    The plant in Moriya, Ibaraki Prefecture, began operations, bringing operating solar power plants to 25 with total capacity of 19,700.74 kW. The Company also indicated the completion and commencement-of-operations timing for the 13,893 kW plant in Hakui District, Ishikawa Prefecture.
  27. FY2018-Q3AdvancedAnnual report

    「As of the end of the third quarter, 22 solar power plants with total generation capacity of 15,759.04 kW were in operation. Two plants under construction or planned, in Hakui District, Ishikawa Prefecture, and Kuki, Saitama Prefecture, with total generation capacity of 14,397.9 kW, are scheduled to begin operations in stages. The Hakui solar power plant is scheduled to begin construction in the fiscal year ending March 2018 and be completed in the fiscal year ending March 2019. The 1,990 kW wood biomass power plant in Matsusaka, Mie Prefecture, operated by Biomass Power Technologies Co., Ltd., in which the Company invested, is scheduled to begin operations in January 2018.」

    While maintaining 22 operating solar power plants with total capacity of 15,759.04 kW, the Company presented plans for 2 plants, including the Kuki, Saitama Prefecture plant, with total capacity of 14,397.9 kW, and indicated that the wood biomass power plant was scheduled to begin operations in January 2018.
  28. FY2018-Q2AdvancedAnnual report

    「Two new solar power plants began operations in Ina and Chino, Nagano Prefecture. As of the end of the second quarter, 22 solar power plants with total generation capacity of 15,759.04 kW were in operation. One plant under construction or planned, in Hakui District, Ishikawa Prefecture, with total generation capacity of 13,893 kW, is scheduled to begin operations in stages. The Hakui solar power plant is scheduled to begin construction in the fiscal year ending March 2018 and be completed in the fiscal year ending March 2019. In the biomass power generation business, the Company invested in Biomass Power Technologies Co., Ltd., which is planning a 1,990 kW wood biomass power plant in Matsusaka, Mie Prefecture. The investment ratio is 10.2%. The biomass power plant in Matsusaka is scheduled to begin operations in the fiscal year ending March 2018.」

    Expanded the renewable energy business through new solar plant operations, increased planned capacity and an investment in a wood biomass power generation company.
  29. FY2018-Q1AdvancedAnnual report

    「The Company acquired new plants in Ina and Chino, Nagano Prefecture, 2 plants in total. As of the end of the first quarter, 22 solar power plants with total generation capacity of 15,759.04 kW were in operation. One plant under construction or planned, in Hakui District, Ishikawa Prefecture, with total generation capacity of 13,491.5 kW, is scheduled to begin operations in stages. The Hakui plant is scheduled to begin construction in the fiscal year ending March 2018 and be completed in the fiscal year ending March 2019.」

    Acquired 2 solar power plants in Nagano Prefecture, bringing operating plants to 22 with total capacity of 15,759.04 kW. The Company also indicated the construction and completion fiscal years for the 13,491.5 kW plant in Hakui District, Ishikawa Prefecture.
  30. FY2017AdvancedAnnual report

    「The renewable energy business, launched as a way to make effective use of land, is progressing smoothly toward its goal of constructing and operating 30 MW of solar power plants in Japan. It has developed into a business generating stable earnings and financially supporting the growth of the Group.」

    The Company set out a target to construct and operate 30 MW domestically and positioned the renewable energy business as a growth platform.
  31. FY2017-Q3AdvancedAnnual report

    「During the first 3 quarters, a plant in Kikuchi, Kumamoto Prefecture, began operations. As of the end of the period, 5 solar power plants with total generation capacity of 8,486.84 kW were in operation. A construction plan also began for 1 new plant in Hakui District, Ishikawa Prefecture. A total of 4 plants and 16 facilities under construction or planned, in Shiwa District, Iwate Prefecture, Tokachi District, Hokkaido, 13 facilities in Noda, Chiba Prefecture, and Hakui District, Ishikawa Prefecture, with total generation capacity of 18,999.56 kW, are scheduled to begin operations in stages.」

    The plant in Kikuchi, Kumamoto Prefecture, began operations, bringing operating capacity to 5 plants and 8,486.84 kW. A construction plan also began in Hakui District, Ishikawa Prefecture, bringing planned future operating capacity to 18,999.56 kW.
  32. FY2017-Q2AdvancedAnnual report

    「As of the end of the second quarter, 4 solar power plants with total generation capacity of 7,916.6 kW were in operation. Construction plans began for 3 new plants in Shiwa District, Iwate Prefecture, Kikuchi, Kumamoto Prefecture, and Noda, Chiba Prefecture, with total generation capacity of 4,128.3 kW. This brings the number of plants under construction to 4, including plants in Tokachi District, Hokkaido, Shiwa District, Iwate Prefecture, Kikuchi, Kumamoto Prefecture, and Noda, Chiba Prefecture, with total generation capacity of 6,078.3 kW. At a meeting held on 21 October 2016, the Board of Directors resolved to acquire all equity interests in Solar Park 2 GK, which holds the rights to sell electricity from a solar park in Shika, Hakui District, Ishikawa Prefecture, making it a wholly owned subsidiary. On 24 October 2016, the Company acquired 51% of the equity interests. It plans to acquire all remaining interests on 27 January 2017. The planned investment is ¥3,497.671 million, and electricity sales are scheduled to begin in the fiscal year ending March 2019.」

    While maintaining 4 operating plants with total capacity of 7,916.6 kW, the Company expanded its construction plans to 4 plants with total capacity of 6,078.3 kW. It also acquired 51% of Solar Park 2 GK and plans capital expenditure of ¥3,497.671 million, with electricity sales scheduled to begin in the fiscal year ending March 2019.
  33. FY2017-Q1AdvancedAnnual report

    「As of the end of the first quarter, 4 solar power plants with total generation capacity of 7,916.6 kW were in operation. Construction plans began for 2 new solar power plants in Shiwa District, Iwate Prefecture, and Kikuchi, Kumamoto Prefecture, with total generation capacity of 2,423.5 kW. This brings the number of solar power plants under construction to 3, including plants in Tokachi District, Hokkaido, Shiwa District, Iwate Prefecture, and Kikuchi, Kumamoto Prefecture, with total generation capacity of 4,373.5 kW.」

    Including the Hokkaido project planned in the previous fiscal year, 4 solar power plants with total generation capacity of 7,916.6 kW were in operation, and construction plans began for 2 new plants with total capacity of 2,423.5 kW.
  34. FY2016First statedAnnual report

    「Altair Solar GK Tokachi District, Hokkaido Brownfield redevelopment business Solar power generation facilities 720,000 60,098 Internal funds and borrowings May 2016 April 2017」

    The plan for solar power generation facilities specifies a total investment of ¥720 million, with work scheduled to begin in May 2016 and completion scheduled for April 2017.
Moved together

"Acquisition, remediation and resale or leasing of contaminated land" moved the same way as this thread, in the same document, in 32 of its 42 moves.

321716151514★123456
  1. ★This thread
  2. 1Acquisition, remediation and resale or leasing of contaminated land32×
  3. 2Technology Development for Newly Regulated and Difficult-to-Treat Substances17×
  4. 3A business model centered on in-situ and on-site remediation as core competitive advantages16×
  5. 4Improving the ratio of prime-contract orders and reducing the cost ratio through greater management efficiency15×
  6. 5Strengthening the Value Chain through Partnerships15×
  7. 6Stable Securing of Liquidity and Funding Sources Required for Operations14×

★ is this thread; numbers match the list above. The number on a line is how many documents both moved the same way in; lines between the other threads count the documents they moved together in too. Threads that move together often sit closer.

When this could move next
No upcoming earnings preview for EnBio Holdings,Inc yet. It last moved in the M&A and Subsidiary Changes of 2026-10-16: "Advanced".
News
No news is linked to this thread yet. When an article touches it, it will appear here by date.
Expansion of the renewable energy business | EnBio Holdings,Inc (6092) | Komori